NRCA Metal Shingle study materials
NRCA Metal Shingle study resources

NRCA Metal Shingle cheat sheet

NRCA Metal Shingle · Keep the key ideas within reach.

Quick reference

Metal Shingle Products, Materials, and Manufacturer Specifications

  • Metal shingles are formed from coil stock; common substrates are galvanized steel (G90/G60 coating weights), Galvalume (AZ50/AZ55), aluminum, and copper; each has different corrosion and coastal suitability rules.

  • Minimum steel thickness for metal shingles is typically 26 gauge (0.018 in) to 24 gauge (0.024 in); aluminum is commonly 0.024–0.032 in; thinner panels dent and oil-can.

  • Panel profiles fall into two families: interlocking stamped shingles (horizontal courses) and modular panels that mimic slate, shake, or tile; each has its own exposure, sidelap, and endlap requirements.

  • Finish systems: Kynar 500/Hylar 5000 (70% PVDF) for architectural colors, SMP/polyester for economy; PVDF holds color and chalk resistance better, and coastal salt exposure demands PVDF plus appropriate substrate.

  • Fasteners must be manufacturer-listed and matched to substrate: self-drilling screws with EPDM or neoprene washers for wood, gasketed screws for steel purlins; mixing fastener types voids warranties.

  • Fastener corrosion class (e.g., 410 stainless, 304 stainless, hot-dip galvanized) must match or exceed panel metallurgy; copper panels require stainless or copper fasteners to avoid galvanic attack.

  • Published manufacturer data govern: exposure, minimum slope, fastener spacing, clip spacing, and wind-uplift ratings (e.g., Miami-Dade/Texas Department of Insurance listings) are product-specific and must be used over generic rules of thumb.

  • Metal shingles are considered a 'through-fastened' or clip-fastened system depending on product; clip systems allow thermal movement while direct-fastened systems require slotted or oversized holes.

  • Warranty tiers (finish vs. substrate vs. weather-tightness) differ; installation defects such as overdriven fasteners or wrong underlayment typically void weather-tightness coverage.

Quick reference

Jobsite Safety and Fall Protection for Steep-Slope Metal Roofing

  • OSHA 1926.501(b)(13): employees on steep roofs (slope >4:12) must use fall protection; roofs 50 years old or less with slope ≤4:12 may use a warning line plus guardrail/monitor option, but metal shingle roofs are steep-slope work.

  • Fall protection options: guardrail systems, safety net systems, personal fall arrest systems (PFAS), or a combination; warning lines alone are not acceptable on steep slopes.

  • PFAS anchor points must support 5,000 lb per worker (or be designed by a qualified person with a 2:1 safety factor); anchorage, connectors, and lifeline must be inspected before each use.

  • Full-body harness with shock-absorbing lanyard or self-retracting lifeline; calculate total fall distance including free fall, deceleration distance, and a 3-ft safety margin above the lower level.

  • Ladder setup: extend 3 ft above the eave, 4:1 slope, secured at top; metal roofs are slippery - use roof brackets or a roof jack system with planks for working platforms on steep slopes.

  • Metal shingles and panels have sharp edges and burrs; cut-resistant gloves, safety glasses, and long sleeves are baseline PPE; coil and panel edges can slice through leather gloves.

  • Electrical hazards: metal roofing conducts; maintain 10-ft minimum clearance from energized overhead lines (per OSHA), and use non-conductive ladders near electrical sources.

  • Weather and wind: stop work when wind, rain, frost, or ice makes footing unsafe; metal surfaces become dangerously slick when wet or dusty from metal shavings.

  • Tool safety: use grounded or double-insulated power tools, keep cords off walk surfaces, and never leave fasteners or cutoffs on the roof where they create trip/slip hazards.

Quick reference

Roof Deck Preparation, Underlayment, and Ice Dam Protection

  • Deck must be sound, flat, and dry; replace rotted sheathing, re-nail loose boards, and correct sagging before installing underlayment or panels.

  • Minimum decking for metal shingles is typically 15/32-in or 7/16-in OSB or nominal 1-in wood boards, per manufacturer; some products require solid sheathing with no gapping beyond 1/8 in.

  • Deck fasteners must be flush or countersunk; protruding nail heads telegraph through underlayment and metal, causing oil-canning and premature wear.

  • Ice dam protection: an ice barrier membrane (self-adhering) is required at eaves from the eave edge to a point at least 24 in inside the exterior wall line (IRC R905.1.2), and in valleys.

  • Underlayment for metal shingles is typically a high-temperature synthetic (e.g., 30-lb felt equivalent or heavier) or a peel-and-stick membrane; some manufacturers require a slip sheet or separator to prevent sticking and allow movement.

  • Overlap underlayment per manufacturer (commonly 4–6 in side laps, 6–12 in end laps) and run it horizontally, lapping upper courses over lower courses to shed water.

  • Valleys and penetrations receive extra underlayment: a minimum 36-in-wide strip centered in the valley (18 in each side) or a W-rolled valley lining, per manufacturer.

  • Ventilation path: underlayment must not block soffit or ridge vent openings; maintain a clear air path from eave to ridge.

  • Fasten underlayment with cap nails or manufacturer-approved fasteners at prescribed spacing; staples alone may not meet wind or code requirements.

Quick reference

Metal Shingle Layout, Alignment, and Fastening

  • Establish a level chalk line at the eave and a plumb reference line at the rake or center; metal shingle courses are laid to level lines, not to the deck edge, because deck edges are rarely square.

  • Compute exposure and course count: divide the rafter length (or slope length) by the manufacturer's published exposure; adjust the top course or eave starter to avoid a partial course at the ridge.

  • Starter course: install the manufacturer's starter strip or eave trim first; the starter sets the first course height and must be level around the entire perimeter.

  • Horizontal alignment is maintained with chalk lines every course; vertical alignment is maintained by measuring from a fixed plumb line at intervals, not by trusting panel edges.

  • Fastening: place fasteners in the manufacturer's designated nailing/screw zone (typically the upper portion of the panel or the lock flange), never through the exposed face or in the water channel.

  • Fastener spacing typically ranges 6–12 in on center along the fastening flange, with additional fasteners at gable ends, ridges, and hips for wind uplift; follow the product's uplift listing.

  • Do not overdrive fasteners: the washer should be snug, not compressed past flat; overdriving deforms the panel, cracks washers, and creates leaks.

  • Thermal movement: clip-fastened systems allow panels to float; direct-fastened systems require slotted holes or oversized pilot holes so panels can expand and contract without buckling.

  • Stagger endlaps and sidelaps between courses as required by the profile; align panel locks fully engaged before fastening, and check each course for level before proceeding.

Quick reference

Flashing, Penetrations, Valleys, and Edge Metal Details

  • Valleys: open valleys use metal valley pans (typically 24 in wide, 12 in each side) under the shingles; closed valleys use a valley lining with shingle edges cut back to the valley centerline per manufacturer.

  • Valley metal must extend at least 12 in up each roof plane and be fastened at the upper edge only so it can move; do not fasten through the center of the pan.

  • Ridge and hip: use manufacturer's ridge cap or field-formed hip/ridge; hip flashing must lap over the shingle courses and be fastened on the concealed flange.

  • Sidewall flashing: step flashing (one piece per course) interleaved with the shingle courses, plus a counterflashing reglet in masonry; step flashing must lap the shingle below and be covered by the shingle above.

  • Headwall flashing: a single piece with a 4–6 in vertical leg and a 4–6 in horizontal leg, lapped over the top course and sealed with approved sealant; a cricket is required when a headwall width exceeds the manufacturer's threshold (commonly 30 in).

  • Eave and rake edge metal: eave trim or drip edge is installed under the underlayment at the eave and over the underlayment at the rake (or per manufacturer), with a drip leg that clears the fascia.

  • Penetrations: use manufactured boots or flashing plates matched to pipe diameter, set in sealant, with the upper flange lapped by the shingle course above; large penetrations require a curb with flashing.

  • Skylights and chimneys: flash with a curb, step flashing on sides, and a cricket/backer flashing on the uphill side; sealant alone is not a flashing.

  • Fastener and sealant rules: use only manufacturer-approved sealants (typically neutral-cure silicone or polyurethane) and place fasteners so they are covered by the next course where the profile allows.

Quick reference

Ventilation, Thermal Movement, and Moisture Management

  • Balanced ventilation: net free area (NFA) should be roughly equal at the eave (intake) and ridge (exhaust), typically 1 sq ft of NFA per 150 sq ft of attic floor area, or 1:300 with a vapor retarder and balanced vents (IRC R806).

  • Ventilation reduces condensation on the underside of metal panels and deck; without intake at the soffit, ridge vents cannot exhaust and moisture accumulates.

  • Thermal movement: metal expands and contracts with temperature; a 20-ft steel panel can move roughly 1/8–1/4 in over a 100°F swing (coefficient of thermal expansion ~6.5×10⁻⁶/°F for steel, ~13×10⁻⁶/°F for aluminum).

  • Clip-fastened systems accommodate movement by allowing panels to slide; direct-fastened systems rely on slotted holes, oversized holes, and fastener placement near the panel's fixed point.

  • Never fasten both ends of a long panel rigidly; fix at one point and allow movement toward the other end, or use the manufacturer's specified clip layout.

  • Condensation control: a vapor retarder on the warm side of the insulation, plus ventilation above the insulation, keeps the cold metal surface dry; metal roofing is a cold-deck system unless a thermal break is provided.

  • Thermal breaks (e.g., a rigid insulation layer or a separation sheet) reduce condensation and prevent the panel from conducting heat/cold into the structure.

  • Avoid trapping moisture: use breathable or properly lapped underlayment and do not sandwich the deck between two vapor-impermeable layers.

  • Ridge and soffit vent sizing must be confirmed against the manufacturer's and code requirements; undersized ridge venting is a common cause of attic condensation complaints.

Quick reference

Inspection, Repair, and Code Compliance

  • Inspection sequence: deck condition and fastener flushness → underlayment laps and ice barrier → starter/edge metal → course level and plumb → fastener placement and engagement → flashing and valleys → ridge and vents.

  • Fastener inspection: check that every fastener is in the designated zone, driven straight, and snug (washer not crushed); overdriven or missed-fastener counts above the manufacturer's tolerance require repair.

  • Wind uplift compliance is verified against the product's listing (e.g., Miami-Dade NOA, TDI) and the required design pressure for the site; installation must match the listed fastener pattern exactly.

  • Code references: IRC Chapter 9 (R905.10 for metal roofing, R905.1.2 for ice barriers), IBC Chapter 15, and local amendments; manufacturer instructions govern where they are more restrictive.

  • Repair of a damaged shingle: remove fasteners, lift the course above, replace the panel, and re-fastener in the designated zone; do not patch with sealant alone on the exposed face.

  • Leak diagnosis: check penetrations, valleys, sidewalls, and fastener lines first; water often enters at a flashing lap and travels laterally along the underlayment before showing inside.

  • Cosmetic vs. functional defects: oil-canning, minor scratches, and color variation are often cosmetic; corrosion, loose panels, and lifted flashing are functional and warrant repair.

  • Documentation: photograph deck, underlayment, flashing, and fastener patterns before cover; retain manufacturer installation instructions and warranty documents for closeout.

  • Final inspection should confirm ventilation NFA, flashing heights, edge metal clearance, and that no fasteners penetrate the panel face or water channel.