NRCA Metal Shingle study plan
NRCA Metal Shingle · Give each week a clear focus.
8 weeks · About 6 hours per week
Metal shingle products, materials, and manufacturer specifications & Metal shingle layout, alignment, and fastening
Build a one-page comparison table of metal shingle product types (stamped vs. modular panels, aluminum vs. steel vs. copper) listing panel dimensions, exposed exposure width, minimum slope per manufacturer, and weight per square
Define and correctly use at least 15 trade terms in writing: exposure, course, pan, seam, nailing flange, clip, hem, drip edge, valley pan, closure strip, underlayment lap, eave, rake, ridge, hip
Read two manufacturer installation manuals end to end and list every explicit field requirement (fastener type, fastener count per shingle, deck fastener schedule, minimum slope, substrate thickness) in a checklist
Sketch a roof plan of a simple gable with a 6:12 slope and calculate squares, starter course quantity, and ridge cap count using published coverage figures
Identify which listed panel and fastener specifications control the layout math and explain why in three sentences
Your checkpoint
A single reference sheet: product comparison table plus a fastener and substrate specification checklist drawn from two manufacturer manuals
Metal shingle products, materials, and manufacturer specifications & Roof deck preparation, underlayment, and ice dam protection
Sequence the deck-to-finish assembly in writing for a 4:12 and a 3:12 roof, naming each layer and its purpose
Specify deck requirements: sheathing thickness, fastener schedule, gap tolerances, and flatness tolerance, citing where each number comes from
Select an underlayment type for each of three slope and climate scenarios and justify each choice against manufacturer and code minimums
Lay out an ice dam protection membrane zone for a 6:12 roof with a 24-inch eave overhang and describe where the membrane terminates relative to the warm wall line
Explain how underlayment laps, side laps, and end laps change with slope and describe the consequence of reversing a lap
Your checkpoint
A labeled cross-section drawing of the roof assembly for two slopes with a written layer-by-layer specification table
Metal shingle layout, alignment, and fastening
Establish layout control lines for a gable roof: chalk a level line at the eave, mark a perpendicular reference line, and describe how to verify square
Compute course spacing and starter offset for a given panel exposure and confirm the top course lands correctly at the ridge
Write a step-by-step fastening procedure covering fastener placement in the nailing flange, fastener type and length for each substrate, drive depth, and pattern
Diagnose four common alignment failures (stair-stepping, racked courses, oil-canning, uneven exposure) and state the correction for each
Plan a roof-to-wall and roof-to-valley layout so panel edges land on framing rather than in a pan or on a seam
Your checkpoint
A written layout and fastening procedure with a marked-up roof plan showing control lines, course spacing, and fastener pattern
Metal shingle layout, alignment, and fastening & Flashing, penetrations, valleys, and edge metal details
Detail a valley: lay out a woven, open, and closed valley in plan view and state which metal shingle products accept each method
Detail eave and rake edge metal: select drip edge profile, specify underlayment over or under the flange, and state fastener spacing
Detail sidewall, headwall, and step flashing at a roof-to-wall intersection including pan flashing and counterflashing heights
Detail a pipe penetration and a vent boot with the correct collar, sealant, and shingle interface
Explain how thermal movement allowance affects where panels are fixed versus where they float at valleys and walls
Your checkpoint
A detail packet of six hand-drawn flashing details, each annotated with dimensions, materials, and fastener spacing
Flashing, penetrations, valleys, and edge metal details & Jobsite safety and fall protection for steep-slope metal roofing
Write a fall protection plan for a 7:12 roof naming anchor type, lifeline or rope grab arrangement, and rescue plan, and identify the trigger height that requires protection
List the personal protective equipment and ladder setup requirements for steep-slope metal roofing and state the inspection steps before each use
Describe safe handling and cutting of metal panels: cut method, edge burr control, and metal shaving cleanup to prevent staining
Detail ridge, hip, and closure strip installation so the assembly sheds water and allows ventilation
Identify the hazards specific to metal roofing (electrical contact, wind uplift during staging, sharp edges, heat) and the control for each
Your checkpoint
A one-page jobsite safety plan covering fall protection, ladder placement, cutting, and shaving cleanup, plus a completed flashing detail for a hip and ridge
Ventilation, thermal movement, and moisture management & Roof deck preparation, underlayment, and ice dam protection
Calculate net free ventilation area for a given attic floor area and balance intake and exhaust within the code ratio
Compare ridge vent, static vent, and gable vent options for a metal shingle roof and state the tradeoffs for each
Explain how thermal movement in metal shingles and panels is accommodated at fasteners, clips, and terminations, and describe the failure mode when it is not
Identify moisture management layers and describe what happens to each when a vapor retarder is misplaced or an underlayment is omitted
Diagnose condensation versus leak symptoms from a written scenario and state the corrective action
Your checkpoint
A ventilation calculation worksheet for a sample attic with a written recommendation, plus a one-page thermal movement and moisture control summary
Inspection, repair, and code compliance & Flashing, penetrations, valleys, and edge metal details
Build an inspection checklist covering deck, underlayment, ice dam membrane, layout, fasteners, flashing, edge metal, and ventilation, with a pass or fail criterion for each line
Write the punch-list language for five defects found in a written scenario (exposed fasteners, short laps, reversed laps, missing closure, overdriven fasteners) and the repair method for each
Locate the code provisions that govern underlayment, ice dam protection, fastener corrosion resistance, and attic ventilation and summarize each in one sentence
Describe a repair sequence for replacing a damaged metal shingle in the middle of a field without disturbing adjacent courses
Explain how to document an inspection with photos and measurements so it supports a code or warranty position
Your checkpoint
A complete inspection checklist with pass or fail criteria and a sample punch list of five defects with repair steps
Metal shingle products, materials, and manufacturer specifications & Metal shingle layout, alignment, and fastening & Flashing, penetrations, valleys, and edge metal details & Inspection, repair, and code compliance
Take a 60-question timed practice exam across all domains and score it by domain
Re-study the two lowest-scoring domains and rewrite the reference sheet sections that cover them
Recite from memory the key numbers: minimum slope, fastener count per shingle, underlayment lap, ice dam membrane extent, ventilation ratio
Walk through two full scenarios (a re-roof over existing shingles and a new build with two valleys and a sidewall) and list the sequence and the controlling specification for each step
Explain aloud, in under five minutes each, the layout procedure, the valley detail, and the fall protection plan
Your checkpoint
A scored practice exam with a written remediation log naming each missed item, the correct answer, and the source reference
Milestones
Week 2: Can state the minimum slope and deck and underlayment requirements for two products without notes, and correctly order every layer in the roof assembly
Week 4: Scores at least 80 percent on a self-made 15-question layout and fastening quiz and can draw the valley and sidewall details from memory
Week 6: Completes the ventilation calculation correctly and explains thermal movement and moisture failure modes in writing without reference
Week 8: Scores at least 80 percent overall on the timed practice exam with no domain below 70 percent