Quick reference

Electrical Fundamentals

  • Ohm's law: V = I × R; power P = V × I = I²R = V²/R. In DC circuits these three forms are interchangeable, so choose the one whose two quantities you already know.

  • Series circuit: R_total = R1 + R2 + ...; current is common to all elements; voltages add. Parallel circuit: 1/R_total = 1/R1 + 1/R2 + ...; voltage is common; branch currents add.

  • Kirchhoff's laws: current law - sum of currents into a node equals sum out; voltage law - algebraic sum of EMFs and drops around any closed loop is zero.

  • Capacitance in farads: C = Q/V; energy stored = ½CV². Capacitors block DC and pass AC; capacitive reactance X_C = 1/(2πfC), falling as frequency rises.

  • Inductance: energy stored = ½LI²; inductive reactance X_L = 2πfL, rising with frequency. Inductors oppose change in current, so current lags voltage in an inductive circuit.

  • Impedance Z = √(R² + (X_L − X_C)²); phase angle θ = arctan((X_L − X_C)/R). At resonance X_L = X_C, Z = R and the circuit is purely resistive.

  • AC values: RMS = peak/√2 ≈ 0.707 × peak; average of a full sine is zero; form factor = RMS/average = 1.11 for a sine wave.

  • Transformer relationship: V1/V2 = N1/N2 = I2/I1. Power in equals power out for an ideal transformer; a step-down in voltage is a step-up in current.

  • Three-phase: line voltage = √3 × phase voltage in star (wye) connection; line current = phase current. In delta, line current = √3 × phase current and line voltage = phase voltage.

Quick reference

Electrical Systems and Components

  • A relay is an electromagnetically operated switch: coil current creates flux that pulls an armature, closing or opening contacts. A contactor is the same principle scaled for heavy current loads.

  • A solenoid converts coil current into linear mechanical force on a plunger; it is a single-acting actuator, not a switching device with separate load contacts.

  • DC motor rotation reverses if either the field polarity or the armature polarity is reversed, but not both. Series-wound motors must never be run unloaded - overspeed results.

  • A generator's output frequency depends on poles and speed: f = (poles × rpm)/120. Voltage depends on field strength and speed, controlled by the voltage regulator.

  • A starter-generator is a single machine that cranks the engine as a motor, then generates once the engine runs; the changeover is made by external contactor logic, not by the machine itself.

  • Diodes conduct from anode to cathode above forward threshold; a freewheel/suppression diode across a coil clamps the inductive spike when coil current is interrupted.

  • Thermal circuit breakers trip on current-squared heating and are ambient-temperature sensitive; magnetic types respond to instantaneous overcurrent and are less affected by temperature.

  • A voltage regulator senses generator output and modulates field current; overvoltage protection protects the bus, undervoltage protection protects loads from abnormal supply.

Quick reference

Aircraft Electrical Power Generation and Distribution

  • Typical AC aircraft system: 115 V AC, 400 Hz, three-phase. Higher frequency reduces transformer and motor iron weight; 400 Hz is the long-standing transport standard.

  • Typical DC system: 28 V DC, provided by transformer-rectifier units on AC aircraft or by engine-driven DC generators on smaller types. 14 V systems exist on light aircraft.

  • Bus architecture is hierarchical: main/generator buses feed essential buses, which feed battery/battery-direct buses. Essential and emergency buses remain powered after loss of normal generation.

  • External power receptacles include a polarity/voltage sensing circuit that prevents closure of the external power contactor if polarity is wrong or voltage is out of limits.

  • A generator drive (constant-speed drive or integrated drive generator) holds frequency constant as engine speed varies; a drive disconnect is provided for a failed drive.

  • Split-bus and bus-tie contactors allow one generator to feed both main buses; the tie closes automatically on loss of one generator only if the remaining source has capacity.

  • Battery state: a lead-acid or NiCad battery supplies emergency power, absorbs bus transients, and provides APU starting. NiCad batteries require electrolyte level checks and can suffer thermal runaway.

  • Ground power must be connected and verified before switching the external power switch; the aircraft battery is normally disconnected from the external power path to prevent paralleling of dissimilar sources.

Quick reference

Aircraft Wiring, Bonding and Testing

  • Wire selection is by current rating, voltage drop and temperature rise; derating accounts for bundle size and ambient temperature. Voltage drop is calculated as V_drop = 2 × L × I × R_per_unit_length for a two-wire run.

  • Aluminium wire requires special terminals and anti-corrosion treatment; copper is standard. Never splice aluminium to copper without an approved connector - galvanic corrosion results.

  • Bonding resistance limits: a primary bond (structural return path) is typically required to be below 0.0025 ohm (2.5 milliohms); secondary bonds for equipment grounding are held to a lower-current but still low-resistance limit.

  • Insulation resistance testing uses a megohmmeter at a specified test voltage; the reading must be taken after the circuit is isolated and discharged, and compared to the maintenance manual minimum.

  • Continuity testing proves a low-resistance path; bonding testing proves the resistance between two structural points is within limits. Both require a calibrated meter and a clean contact point.

  • Shielded wire terminates the shield at one end to avoid ground loops; the shield is grounded to the connector backshell or a dedicated ground point per the wiring diagram.

  • Wire identification uses a marking code giving circuit function, wire number and segment; the same code appears on the wiring diagram and the physical wire.

  • Arcing and loose terminals are found by torque checks, pull tests and thermal inspection; a loose terminal shows heat discolouration, not necessarily a continuity failure on a low-current meter.

Quick reference

Aviation Regulations

  • CAA NZ rules: Part 43 covers maintenance; Part 66 covers licensing of aircraft maintenance engineers; Part 145 covers maintenance organisations. Know which Part governs which activity.

  • A maintenance release certifies that the maintenance has been carried out and the aircraft is airworthy; it is issued by a person holding the appropriate licence and rating.

  • Aircraft maintenance engineer licences carry category and type ratings; work outside the holder's rating requires certification by someone appropriately rated.

  • Continuing airworthiness is the operator's responsibility, supported by the maintenance programme approved under the applicable rule; the programme defines scheduled tasks and intervals.

  • Defect recording and rectification: defects are entered in the technical log or maintenance record, and deferral is only permitted where the approved documents allow it with defined limitations.

  • Form 1 / authorised release certificate accompanies parts and certifies airworthiness status; a part without acceptable release documentation is not eligible for installation.

  • Occurrence reporting: certain defects and incidents must be reported to the CAA; the requirement is defined by rule, and the report is separate from the maintenance record entry.

Quick reference

Maintenance Documentation and Human Factors

  • Approved data hierarchy: the maintenance manual and its revisions, service bulletins, airworthiness directives, and approved design data. Work is performed to the current revision - check the revision status before starting.

  • Airworthiness directives are mandatory; service bulletins are usually recommended unless made mandatory by an AD or the operator's programme.

  • A task card or work pack translates manual instructions into a recordable step sequence; sign-off occurs at each step, not retrospectively at the end of the task.

  • Human factors: the 'dirty dozen' includes complacency, fatigue, pressure, distraction, lack of communication, lack of resources, lack of teamwork, lack of knowledge, norms, stress, assertiveness and awareness.

  • Error defences: independent inspection, dual sign-off on critical tasks, tool control and shadow boards, and a clean handover at shift change.

  • Shift handover must be verbal and written: what is complete, what is in work, what is unserviceable, and what tooling or parts are staged.

  • Aircraft documentation must be completed in permanent ink, legible, dated and signed; corrections are made by a single line through the error with initials, never by overwriting or erasing.

  • Fatigue degrades attention and error detection; regulated duty limits exist because fatigue is a recognised maintenance error precursor, not a personal failing.

Quick reference

Electrical Fundamentals - Measurement and Safety

  • A voltmeter is connected in parallel with the component; an ammeter is connected in series. Connecting an ammeter across a supply will short the circuit and blow its fuse.

  • A clamp meter measures current by sensing the magnetic field around a conductor; it measures one conductor at a time, so a two-wire cable read gives the difference, not the load current.

  • Insulation testers apply a high DC voltage; always isolate, discharge capacitors, and disconnect sensitive electronics before testing to avoid damage.

  • Lockout/tagout: isolate the source, prove dead with a meter, and tag the isolation point before working on a circuit that could be energised remotely.

  • Static discharge damages electronic components; use a grounded wrist strap and conductive packaging when handling line-replaceable units containing circuit cards.

  • A meter's burden voltage and internal resistance affect readings; a low-impedance meter loads the circuit, so use a high-impedance meter for electronic measurements.

  • Thermal imaging locates high-resistance joints and overloaded conductors by temperature rise; it is a condition-monitoring tool, not a substitute for a resistance measurement.

Quick reference

Aircraft Electrical Power - Fault Diagnosis

  • No output from a generator: check drive condition, field supply, voltage regulator and output contactor in that order before condemning the generator.

  • Overvoltage trip on the bus: suspect the voltage regulator or a lost sensing lead; do not reset repeatedly without finding the cause.

  • A bus that will not power from either generator or external power points to a contactor or wiring fault, not to both sources failing simultaneously.

  • Intermittent faults: check connector pin tension, chafing points and bonding straps; vibration-related faults often clear when the aircraft is on the ground.

  • Load analysis: total connected load must not exceed generator capacity; adding avionics without a load analysis can cause nuisance trips.

  • Battery that will not hold charge: check electrolyte, specific gravity, charging voltage and parasitic drain before replacing the battery.

  • A tripped circuit breaker should not be reset more than once without investigation; a repeated trip indicates a genuine fault, not a nuisance.

Quick reference

Aircraft Wiring - Installation Practice

  • Minimum bend radius and support spacing are specified in the maintenance manual; exceeding them stresses conductors and insulation.

  • Wires are routed with adequate clearance from hot surfaces, fuel lines and moving parts; use standoffs and grommets at penetrations.

  • Connector assembly: correct insertion/removal tool, correct contact position, and a pull test on each contact before closing the shell.

  • Terminal lugs are crimped with the specified tool and die; a solder joint is not a substitute for a crimp unless the manual permits it.

  • Wire splices are permitted only where the approved data allows, using approved splice types, with the correct insulation system.

  • Cable ties are not over-tightened; over-tensioning crushes insulation and can cause chafing failures later.

  • Marking and identification must remain legible after installation; heat-shrink labels are preferred where the environment degrades ink.

Quick reference

Regulations - Certification and Records

  • Maintenance records must be retained for the period specified by rule; the operator holds the record set and must produce it on request.

  • A certificate of airworthiness remains valid only while the aircraft is maintained per the approved programme and all ADs are complied with.

  • Major modifications require approved design data and a supplementary type certificate or equivalent approval before installation.

  • The maintenance control manual describes how the operator controls maintenance; it is approved and must reflect actual practice.

  • Licence privileges are defined by category; a person may only certify work they are rated and current for.

  • Release to service after maintenance requires the specified certification, and any deferred defect must be recorded with its limitations.

Quick reference

Human Factors - Error Management

  • Error types: slip (right intention, wrong execution), lapse (forgotten step), mistake (wrong intention), violation (deliberate deviation). Each needs a different defence.

  • Situational awareness degrades under high workload; verbalising the next step and using checklists restores it.

  • Communication: use standard phraseology and read-back for critical instructions; ambiguous handovers are a known error source.

  • Complacency is highest on repetitive, familiar tasks; independent inspection is the designed defence against it.

  • Stress narrows attention; time pressure increases shortcut-taking. Both are managed by planning and by stopping when the plan fails.

  • Just culture distinguishes error from recklessness; reporting is encouraged so that systemic defences can be improved.

Quick reference

Electrical Systems - Component Testing

  • Relay test: verify coil resistance, then operate the coil and confirm contact continuity and insulation between open contacts.

  • Diode test: forward drop about 0.6–0.7 V for silicon; a shorted or open diode reads near zero or infinite in both directions.

  • Motor test: check winding resistance balance between phases and insulation to case; an unbalanced reading indicates a shorted turn.

  • Transformer test: continuity of each winding, insulation between windings, and turns ratio by voltage ratio.

  • Bonding test: use a four-wire or calibrated low-resistance meter; a two-wire meter includes lead resistance and can mask a marginal bond.

  • Insulation resistance: record the value and test voltage; a falling trend across checks is more significant than a single pass.

Quick reference

Power Distribution - Protection Devices

  • Fuses protect against overcurrent and are sized to the wire's current rating, not to the load's nominal current.

  • Circuit breakers are resettable and are chosen so the wire is protected; the breaker rating must not exceed the wire's capability.

  • Thermal breakers are ambient-sensitive; in a hot bay they trip at lower current, so location matters.

  • Current limiters and fuses in parallel feeds must be replaced as a set where the manual requires matching characteristics.

  • Reverse-current protection prevents a failed generator from motoring from the bus; a reverse-current relay or diode performs this function.

  • Differential protection compares current in and out of a feeder; a difference indicates a fault to ground within the protected zone.