Mistake 1

Treating the site safety plan as paperwork to sign on day one, then working from habit - for example, not checking for overhead powerlines or buried services before digging or erecting scaffold near a boundary.

Candidates memorise hazard controls as lists for the written paper but never rehearse applying them to a described site scenario, so under exam conditions they default to generic answers like 'be careful' instead of naming the specific control and the person responsible.

What to do instead

Practise a fixed routine for any scenario question: identify the hazard, state the harm and who is exposed, name the control using the hierarchy (eliminate, substitute, isolate, engineer, administrate, PPE), then state who must be notified and what record is kept. Apply it to five different scenarios (excavation, work at height, hazardous substances, noise, manual handling) until it is automatic.

Mistake 2

Answering health and safety questions with the control only, omitting the notification, documentation or legislative duty that the question also asks for.

Candidates read the stem quickly and latch onto the first thing they recognise, missing that the question asks for two or three elements - for example the control plus the notifiable event threshold plus the register entry.

What to do instead

Underline the command words and the number of parts in each stem before answering. Where a question says 'describe the process', write it as numbered steps including who does what, what is recorded, and what triggers notification to WorkSafe or the principal.

Mistake 3

Reading a set of plans in isolation - taking a dimension from the floor plan without cross-checking it against the elevations, sections and the schedule of finishes, then setting out to the wrong figure.

Candidates learn to read each drawing type separately but are not drilled on the discipline of reconciling them, and exams deliberately plant a discrepancy or a dimension that is only given on one sheet.

What to do instead

Before answering, identify which sheets exist in the set and what each governs. For any dimension question, state where the dimension is taken from and confirm it against at least one other sheet. Learn the standard order: site plan, foundation, floor plans, elevations, sections, details, schedules, specifications.

Mistake 4

Confusing setting-out terminology and reference systems - mixing up grid lines, datum, building line, boundary offsets, and the difference between a string line and a profile, or between 3-4-5 squaring and diagonal checking.

These terms are used loosely on site and candidates absorb the loose usage rather than the precise definition, so they cannot distinguish which method applies to a described situation.

What to do instead

Build a one-page glossary with a worked example for each term: how a datum is transferred, how a right angle is established and then verified by diagonals, how profiles are set and protected, and how consent conditions (boundary setbacks, height-to-boundary) translate into set-out lines. Redo the worked example from memory.

Mistake 5

Specifying fixings, connectors and timber grades by habit rather than by span, load path and exposure - for example using a common nail where a specific connector or fixing pattern is required, or naming a timber grade without reference to the span table.

Candidates memorise member names (stud, bearer, joist, lintel, trimmer) but not the relationship between span, spacing, load and fixing, so they cannot reason when a scenario changes one variable.

What to do instead

For framing questions, always state the load path from the loaded element down to the foundation, then name the member, its grade or section, its spacing or span basis, and the fixing or connector with the reason. Practise reading span tables so you can quote the basis of a selection rather than a remembered number.

Mistake 6

Describing openings, notches and penetrations without stating the rules that protect structural integrity - putting a plumbing run through a joist or a service hole through a top plate without noting the permitted zone, size limit or required reinforcement.

Candidates see notching and boring as a practical detail rather than a structural rule, so they answer 'drill a hole' without the conditions that make it acceptable.

What to do instead

Learn the standard rules for the members you are likely to be asked about (joists, studs, top plates, bearers, rafters): where notches and holes are permitted, maximum sizes, minimum edge distances, and when a trimmer, doubling or engineer's detail is required. Answer in the form: permitted zone, size limit, reinforcement if exceeded, who authorises deviations.

Mistake 7

Treating weathertightness as a single product choice - naming a cladding type or building wrap but omitting the layers and sequencing that make the assembly work: cavity, flashing, drainage path, air seal, and the order of installation.

Candidates revise cladding products and wrap brands rather than the four principles (deflection, drainage, drying, durability) and the sequence that delivers them, so answers list materials instead of an assembly.

What to do instead

Answer every weathertightness question as a layered assembly from outside in, naming each layer's function, then describe the water path and where it exits. Cover the critical junctions explicitly: base of wall, roof-to-wall, window and door heads and sills, deck-to-wall, penetrations, and the ends of the cavity. State the inspection points that must be signed off before the next layer covers them.

Mistake 8

Answering flashing and cladding-fixing questions with the material only, without the geometry - head flashings that do not lap correctly, no upstand, no saddle at the sill, fixings at the wrong spacing or too close to the edge.

Candidates learn that flashings are required but not the dimensional and lapping rules that make them effective, and exam stems often give a junction description rather than a picture.

What to do instead

For each junction, state the flashing type, the direction of the lap, the minimum upstand and lap dimensions you have been taught, the fixing spacing and edge distance, and the sealant or tape detail. Draw the junction in words from the outside in and check the water can only run outward and downward.

Mistake 9

Giving generic lining answers - 'fix the gib and stop the joints' - without naming sheet thickness and type for the location, fixing centres, the lining system's fire or wet-area rating, or the level of finish required.

Candidates see linings as low-risk fit-out work and do not study the performance requirements (fire resistance, bracing, wet areas, acoustic separation) that determine which lining system is correct.

What to do instead

For any lining question, state: substrate, sheet type and thickness, fixing type and centres, joint treatment and stopping level, and the performance reason (fire, bracing, wet area, acoustic). Learn which linings contribute to bracing and fire ratings and what happens to those ratings if the wrong sheet or fixing is used.

Mistake 10

Answering consent and compliance questions procedurally but incompletely - describing the inspection sequence without the building consent conditions, the producer statement or record of work, or the consequences of building without consent or covering work before inspection.

Candidates learn that inspections happen at stages but not the legal framework around them, so they miss the parts of the question about who is responsible, what documentation is required, and what the remedies are for non-compliance.

What to do instead

Build a timeline answer: consent application and conditions, pre-construction documentation, the scheduled inspection points (foundation, framing, pre-line, drainage, final), the records each produces (inspection record, producer statement, record of work, code compliance certificate), and the remedies for defective or uncovered work. Match each stage to the relevant Building Code clause.