Maskinbefal study materials
Maskinbefal study resources

Maskinbefal study plan

Maskinbefal · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Marine engineering: propulsion machinery, engines and auxiliary systems

  • Map the propulsion plant: trace the energy flow from fuel tank to propeller shaft for a two-stroke main engine and a four-stroke auxiliary engine, and label every heat exchanger and pump on your own hand-drawn diagram.

  • Explain the two-stroke scavenging and uniflow exhaust process and the four-stroke valve timing sequence in writing, naming the components that fail most often in each.

  • Calculate indicated and brake power, specific fuel consumption and mechanical efficiency from a set of made-up indicator diagrams and fuel-flow figures, showing every step.

  • Describe starting-air, fuel-injection and cylinder-lubrication systems well enough to explain what happens in the first 60 seconds after a main-engine start command.

Your checkpoint

One A3 hand-drawn propulsion-plant schematic with a 400-word annotation explaining each subsystem and the three most likely failure points.

Week 2

Marine engineering: propulsion machinery, engines and auxiliary systems & Maintenance, troubleshooting and machinery operation

  • Describe the function and operating limits of the main auxiliary systems: cooling water, lubricating oil, compressed air, fuel treatment and bilge/ballast pumping, and state what alarm would appear first if each failed.

  • Diagnose five written fault scenarios (high exhaust temperature, low lube-oil pressure, scavenge fire, fuel-oil viscosity fault, air-start failure) by listing symptoms, probable causes and the first three corrective actions in order.

  • Explain the procedure and safety precautions for starting, paralleling and stopping an auxiliary diesel generator, including blackout recovery.

  • Outline a weekly and monthly planned-maintenance routine for the main engine and its auxiliaries, naming the checks and the records kept.

Your checkpoint

A five-case troubleshooting log: each case with symptom list, ranked causes, corrective actions and the instrument reading that would confirm the diagnosis.

Week 3

Maintenance, troubleshooting and machinery operation

  • Explain how to take and interpret indicator cards and pressure readings, and state what abnormal card shapes reveal about injection timing and exhaust timing.

  • Describe the correct response to a crankcase explosion, scavenge-space fire and exhaust-gas boiler fire, including the isolation and fixed-system actions and the reasons for each step.

  • Explain the safe isolation and permit-to-work sequence before opening a fuel line, a sea-water line and an electrical motor, naming the lock-out and tag-out steps.

  • Plan a pump overhaul from isolation to recommissioning, listing the tools, spares and checks at each stage.

Your checkpoint

A one-page machinery-operation checklist covering isolation, permit-to-work and recommissioning for one pump overhaul and one fuel-system repair.

Week 4

Ship construction, stability and ship types

  • Explain the six degrees of freedom, the meaning of initial metacentric height and the effect of free surface on stability, using a worked example with added weights.

  • Calculate a ship's final draught and trim after loading or discharging a weight at a known position, showing the moment calculation.

  • Interpret a hydrostatic table and a KN or GZ curve to determine whether a given loading condition meets the required intact-stability criteria.

  • Identify the structural members of a transverse frame and explain how hull stresses (hogging, sagging, racking, panting) arise and are resisted.

  • Compare five ship types (bulk carrier, tanker, container ship, Ro-Ro and general cargo) by cargo-handling arrangement, structural features and typical stability issues.

Your checkpoint

A worked stability and trim calculation for one loading scenario, with the GZ curve sketched and the criteria checked, plus a one-page comparison table of five ship types.

Week 5

Electrical, automation and control systems & Safety, fire protection and emergency preparedness

  • Explain the main switchboard, generator protection (reverse power, overcurrent, under-voltage, frequency) and preferential tripping, and describe the actions taken after a total blackout.

  • Describe the function and testing of the emergency generator, emergency switchboard and battery-backed emergency lighting, and state the statutory test interval you must verify in the ship's records.

  • Explain how a fire-detection loop, a fixed CO2 or foam system and a fire pump are arranged and tested, and what must be checked before releasing CO2 into a space.

  • Outline the muster-list duties and the sequence of actions for fire, abandon-ship and man-overboard drills, including the communications chain.

  • Explain the purpose of the shipboard oil pollution emergency plan and the safety-management-system drill records as they relate to emergency preparedness.

Your checkpoint

A written emergency-response card for blackout, engine-room fire and abandon-ship, each with the first ten actions and the person responsible.

Week 6

Environmental protection and pollution prevention (MARPOL) & Safety, fire protection and emergency preparedness

  • State the discharge requirements of MARPOL Annex I (oily water, sludge, 15 ppm equipment) and Annex IV (sewage) and Annex V (garbage), including the record books and retention periods for each.

  • Explain the operation of the oily-water separator and the 15 ppm alarm, and describe the actions required when the alarm sounds during discharge.

  • Identify the Annex VI requirements that affect engine-room operation: sulphur limits, fuel-oil changeover procedure, NOx tiers and the ozone-depleting-substance record.

  • Describe the ballast-water management convention requirements for exchange, treatment and record-keeping, and the consequence of non-compliance at a port state inspection.

  • Explain how to complete an oil record book entry correctly and list the common deficiencies found during inspections.

Your checkpoint

A one-page compliance summary mapping each relevant MARPOL annex to its equipment, record book, retention period and most common inspection deficiency.

Week 7

Maritime legislation, STCW and watchkeeping duties

  • Explain the STCW requirements for certification, rest hours and watchkeeping, and calculate a rest-hour record that meets the minimum requirements over a seven-day period.

  • Describe the master's authority and the obligations that pass to the officer of the watch, including when to call the master.

  • Outline the survey and certification regime (class, statutory, port state control) and explain what a certificate of class and a safety-management certificate each attest to.

  • Explain the content and use of the muster list, the emergency instructions and the standing orders for the engine-room watch.

  • Identify the pollution-reporting and casualty-reporting obligations that fall on the officer of the watch.

Your checkpoint

A completed sample rest-hour record for seven days with a written note showing how it meets the minimum rest requirements, plus a 300-word summary of OOW call-the-master criteria.

Week 8

Shipboard administration, human factors and leadership & Maritime legislation, STCW and watchkeeping duties

  • Explain how fatigue, complacency and poor communication contribute to engine-room incidents, and describe three concrete countermeasures you would apply on watch.

  • Describe a structured handover between watches and a structured briefing before a hazardous job, listing the information each must contain.

  • Explain the purpose of the safety-management system, the near-miss reporting process and how a non-conformity is closed out.

  • Review your notes from weeks 1 to 7 and write a personal list of the ten weakest areas, then answer practice questions on each until you score consistently.

Your checkpoint

A 600-word leadership and human-factors briefing note covering watch handover, toolbox talk and near-miss reporting, plus a prioritised list of ten weak areas with a revision action for each.

Milestones

Week 2: Without notes, explain the energy flow of the propulsion plant and diagnose three of the five fault scenarios correctly, naming the confirming instrument reading for each.

Week 4: Complete a stability and trim calculation unaided and correctly state whether the result meets the intact-stability criteria; score at least 70% on a mixed set of domain 1-3 questions.

Week 6: Map every relevant MARPOL annex to its equipment, record book and retention period from memory, and list the first ten actions for blackout and engine-room fire without reference.

Week 8: Score at least 75% on a full mixed practice set across all eight domains, and show that every one of the ten listed weak areas has a written revision action that has been carried out.