Energy Use Intensity
Annual energy consumed per unit of floor area, expressed in kBtu/ft² or kWh/m². It normalizes consumption so buildings of different sizes can be benchmarked against peers of the same type.
Load Factor
Average load divided by peak load over a defined period. A low value means demand is spiky, so demand-charge savings from peak shaving are likely to be large.
Power Factor Correction
Adding capacitors to offset inductive reactive power, raising the kW-to-kVA ratio. It reduces kVA demand charges and releases capacity but does not lower kWh consumption.
Simple Payback Period
Installed project cost divided by annual energy cost savings, expressed in years. It is easy to compute but ignores the time value of money and savings after payback.
Affinity Laws
For fans and pumps, flow varies with speed, pressure with the square of speed, and power with the cube. Modest speed reductions therefore yield large power savings.
Heating Degree Day
The sum over a period of daily mean temperature deficits below a base, commonly 18.3 °C. It quantifies weather severity for normalizing heating energy use.
IPMVP Option C
A measurement and verification approach using whole-facility utility meter data. It suits multi-measure retrofits where individual end-use metering is impractical or uneconomic.
Demand Charge
A tariff component billed per kW of maximum interval demand in the billing period. It targets capacity cost and is reduced by peak shaving, not by total kWh reduction alone.
Functional Performance Test
A commissioning test that operates a system through its modes of operation to confirm it meets design intent. It goes beyond verifying that equipment is installed correctly.
Retro-commissioning
Applying the commissioning process to an existing building without major capital investment. It typically finds tuning and control faults that yield several percent in energy savings.
Owner's Project Requirements
A written document stating the owner's functional needs, performance targets, and constraints for a project. It anchors design review and commissioning test planning.
Monitoring-Based Commissioning
Ongoing use of trend data and fault detection diagnostics to sustain and extend commissioning savings. It replaces one-time tuning with persistent performance tracking.
Energy Performance Contract
An agreement where an energy service company implements improvements and guarantees a level of savings. Verified savings fund the project and back the guarantee.
Shared Savings Contract
An energy services model where the provider is paid a negotiated share of measured savings. The client bears less fixed cost but shares the upside.
Sequence of Operations
A document describing how equipment and controls respond to conditions and modes. Commissioning tests are written against it, and vague sequences are common findings.
Commissioning Authority
An independent party leading the commissioning process, from design review through functional testing and acceptance. Independence from the design and construction team is a core principle.
Measurement and Verification Plan
A project document defining boundaries, baseline, metering approach, and adjustment methods for verifying savings. It follows an IPMVP option and is agreed before implementation.
Triple Bottom Line
A decision framework weighing economic, environmental, and social performance together. It broadens project appraisal beyond financial return to include community and ecological effects.
Scope 2 Emissions
Indirect greenhouse gas emissions from purchased electricity, heat, or steam. They are reported using either location-based or market-based grid emission factors.
Embodied Carbon
Greenhouse gas emissions associated with extracting, manufacturing, transporting, and disposing of building materials. It is distinct from emissions from operating the building.
Life-Cycle Assessment
A structured method to quantify environmental impacts across a product's life. Its stages are goal and scope, inventory, impact assessment, and interpretation.
Renewable Energy Credit
A tradable certificate representing the environmental attributes of one megawatt-hour of renewable generation. Bundling with electricity or buying it separately changes the claim.
Circular Economy
A resource strategy that keeps materials in use through reuse, repair, remanufacture, and recycling. It prioritizes waste prevention over disposal at end of life.
Net-Zero Energy Building
A building that produces, typically on site, as much renewable energy as it consumes over a year. Boundaries and export credit rules must be defined explicitly.
Science-Based Target
An emissions reduction goal aligned with climate science, such as limiting warming to 1.5 °C. It is validated against a recognized methodology rather than chosen arbitrarily.
Time-of-Use Rate
A tariff pricing electricity differently by time period, with higher on-peak and lower off-peak rates. Shifting flexible loads to cheaper periods reduces the bill.
Billed Demand Ratchet
A clause billing demand as the greater of current-month peak or a percentage of a prior high month. It penalizes seasonal peaks long after they occur.
Demand Response
A program paying customers to reduce load during grid events or high prices. Credited reduction is measured against an agreed baseline of normal consumption.
Net Metering
A billing arrangement crediting customer generation exported to the grid against consumption. Compensation rate and annual true-up rules vary by jurisdiction.
Utility Bill Audit
A systematic check of meter multipliers, rate schedule fit, power factor penalties, ratchets, and rider application. Errors found often produce refunds or tariff changes.
Interval Data
Metered consumption recorded in fixed increments, commonly 15 or 30 minutes. It reveals load shapes and the peaks that set demand charges.