Energy use intensity (EUI) = annual site energy use (kBtu or kWh) ÷ conditioned floor area; compare like-for-like building types only.
Degree days drive weather-normalized baselines: heating degree days use base 18.3 °C (65 °F); cooling degree days use the same base, summing daily mean temperature deviations.
Load factor = average load ÷ peak load over a period; a low load factor signals demand-charge reduction potential through peak shaving.
Power factor = kW ÷ kVA; correction capacitors reduce reactive kVA, cutting kVA demand charges but not kWh consumption.
Energy savings measure screening order: no-cost operational changes first, then controls/tuning, then capital retrofits; verify each with measurement and verification.
Simple payback (years) = installed cost ÷ annual savings; it ignores time value of money, so pair it with life-cycle cost or IRR for capital decisions.
IPMVP options: A (retrofit isolation, key parameters measured), B (retrofit isolation, all parameters measured), C (whole facility utility meter), D (calibrated simulation).
Motor and fan affinity laws: flow scales linearly with speed, pressure with the square, power with the cube - a 20% speed reduction cuts power about 49%.
Energy Service & Commissioning
Commissioning (Cx) phases: pre-design, design, construction, acceptance, and post-acceptance/warranty; each phase ends with a documented deliverable.
Functional performance test (FPT) proves a system meets design intent under modes of operation; it differs from a static installation check.
Retro-commissioning applies Cx to existing buildings without major capital work; typical savings of 5–15% come from tuning and fault correction.
Monitoring-based commissioning (MBCx) uses trend data and fault detection diagnostics to persist savings after the initial Cx effort.
Energy performance contract (EPC) guarantees savings; measurement and verification per IPMVP underpins the guarantee and the shared-savings split.
Energy service company (ESCO) models: guaranteed savings, shared savings, and chauffage/outsourcing; the client's balance-sheet treatment differs by model.
Sequence of operations is the reference document for Cx testing; a missing or vague sequence is itself a common Cx finding.
ASHRAE Guideline 0 covers the Cx process and ASHRAE Guideline 1.1 covers HVAC&R commissioning; both define owner's project requirements (OPR) as the anchor.
Sustainable Development
Triple bottom line evaluates projects on economic, environmental, and social performance rather than financial return alone.
Greenhouse gas accounting scopes: Scope 1 direct fuel combustion, Scope 2 purchased electricity/heat, Scope 3 value-chain emissions.
Life-cycle assessment stages: goal and scope, inventory analysis, impact assessment, and interpretation (ISO 14040/14044).
Embodied carbon is the upfront and cradle-to-grave carbon in materials; operational carbon is energy use in service - whole-life carbon sums both.
Renewable energy credit (REC) markets: one REC represents 1 MWh of renewable generation; bundled vs unbundled determines the claim.
Demand-side vs supply-side sustainability measures: efficiency and load shifting reduce demand; on-site renewables and storage shift supply.
Circular economy hierarchy: refuse, reduce, reuse, repair, remanufacture, recycle, recover - disposal is the last resort.
Utility Services
Electricity tariff components: energy charge (per kWh), demand charge (per kW of billed demand), and fixed customer charge; each responds to different measures.
Billed demand is often the maximum 15- or 30-minute interval kW in the billing month, sometimes ratcheted to a prior-year peak.
Time-of-use rates price energy by period (on-peak, mid-peak, off-peak); load shifting moves consumption to lower-cost periods.
Real-time or hourly pricing exposes customers to wholesale prices; hedging and demand response manage the price risk.
Demand response programs pay for verified load curtailment during grid events; baseline methods (e.g., 10-of-10 or high-5-of-10) determine the credited reduction.
Utility bill audit checks: meter multiplier, rate schedule appropriateness, power factor penalty, ratchet clause, and tax or rider application.
Net metering credits on-site generation against consumption; the compensation rate and true-up rules vary by jurisdiction and program.