Maskinbefal study plan
Maskinbefal · Give each week a clear focus.
8 weeks · About 7 hours per week
Marine engineering: propulsion machinery, engines and auxiliary systems
Map the propulsion plant: trace the energy flow from fuel tank to propeller shaft for a two-stroke main engine and a four-stroke auxiliary engine, and label every heat exchanger and pump on your own hand-drawn diagram.
Explain the two-stroke scavenging and uniflow exhaust process and the four-stroke valve timing sequence in writing, naming the components that fail most often in each.
Calculate indicated and brake power, specific fuel consumption and mechanical efficiency from a set of made-up indicator diagrams and fuel-flow figures, showing every step.
Describe starting-air, fuel-injection and cylinder-lubrication systems well enough to explain what happens in the first 60 seconds after a main-engine start command.
Your checkpoint
One A3 hand-drawn propulsion-plant schematic with a 400-word annotation explaining each subsystem and the three most likely failure points.
Marine engineering: propulsion machinery, engines and auxiliary systems & Maintenance, troubleshooting and machinery operation
Describe the function and operating limits of the main auxiliary systems: cooling water, lubricating oil, compressed air, fuel treatment and bilge/ballast pumping, and state what alarm would appear first if each failed.
Diagnose five written fault scenarios (high exhaust temperature, low lube-oil pressure, scavenge fire, fuel-oil viscosity fault, air-start failure) by listing symptoms, probable causes and the first three corrective actions in order.
Explain the procedure and safety precautions for starting, paralleling and stopping an auxiliary diesel generator, including blackout recovery.
Outline a weekly and monthly planned-maintenance routine for the main engine and its auxiliaries, naming the checks and the records kept.
Your checkpoint
A five-case troubleshooting log: each case with symptom list, ranked causes, corrective actions and the instrument reading that would confirm the diagnosis.
Maintenance, troubleshooting and machinery operation
Explain how to take and interpret indicator cards and pressure readings, and state what abnormal card shapes reveal about injection timing and exhaust timing.
Describe the correct response to a crankcase explosion, scavenge-space fire and exhaust-gas boiler fire, including the isolation and fixed-system actions and the reasons for each step.
Explain the safe isolation and permit-to-work sequence before opening a fuel line, a sea-water line and an electrical motor, naming the lock-out and tag-out steps.
Plan a pump overhaul from isolation to recommissioning, listing the tools, spares and checks at each stage.
Your checkpoint
A one-page machinery-operation checklist covering isolation, permit-to-work and recommissioning for one pump overhaul and one fuel-system repair.
Ship construction, stability and ship types
Explain the six degrees of freedom, the meaning of initial metacentric height and the effect of free surface on stability, using a worked example with added weights.
Calculate a ship's final draught and trim after loading or discharging a weight at a known position, showing the moment calculation.
Interpret a hydrostatic table and a KN or GZ curve to determine whether a given loading condition meets the required intact-stability criteria.
Identify the structural members of a transverse frame and explain how hull stresses (hogging, sagging, racking, panting) arise and are resisted.
Compare five ship types (bulk carrier, tanker, container ship, Ro-Ro and general cargo) by cargo-handling arrangement, structural features and typical stability issues.
Your checkpoint
A worked stability and trim calculation for one loading scenario, with the GZ curve sketched and the criteria checked, plus a one-page comparison table of five ship types.
Electrical, automation and control systems & Safety, fire protection and emergency preparedness
Explain the main switchboard, generator protection (reverse power, overcurrent, under-voltage, frequency) and preferential tripping, and describe the actions taken after a total blackout.
Describe the function and testing of the emergency generator, emergency switchboard and battery-backed emergency lighting, and state the statutory test interval you must verify in the ship's records.
Explain how a fire-detection loop, a fixed CO2 or foam system and a fire pump are arranged and tested, and what must be checked before releasing CO2 into a space.
Outline the muster-list duties and the sequence of actions for fire, abandon-ship and man-overboard drills, including the communications chain.
Explain the purpose of the shipboard oil pollution emergency plan and the safety-management-system drill records as they relate to emergency preparedness.
Your checkpoint
A written emergency-response card for blackout, engine-room fire and abandon-ship, each with the first ten actions and the person responsible.
Environmental protection and pollution prevention (MARPOL) & Safety, fire protection and emergency preparedness
State the discharge requirements of MARPOL Annex I (oily water, sludge, 15 ppm equipment) and Annex IV (sewage) and Annex V (garbage), including the record books and retention periods for each.
Explain the operation of the oily-water separator and the 15 ppm alarm, and describe the actions required when the alarm sounds during discharge.
Identify the Annex VI requirements that affect engine-room operation: sulphur limits, fuel-oil changeover procedure, NOx tiers and the ozone-depleting-substance record.
Describe the ballast-water management convention requirements for exchange, treatment and record-keeping, and the consequence of non-compliance at a port state inspection.
Explain how to complete an oil record book entry correctly and list the common deficiencies found during inspections.
Your checkpoint
A one-page compliance summary mapping each relevant MARPOL annex to its equipment, record book, retention period and most common inspection deficiency.
Maritime legislation, STCW and watchkeeping duties
Explain the STCW requirements for certification, rest hours and watchkeeping, and calculate a rest-hour record that meets the minimum requirements over a seven-day period.
Describe the master's authority and the obligations that pass to the officer of the watch, including when to call the master.
Outline the survey and certification regime (class, statutory, port state control) and explain what a certificate of class and a safety-management certificate each attest to.
Explain the content and use of the muster list, the emergency instructions and the standing orders for the engine-room watch.
Identify the pollution-reporting and casualty-reporting obligations that fall on the officer of the watch.
Your checkpoint
A completed sample rest-hour record for seven days with a written note showing how it meets the minimum rest requirements, plus a 300-word summary of OOW call-the-master criteria.
Shipboard administration, human factors and leadership & Maritime legislation, STCW and watchkeeping duties
Explain how fatigue, complacency and poor communication contribute to engine-room incidents, and describe three concrete countermeasures you would apply on watch.
Describe a structured handover between watches and a structured briefing before a hazardous job, listing the information each must contain.
Explain the purpose of the safety-management system, the near-miss reporting process and how a non-conformity is closed out.
Review your notes from weeks 1 to 7 and write a personal list of the ten weakest areas, then answer practice questions on each until you score consistently.
Your checkpoint
A 600-word leadership and human-factors briefing note covering watch handover, toolbox talk and near-miss reporting, plus a prioritised list of ten weak areas with a revision action for each.
Milestones
Week 2: Without notes, explain the energy flow of the propulsion plant and diagnose three of the five fault scenarios correctly, naming the confirming instrument reading for each.
Week 4: Complete a stability and trim calculation unaided and correctly state whether the result meets the intact-stability criteria; score at least 70% on a mixed set of domain 1-3 questions.
Week 6: Map every relevant MARPOL annex to its equipment, record book and retention period from memory, and list the first ten actions for blackout and engine-room fire without reference.
Week 8: Score at least 75% on a full mixed practice set across all eight domains, and show that every one of the ten listed weak areas has a written revision action that has been carried out.