NRPP RMS study plan
NRPP RMS · Give each week a clear focus.
8 weeks · About 6 hours per week
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards)
Map the Domain 1 blueprint into a one-page checklist of measurement tasks: device placement, closed-building conditions, deployment and retrieval, chain of custody, and reporting.
Define and recite the core physics vocabulary (radon, radon decay products, half-life, picocurie per liter, working level, equilibrium ratio) without notes.
Distinguish the device families (charcoal canister, alpha-track, electret ion chamber, continuous radon monitor, charcoal liquid scintillation) by deployment duration, sensitivity, and interference risks.
Walk through the closed-building protocol steps and state why each step exists before any device is placed.
Your checkpoint
A one-page comparison table of five measurement device types with deployment duration, typical use case, and one failure mode each.
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards)
Sequence a full measurement event from client call to final report, listing every document generated at each step.
Apply the correct test-duration choice (short-term versus long-term) to five written client scenarios and justify each choice.
Identify quality-assurance components: duplicates, blanks, spikes, cross-checks, and calibration records, and state the acceptance criterion for each.
Interpret a sample result set against the applicable action level and write the client recommendation in plain language.
Your checkpoint
A written 48-hour test plan for a two-story home with a basement, including placement sketch described in words, QA samples, and the report outline.
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards)
Diagnose five written measurement errors (device moved, windows opened, HVAC running, device retrieved late, improper placement height) and state the corrective action for each.
Explain the difference between measurement and mitigation professional responsibilities at the handoff point.
Practice the client-communication script for delivering an elevated result, including what not to promise.
Complete a timed 25-question Domain 1 self-quiz and log every missed concept with a one-line correction.
Your checkpoint
An error log of at least 15 missed or uncertain Domain 1 concepts, each rewritten as a correct one-sentence rule.
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards) & Radon Mitigation and Soil Gas (mitigation specialist scope, per NRPP Mitigation Specialist Exams and applicable ANSI/AARST mitigation standards)
Define soil gas and pressure-field concepts: soil gas concentration, permeability, pressure differential, stack effect, and communication between soil and building.
Explain the driving forces that move soil gas into a building and rank them by typical influence.
Compare sub-slab depressurization, sub-membrane depressurization, and drain-tile/block-wall depressurization by site condition.
Describe the diagnostic steps before system design and what each diagnostic measurement tells the designer.
Your checkpoint
A written diagnostic sequence for one described house (slab-on-grade, one story, sandy soil) with the purpose of each measurement.
Radon Mitigation and Soil Gas (mitigation specialist scope, per NRPP Mitigation Specialist Exams and applicable ANSI/AARST mitigation standards)
Lay out the components of an active soil depressurization system and state the function of each: suction point, piping, fan, discharge location, sealing, and system monitor.
Size and route piping for three described buildings, stating the reasoning for diameter, slope, and termination point.
List the sealing and closure details required at penetrations, sumps, and crawlspace membranes.
Explain how the system monitor and a post-mitigation test confirm performance.
Your checkpoint
A component-by-component system design narrative for one described building, covering suction point, piping route, fan placement, discharge, and monitor.
Radon Mitigation and Soil Gas (mitigation specialist scope, per NRPP Mitigation Specialist Exams and applicable ANSI/AARST mitigation standards)
Diagnose five written system failures (fan failure, blocked discharge, water in piping, inadequate suction field, backdrafting combustion appliances) and state the fix and the safety check.
Explain combustion-appliance safety testing and when it must be performed relative to system startup.
Describe post-mitigation verification: who tests, when, under what building conditions, and what result counts as success.
Draft the homeowner operating and maintenance instructions for a completed system.
Your checkpoint
A one-page homeowner handoff sheet covering system operation, monitor meaning, maintenance interval, and who to call.
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards) & Radon Mitigation and Soil Gas (mitigation specialist scope, per NRPP Mitigation Specialist Exams and applicable ANSI/AARST mitigation standards)
Complete two timed mixed-domain practice sets and tag each miss by domain and by cause (knowledge gap, misread, or guess).
Re-teach the ten weakest concepts from memory in writing, then check against your notes.
Reconcile overlapping standards concepts: which requirements differ between measurement and mitigation work and which are shared.
Build a one-page formula and definition sheet you can reconstruct from memory.
Your checkpoint
A cause-tagged error analysis of at least 30 missed questions, with a re-teach note for the ten weakest concepts.
Radon Measurement (measurement professional scope, per NRPP Measurement Professional Exam and applicable ANSI/AARST measurement standards) & Radon Mitigation and Soil Gas (mitigation specialist scope, per NRPP Mitigation Specialist Exams and applicable ANSI/AARST mitigation standards)
Take two full-length timed practice exams under exam conditions and record section timing.
Review only tagged weak concepts, not full content, in the final days.
Rehearse the reconstruction of the formula and definition sheet from blank paper.
Finalize exam-day logistics: identification, arrival time, calculator policy, and break strategy.
Your checkpoint
A final weak-concept list of no more than 15 items, each with a one-line correct statement, plus both practice exam scores logged.
Milestones
Week 2: You can explain, without notes, why each closed-building condition exists and name the QA samples required for a short-term test.
Week 4: You can rank soil gas entry driving forces and match three depressurization strategies to their site conditions in under five minutes.
Week 6: You can describe a complete system from suction point to monitor and name the combustion-safety check required before handoff.
Week 8: Both timed practice exams are complete with scores logged, and your final weak-concept list is 15 items or fewer.