NV Landscape Contractor study plan
NV Landscape Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Nevada contractor licensing law and Board regulations (NRS 624) & Business management, contracts, and financial responsibility
Map the structure of NRS 624 and the Nevada State Contractors Board regulations into a one-page outline covering licensing classifications, qualification requirements, and disciplinary grounds
Define the C-10 landscaping classification scope and distinguish it from adjacent classifications (C-3, C-5, C-14, C-21) using statutory language
List the initial license application steps, fees, and required documents in sequence, noting which items expire or need renewal
Draft a personal glossary of 20 Nevada-specific licensing terms with plain-language definitions
Your checkpoint
One-page NRS 624 outline plus a 20-term glossary, self-quizzed to 80% recall
Nevada contractor licensing law and Board regulations (NRS 624) & Business management, contracts, and financial responsibility
Summarize the rules on unlicensed contracting, bid limits, and advertising restrictions, citing the section numbers you would look up on the exam
Explain the qualifying individual's responsibilities and the consequences of disassociation from a licensed entity
Trace the disciplinary process from complaint to citation, hearing, and penalty, and identify appeal paths
Compare bonding and insurance requirements for active versus inactive license status
Your checkpoint
Two-page written summary of license maintenance and discipline rules with section citations
Business management, contracts, and financial responsibility
Build a contract checklist covering scope, payment schedule, change orders, retainage, and dispute resolution clauses
Compute a sample job estimate including labor burden, materials markup, equipment, overhead, and profit, then verify the total against a second method
Interpret the key line items of a contractor's financial statement (current ratio, working capital, net worth) and explain why the Board reviews them
Explain lien notice and preliminary notice timelines and how they affect payment collection
Your checkpoint
Completed sample estimate and contract checklist, with a worked financial-ratio calculation page
Landscape contracting trade knowledge and construction practices
Classify common desert-adapted plant materials by water use, sun exposure, and mature size, and select appropriate species for a given site description
Explain soil preparation, amendment, and grading practices for southern Nevada caliche and alkaline soils
Describe irrigation design fundamentals: hydrozones, head spacing, precipitation rate, controller scheduling, and drip versus spray selection
Sequence a hardscape installation (base prep, compaction, edging, pavers, drainage slope) and state the inspection points
Your checkpoint
One full design-and-install package for a hypothetical 1,500 sq ft residential yard, including plant list, irrigation layout notes, and installation sequence
Landscape contracting trade knowledge and construction practices & Safety and jobsite practices
Identify the correct construction details for retaining walls, steps, and drainage swales, and explain failure modes when they are built wrong
Explain how to read and apply a landscape plan set, including scale, symbols, legend, and specifications
List the required elements of a Nevada SWPPP-type erosion and sediment control plan for a disturbed site and describe best management practices
Match common landscape defects (settling, poor drainage, plant dieback) to root causes and corrective actions
Your checkpoint
Annotated plan-reading exercise and a defect-diagnosis table of at least 10 entries
Safety and jobsite practices
Summarize OSHA general industry and construction standards most relevant to landscaping: hazard communication, PPE, ladders, and machine guarding
Explain excavation and trenching protective-system requirements, including competent-person duties and soil classification basics
Describe safe operation and transport procedures for common equipment: trenchers, skid steers, stump grinders, and chippers
Outline heat-illness prevention and hydration planning appropriate for Nevada summer work, including acclimatization and monitoring
Your checkpoint
Site-specific safety plan for a 5-person crew covering hazard analysis, PPE, equipment, heat, and emergency response
Safety and jobsite practices & Nevada contractor licensing law and Board regulations (NRS 624)
Explain the requirements for calling 811 before digging and the contractor's responsibilities around utility locating and tolerance zones
Describe pesticide and herbicide handling rules, applicator certification basics, storage, and recordkeeping
Review jobsite traffic control, public protection, and barricade practices for work near streets and sidewalks
Revisit licensing rules on supervision, employee classification, and subcontracting as they intersect with safety accountability
Your checkpoint
Written utility-locate and chemical-handling procedure with a pre-task safety briefing script
Nevada contractor licensing law and Board regulations (NRS 624) & Landscape contracting trade knowledge and construction practices & Business management, contracts, and financial responsibility & Safety and jobsite practices
Complete a timed 100-question mixed practice set and log misses by domain
Re-study the two weakest domains using your own notes and glossary rather than new material
Rehearse calculation types (estimate math, ratios, irrigation precipitation rate) until each is solved correctly twice in a row
Write a one-page exam-day strategy covering pacing, flagging, and handling scenario questions
Your checkpoint
Practice exam score of 80% or higher with a written remediation log for every missed item
Milestones
Week 2: Score at least 80% on a self-made 25-question quiz drawn only from NRS 624 and Board regulation notes, with all missed items rewritten as corrected statements
Week 4: Produce the complete sample estimate and contract checklist with no missing line items, and correctly compute working capital and current ratio from a sample balance sheet
Week 6: Deliver the crew safety plan and pass an oral walkthrough of it, explaining the hazard reasoning behind each control without referring to notes
Week 8: Achieve 80% or higher on the timed mixed practice set, with no domain scoring below 70%, and show the remediation log completed