CAA NZ ATPL Theory - Flight Planning study materials
CAA NZ ATPL Theory - Flight Planning study resources

CAA NZ ATPL Theory - Flight Planning key terms

CAA NZ ATPL Theory - Flight Planning · Get comfortable with the vocabulary.

Maximum Take-off Mass (MTOM)

The highest mass at which the aircraft is certified for the start of the take-off run, fixed by the manufacturer and stated in the flight manual. It limits structural and performance loads regardless of actual conditions.

Related: Regulated Take-off Mass, Maximum Landing Mass
Maximum Landing Mass (MLM)

The greatest mass at which the aircraft may touch down, set by structural certification limits. A flight must plan to burn or jettison fuel so that landing mass does not exceed this value.

Related: Maximum Take-off Mass (MTOM), Regulated Landing Mass
Maximum Zero-Fuel Mass (MZFM)

The maximum mass permitted with usable fuel excluded, protecting the wing root structure from bending loads. It caps payload plus unusable fuel and operating items before fuel is added.

Related: Dry Operating Mass, Traffic Load
Dry Operating Mass (DOM)

The aircraft mass including crew, crew baggage, catering, potable water and other operational items, but excluding traffic load and usable fuel. It is the baseline from which all load calculations begin.

Related: Operating Mass, Traffic Load
Operating Mass

Dry operating mass plus take-off fuel. It represents the mass of the aircraft at departure with fuel but without revenue payload, and is used as an intermediate step in load sheets.

Related: Dry Operating Mass (DOM), Take-off Fuel
Traffic Load

The total mass of passengers, baggage and cargo carried, including any non-revenue load. It is added to dry operating mass to give zero-fuel mass for the flight.

Related: Dry Operating Mass (DOM), Maximum Zero-Fuel Mass (MZFM)
Regulated Take-off Mass (RTOM)

The take-off mass actually used for performance calculation, being the lowest of the field-length-limited, climb-limited, obstacle-limited and structural limits. It may be below MTOM when conditions are restrictive.

Related: Field Length Limited Mass, Maximum Take-off Mass (MTOM)
Field Length Limited Mass

The highest take-off mass at which the accelerate-stop and take-off distances fit the available runway, clearway and stopway for the reported conditions. It varies with runway surface, slope, wind and temperature.

Related: Regulated Take-off Mass, Balanced Field Length
Balanced Field Length

The runway length at which the accelerate-stop distance equals the take-off distance to 35 feet with one engine inoperative. It identifies the V1 that gives the shortest field requirement.

Related: V1 (Decision Speed), Field Length Limited Mass
V1 (Decision Speed)

The speed at which a rejected take-off may still be stopped within the accelerate-stop distance, or a continued take-off achieved within the take-off distance. It is selected before take-off and drives brake energy and obstacle clearance.

Related: Balanced Field Length, Accelerate-Stop Distance
Accelerate-Stop Distance

The distance from brake release to a full stop after failure of the critical engine at V1, plus a short crew reaction allowance. It is compared with the available accelerate-stop distance during dispatch.

Related: V1 (Decision Speed), Clearway
Clearway

A defined area beyond the runway end, free of obstacles and under control of the aerodrome authority, that may be included in take-off distance calculations. It must be at least 75 metres wide and have limited slope.

Related: Stopway, Take-off Distance Available (TODA)
Stopway

A prepared rectangular area beyond the runway end, able to support the aircraft without structural damage, usable for deceleration after a rejected take-off. Its length is added to the runway to give accelerate-stop distance available.

Related: Clearway, Accelerate-Stop Distance Available (ASDA)
Take-off Distance Available (TODA)

The runway length plus any clearway, declared by the aerodrome operator, within which the aircraft must reach 35 feet with the critical engine failed. It appears on the aerodrome chart and in performance software.

Related: Clearway, Take-off Run Available (TORA)
Accelerate-Stop Distance Available (ASDA)

The runway length plus any stopway, declared for use in a rejected take-off. It is the limiting declared distance when stopways are provided and must be compared with the calculated accelerate-stop distance.

Related: Stopway, Accelerate-Stop Distance
Landing Distance Available (LDA)

The length of runway declared available and suitable for the ground run of a landing aeroplane, measured from the threshold. Displaced thresholds reduce LDA even though the paved surface may extend further.

Related: Displaced Threshold, Regulated Landing Mass
Regulated Landing Mass

The landing mass used for dispatch, being the lowest of the structural MLM and the mass permitted by landing distance and missed-approach climb requirements at the destination or alternate. It may force fuel or payload reduction.

Related: Maximum Landing Mass (MLM), Approach Climb Requirement
Approach Climb Requirement

The one-engine-inoperative climb gradient that must be achievable in the landing configuration at the destination. If the aeroplane cannot meet it at the planned mass, landing mass must be reduced before dispatch.

Related: Regulated Landing Mass, Go-around Climb Gradient
Displaced Threshold

A threshold located at a point on the runway other than the physical beginning, usually to provide obstacle clearance on approach. The paved area before it is not usable for landing but may be used for take-off.

Related: Landing Distance Available (LDA), Obstacle Clearance
Contaminated Runway

A runway covered by standing water, slush, loose snow or wet ice beyond defined depths, reducing friction and braking action. Performance data for contaminated surfaces must be used, often with large mass penalties.

Related: Field Length Limited Mass, Accelerate-Stop Distance
Fuel Policy Fuel

The minimum fuel required by the operator's approved fuel policy for a flight, comprising taxi, trip, contingency, alternate, final reserve and additional fuel. It must be on board before departure and is documented on the operational flight plan.

Related: Final Reserve Fuel, Contingency Fuel
Trip Fuel

The fuel needed from take-off to touchdown at the destination, including climb, cruise, descent and approach for the planned route and forecast conditions. It is recalculated whenever the route or winds change significantly.

Related: Contingency Fuel, Alternate Fuel
Contingency Fuel

Fuel carried to cover unforeseen factors such as deviations from forecast winds, routing or cruise level. It is normally a percentage of trip fuel or a time-based amount, and may be reduced under approved procedures.

Related: Trip Fuel, Final Reserve Fuel
Final Reserve Fuel

Fuel that must remain on board on arrival at the destination alternate, intended for holding. For turbine aeroplanes it is typically 30 minutes at holding speed at 1,500 feet above the alternate.

Related: Alternate Fuel, Isolated Aerodrome Fuel
Alternate Fuel

Fuel required to fly from the destination to the destination alternate, including approach and landing, based on forecast conditions. It is not required when no alternate is needed under the applicable rules.

Related: Final Reserve Fuel, Destination Alternate
Isolated Aerodrome Fuel

Additional fuel required when the destination has no usable alternate, allowing the aircraft to hold and then fly to a suitable diversion aerodrome. It is added to the normal policy fuel for such destinations.

Related: Final Reserve Fuel, Destination Alternate
In-flight Replanning (Decision Point Procedure)

A method where the flight carries enough fuel to reach a decision point, then either continues to the destination or diverts, with the fuel plan updated in flight. It allows reduced contingency fuel when approved and monitored.

Related: Contingency Fuel, Point of No Return
Point of No Return (PNR)

The position along the route from which it is no longer possible to return to the departure aerodrome with the fuel remaining. It depends on wind, fuel flow and reserve requirements and is calculated before flight.

Related: Equal Time Point (ETP), In-flight Replanning (Decision Point Procedure)
Equal Time Point (ETP)

The point on a route where the time to fly to either of two diversion aerodromes is equal, given the winds in each direction. It is used to plan diversion fuel for remote or oceanic sectors.

Related: Point of No Return (PNR), Destination Alternate
Specific Range

The distance flown per unit of fuel, usually nautical air miles per kilogram or per pound. It is highest at the optimum cruise altitude and speed and is used to compare cruise techniques and monitor fuel efficiency.

Related: Long Range Cruise (LRC), Cost Index
Long Range Cruise (LRC)

A cruise speed slightly above maximum range speed, giving about 99 percent of best specific range while reducing flight time. It is used when fuel economy matters but a very slow cruise is unacceptable.

Related: Specific Range, Maximum Range Cruise
Cost Index

A number entered into the flight management computer that trades fuel cost against time cost to select cruise speed. A low value favours economy, a high value favours speed and schedule.

Related: Specific Range, ECON Cruise Speed
Step Climb

A planned increase in cruise level as fuel is burned and the aircraft becomes lighter, allowing a higher optimum altitude. It improves specific range on long sectors and must be coordinated with air traffic control.

Related: Optimum Altitude, Specific Range
Optimum Altitude

The cruise level at which the aircraft achieves its best specific range for the current mass and temperature. It rises as mass decreases and usually falls in warmer than standard conditions.

Related: Step Climb, Specific Range
Destination Alternate

An aerodrome to which a flight may proceed if landing at the destination is not possible, and for which fuel is carried. It must meet weather and runway requirements at the estimated time of use.

Related: Alternate Fuel, Final Reserve Fuel
Operational Flight Plan (OFP)

The document prepared by the operator for a specific flight, showing route, masses, fuel figures, times and alternates. It is signed by the commander and forms the basis for fuel and performance decisions.

Related: ATS Flight Plan, Fuel Policy Fuel
ATS Flight Plan

The message filed with air traffic services giving aircraft identification, route, level, speed and estimated times so that control and search and rescue can be provided. It must be filed before departure and updated when the plan changes.

Related: Operational Flight Plan (OFP), ICAO Flight Plan Form
Significant Point

A specified geographical location used to define a route or part of a flight, such as a waypoint, navaid or intersection. It must be identifiable and, where required, named in the ATS flight plan route field.

Related: ATS Route Designator, Great Circle Track
ATS Route Designator

The coded identifier for a published air traffic services route, such as A, B, G, R or L series, showing its type and direction. It is entered in the route field of the flight plan to describe the intended path.

Related: Significant Point, ATS Flight Plan
Great Circle Track

The initial direction of the shortest path between two points on the Earth's surface, measured at the departure point. On long sectors the track changes continuously and must be recalculated along the route.

Related: Rhumb Line Track, Equal Time Point (ETP)
Rhumb Line Track

A track that crosses all meridians at the same angle, appearing as a straight line on a Mercator chart. It is constant but not the shortest path, and is used for short sectors and chart plotting.

Related: Great Circle Track, Mercator Projection
ISA Deviation

The difference between the actual temperature at a level and the International Standard Atmosphere value for that level. Positive deviations increase density altitude and reduce performance, so they must be applied in take-off and cruise calculations.

Related: Density Altitude, Optimum Altitude
Density Altitude

Pressure altitude corrected for temperature, representing the altitude the aircraft performance feels. High density altitude lengthens take-off and reduces climb, and is used to enter performance charts.

Related: ISA Deviation, Field Length Limited Mass
Wind Component

The headwind or tailwind resolved along the intended track, used to adjust groundspeed, fuel burn and time. It is derived from forecast winds aloft and must be updated with actual winds in flight.

Related: Trip Fuel, Equal Time Point (ETP)
Significant Weather Chart (SIGWX)

A forecast chart showing fronts, jet streams, turbulence, icing and cumulonimbus areas relevant to a flight level band. It is used in route planning to avoid hazardous weather and estimate fuel effects.

Related: Wind Component, Tropopause
Tropopause

The boundary between the troposphere and stratosphere where temperature stops falling with height. Its height affects jet stream location, turbulence and the cruise levels chosen for long sectors.

Related: Significant Weather Chart (SIGWX), Optimum Altitude
Centre of Gravity (CG) Envelope

The certified forward and aft limits of centre of gravity for each mass, within which the aircraft must remain throughout the flight. Loading outside it can affect control, trim and performance.

Related: Load Sheet, Index Unit
Index Unit

A scaled number used to express the moment of an item about a reference point, allowing easy addition and conversion to centre of gravity. Load sheets use indices to keep the arithmetic simple.

Related: Centre of Gravity (CG) Envelope, Load Sheet
Load Sheet

The document showing the distribution of mass, the resulting centre of gravity and the final masses for the flight. It is checked and signed before departure and must agree with the operational flight plan.

Related: Centre of Gravity (CG) Envelope, Index Unit