NTN REACT study materials
NTN REACT study resources

NTN REACT cheat sheet

NTN REACT · Keep the key ideas within reach.

Quick reference

Reactor Theory and Nuclear Physics

  • Multiplication factor: k = (neutrons produced in generation n+1)/(neutrons produced in generation n); k = 1 critical, k > 1 supercritical, k < 1 subcritical.

  • Six-factor formula: k = ε·p·f·η·P_FNL·P_TNL, where ε is fast fission factor, p resonance escape probability, f thermal utilization, η reproduction factor, and the two terms are fast and thermal non-leakage probabilities.

  • Reactivity: ρ = (k − 1)/k, expressed in dollars as ρ/$ where $ = β (delayed neutron fraction, about 0.0065 for U-235 thermal fission).

  • Prompt neutron lifetime ℓ and generation time Λ relate to the stable reactor period via the inhour equation; for small positive ρ, T ≈ Λ/ρ.

  • Delayed neutrons (about 0.65% of fissions in U-235) make reactors controllable; the reactor is prompt critical when ρ ≥ β.

  • Point kinetics: dn/dt = [(ρ − β)/Λ]n + Σλ_i C_i, with six delayed precursor groups; effective delayed fraction β_eff depends on core composition.

  • Four-factor formula for an infinite lattice: k∞ = ε·p·f·η; leakage is accounted for by adding the non-leakage probabilities P_FNL and P_TNL.

  • Xenon-135 poisoning: peak post-shutdown reactivity worth occurs roughly 8–10 hours after shutdown due to I-135 decay outpacing Xe burnout; equilibrium Xe worth is largest at high flux.

  • Samarium-149 is a stable poison approaching equilibrium slowly (half-life of its precursor Pm-149 is about 53 hours); it does not burn out appreciably.

Quick reference

Reactor Operations and Control

  • Startup is performed on the source range (count rate) instruments; approach-to-critical uses the inverse count rate (1/M) plot, and 1/M extrapolates to zero at criticality.

  • Criticality safety rule: maintain at least two independent, diverse indications of criticality (e.g., startup channels and intermediate range) before withdrawing control rods further.

  • Control rod worth is measured by the rod drop method or the period (doubling time) method; integral worth curves are S-shaped, with differential worth peaking near mid-core.

  • Temperature coefficients: a negative moderator temperature coefficient provides inherent load-following and shutdown feedback; a positive coefficient requires administrative limits on power level.

  • Power defect is the reactivity change from zero to full power caused by Doppler, moderator temperature, and void feedback; it must be compensated by rod withdrawal.

  • Shutdown margin is the reactivity worth of all rods minus the highest-worth rod stuck fully withdrawn, with the reactor at power and equilibrium poisons; it must remain positive.

  • Boration/dilution controls long-term reactivity: boron concentration changes are made in small steps with mixing time allowed before evaluating reactivity response.

  • Surveillance testing of rod exercise, trip breakers, and instrument channels is required at defined intervals; failure to complete surveillance within the grace period requires a shutdown or power reduction.

Quick reference

Radiation Protection and Health Physics

  • Dose quantities: absorbed dose in gray (1 Gy = 1 J/kg); equivalent dose in sievert = absorbed dose × radiation weighting factor w_R (photons = 1, neutrons = 2–20 depending on energy, alpha = 20).

  • Occupational dose limits (ICRP/typical national): 20 mSv/y averaged over 5 years, 50 mSv in any single year; lens of eye 20 mSv/y; extremities and skin 500 mSv/y.

  • Public dose limit: 1 mSv/y from licensed practices; the ALARA principle requires doses to be as low as reasonably achievable, economic and social factors considered.

  • Inverse square law: dose rate falls as 1/r²; doubling distance from a point source reduces dose rate to one quarter.

  • Shielding: half-value layer (HVL) reduces intensity by half; attenuation I = I₀·e^(−μx), and HVL = ln2/μ.

  • Contamination control: survey with a thin-window detector for beta emitters; smear (wipe) tests detect removable contamination; fixed contamination requires decontamination or shielding.

  • Neutron dose is measured with rem-meters or TLDs with neutron-sensitive elements; gamma dose with ionization chambers or TLDs; use energy-compensated instruments for mixed fields.

  • Derived air concentration (DAC) and annual limit on intake (ALI) are used to control airborne radioactive material; DAC-based monitoring is required in areas where airborne activity may exceed specified fractions.

Quick reference

Nuclear Safety and Emergency Procedures

  • Defense in depth: multiple independent barriers (fuel matrix, cladding, primary boundary, containment) and redundant safety systems protect against release of fission products.

  • Emergency classification levels typically escalate: Notification of Unusual Event → Alert → Site Area Emergency → General Emergency, based on actual or potential radiological impact.

  • Emergency action levels (EALs) are pre-defined instrument readings or conditions that trigger each classification; they must be based on measurable parameters.

  • Emergency core cooling system (ECCS) acceptance criteria (10 CFR 50.46): peak cladding temperature ≤ 2200°F (1204°C), cladding oxidation ≤ 17% of initial thickness, and coolable geometry maintained.

  • Critical safety functions: reactivity control, reactor coolant inventory, heat removal, and containment integrity; emergency operating procedures are symptom-based, not event-based.

  • SCRAM (reactor trip) inserts all control rods by gravity or spring force; failure of a single rod to insert must not prevent safe shutdown (single-failure criterion).

  • Post-accident monitoring: containment hydrogen concentration is controlled to below 4% (flammability limit) by recombiners or venting; hydrogen is generated by zirconium-water reaction and radiolysis.

  • Emergency plan exercises and drills are required at defined frequencies (e.g., biennial full-scale exercises) with evaluated corrective actions for identified deficiencies.

Quick reference

Reactor Systems and Components

  • Pressurized water reactor (PWR): primary coolant at ~15.5 MPa (2250 psig) with subcooled liquid; steam generator secondary side produces saturated steam at ~6–7 MPa.

  • Boiling water reactor (BWR): direct cycle; reactor coolant boils in the core at ~7 MPa (1000 psia); steam separators and dryers produce ~99.9% quality steam to the turbine.

  • Primary coolant pumps provide forced circulation; loss of forced flow (natural circulation) reduces heat removal capability and may require power reduction or trip.

  • Pressurizer maintains primary pressure via heaters (raise pressure) and spray (lower pressure); it also accommodates coolant volume changes during power maneuvers.

  • Steam generator tubes are a boundary between primary and secondary; tube degradation is monitored by eddy current testing, and tube plugging reduces heat transfer area.

  • Containment systems include the containment spray, fan coolers, and isolation valves; containment isolation valves must close on a containment isolation signal.

  • Residual heat removal (RHR) system removes decay heat after shutdown and cools the refueling pool; it requires adequate coolant inventory and flow path alignment.

  • Safety injection systems (high-pressure and low-pressure) inject borated water to restore inventory and reactivity control after a loss-of-coolant accident.

Quick reference

Instrumentation and Control

  • Source range (startup) detectors are proportional counters sensitive to individual neutrons; count rate is proportional to neutron population and used during shutdown and startup.

  • Intermediate range uses compensated ion chambers; log power is measured in decades per minute (DPM); high flux trip setpoints are typically around 10–40% of rated power.

  • Power range uses uncompensated ion chambers; the axial offset (AO) is (top power − bottom power)/(top + bottom power), used to monitor core power distribution.

  • Redundancy and diversity: safety-related instrumentation uses at least two or three independent channels with coincident logic (2-out-of-4 voting) to avoid spurious trips and failure to trip.

  • Setpoint uncertainty includes instrument accuracy, calibration error, and drift; trip setpoints must be established so the safety limit is not exceeded even with uncertainty.

  • Period meters measure reactor period T = (ln 2)/λ; a period of 18 seconds corresponds to a doubling time of 18 seconds and is a typical startup alarm threshold.

  • In-core detectors (fission chambers or self-powered neutron detectors) map local flux to verify power distribution and detect localized anomalies.

  • Control systems include manual, automatic, and computer-based controls; safety-related controls must be qualified to environmental and seismic standards (IEEE 323, IEEE 344).

Quick reference

Regulatory Requirements and Documentation

  • Technical specifications (Tech Specs) define limiting conditions for operation (LCOs), surveillance requirements, and action statements with completion times.

  • Safety limits are the limits on important process variables (e.g., fuel cladding temperature, primary pressure) that must not be exceeded; safety system settings are setpoints that protect the safety limits.

  • 10 CFR 50 Appendix B establishes the quality assurance criteria for nuclear facilities; 10 CFR 50.59 governs changes to the facility without prior license amendment.

  • Design basis accidents (DBAs) are the postulated accidents against which the facility is designed; beyond-design-basis events are addressed by probabilistic risk assessment (PRA).

  • Operating license conditions include the license expiration date, authorized power level, and required reports; license renewal is typically for 20 additional years.

  • Event reporting: 10 CFR 50.72 requires immediate notification of specified events, and 10 CFR 50.73 requires written licensee event reports (LERs) within 60 days.

  • ALARA program documentation includes dose goals, trending, and corrective actions; occupational dose records are maintained and reported to the NRC (or national regulator).

  • Emergency plan requirements (10 CFR 50.47 and Appendix E) include plume exposure pathway EPZ of about 10 miles and ingestion pathway EPZ of about 50 miles for planning purposes.