NV Landscape Contractor flashcards
NV Landscape Contractor · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Nevada contractor license requirement
- Under NRS 624, a person must hold a State Contractors Board license before bidding, contracting, or performing construction work for compensation on real property in Nevada.
- License classification and limit
- A Nevada license authorizes only the classification shown (for example a C specialty) and only up to the monetary limit assigned by the Board based on financial strength and experience.
- Qualifying party
- The individual who passes the trade and law exams and is named on the license. The qualifier must be actively involved, and the licensee must replace a departing qualifier within the regulatory period.
- License number in advertising
- Nevada requires the license number to appear in advertising and on contracts and bid documents, allowing the public and Board to verify license status and classification.
- Residential recovery fund
- A statutory fund that can reimburse homeowners for losses caused by a licensed contractor, but only after the claimant obtains a judgment or award and exhausts collection efforts, subject to caps.
- Grounds for Board discipline
- Abandonment, failure to complete work, diversion of funds, substandard workmanship, exceeding the monetary limit, and failure to pay subs or suppliers can lead to fines, suspension, or revocation.
- Surety bond and workers' comp
- Licensees must maintain a contractor's surety bond and workers' compensation coverage for employees (or an approved exemption). Lapse of either can trigger automatic license suspension.
- Surface drainage slope
- Grade soil to fall about 2 percent, roughly one quarter inch per foot, away from buildings for the first several feet, and route swales to a legal discharge point.
- Matched precipitation rate
- Heads on one valve should apply water at similar rates so the zone wets evenly. Mixing high- and low-output heads causes overwatering, runoff, and dry spots.
- Hydrozoning
- Grouping plants with similar water, sun, and soil needs on separate irrigation valves so each zone's schedule matches plant demand and soil infiltration rate.
- Cycle and soak
- Running a zone in several short cycles with pauses lets water infiltrate clay soils instead of running off, improving depth of wetting and reducing waste.
- Root flare placement
- Set the root flare at or slightly above finished grade and plant in a hole two to three times the root-ball width, backfilling with native soil unless a soil test calls for amendment.
- Concrete slab thickness
- Pedestrian flatwork typically uses a minimum four-inch slab; vehicle-loaded areas need five to six inches, compacted base, control joints, and proper curing.
- Retaining wall drainage
- Walls need drainage gravel, filter fabric, and weep holes to relieve hydrostatic pressure; walls above the local height threshold generally require engineered design and permits.
- Cubic yard formula
- Cubic yards equal length times width times depth in feet, divided by 27. Add a waste factor to the takeoff before ordering material.
- Caliche in Nevada soils
- A cemented calcium carbonate layer common in desert soils that resists water and roots. Rip, pierce, or over-excavate planting areas and provide drainage through it.
- Mulch depth rule
- Maintain two to four inches of mulch to reduce evaporation and suppress weeds, keeping mulch pulled back from trunks and stems to prevent rot and pest damage.
- Written change order
- A signed document describing added or deleted scope, price, and schedule impact. Work should not proceed on verbal changes, because unsigned changes complicate payment and lien claims.
- Preliminary lien notice
- On private Nevada work, a notice of right to lien is generally required within 31 days after first furnishing labor or materials to preserve mechanics' lien rights.
- Gross margin formula
- Gross margin equals revenue minus direct job costs, divided by revenue. Bid markup must exceed gross margin enough to cover overhead and net profit.
- Working capital
- Current assets minus current liabilities. The Board reviews working capital and net worth when setting the licensee's monetary limit.
- Cash flow gap
- The shortfall when payroll and material costs occur before progress payments arrive. Size a credit line to the largest expected gap between cash out and cash in.
- Additional insured endorsement
- A policy endorsement extending liability coverage to a project owner or general contractor. Verify subcontractor certificates and endorsements before allowing subs on site.
- Diversion of funds
- Using money paid on one project for unrelated expenses, leaving that job unpaid or incomplete. It is a disciplinary violation before the Nevada State Contractors Board.
- OSHA focus four hazards
- Falls, struck-by, caught-in or between, and electrical hazards account for most construction fatalities and are the core of jobsite hazard assessment.
- Trench protective systems
- Trenches five feet or deeper need sloping, shoring, or shielding unless in stable rock. A competent person inspects daily, and spoil piles stay two feet back.
- Call 811 before digging
- Nevada requires notifying the utility locating service before excavation, waiting the required period, and hand-digging near marked lines to prevent strikes.
- Skid steer safety
- Keep the ROPS and seat belt in use, sound the backup alarm or use a spotter, lower attachments before dismounting, and never carry riders in buckets or on attachments.
- Heat illness response
- Provide water, rest, shade, and acclimatization. Confusion, cramps, or stopped sweating signal heat illness; cool the worker and call for emergency help.
- GFCI on outdoor tools
- Portable electric tools used outdoors must be protected by ground-fault circuit interruption to reduce shock risk in wet conditions common to landscape work.
- Pesticide label compliance
- Applicators must follow label PPE, application rates, posting, and re-entry intervals, and keep safety data sheets available on the jobsite.