Question 1Health, Safety and Environmental Requirements on Construction Sites
On a New Zealand construction site, which document must be prepared by the PCBU to record significant hazards and the controls in place before work begins?
- The building consent application
- The site-specific safety plan including a hazard register Correct answer.
- The producer statement for the framing
- The project payment schedule
Explanation
Under the Health and Safety at Work Act 2015 the PCBU must identify hazards and manage risks, and a site-specific safety plan with a hazard register documents those hazards and controls. Building consents, producer statements and payment schedules are contractual or regulatory building documents and do not record hazard controls.
Question 2Health, Safety and Environmental Requirements on Construction Sites
A worker is required to use a harness while working at height. Under the hierarchy of control, which measure should be considered first?
- Eliminating the need to work at height Correct answer.
- Training the worker in harness use
- Supervising the worker closely
- Issuing the correct harness
Explanation
The hierarchy of control ranks elimination of the hazard highest, so redesigning the task to avoid working at height comes before any PPE or administrative measure. Harnesses, training and supervision are lower-order controls used once higher-order options have been ruled out.
Question 3Health, Safety and Environmental Requirements on Construction Sites
Which item of personal protective equipment is the minimum standard for general work on a New Zealand construction site?
- Hearing protection and cut-resistant gloves
- Fall-arrest harness and lanyard
- Hi-visibility vest, hard hat and safety footwear Correct answer.
- Respirator and welding helmet
Explanation
General site PPE on NZ construction sites is a hi-visibility vest, a hard hat and safety boots, often with eye protection when tasks require it. Respirators, harnesses and hearing protection are task-specific PPE selected after a risk assessment of the particular work.
Question 4Health, Safety and Environmental Requirements on Construction Sites
When must an employer notify WorkSafe New Zealand of a notifiable incident on a construction site?
- Only when a building inspector requests it
- As soon as possible after becoming aware, and no later than 48 hours for notifiable injuries Correct answer.
- Within 7 days of the incident
- Only if the worker takes more than one day off work
Explanation
Under the Health and Safety at Work Act 2015, notifiable deaths and serious injuries must be notified to WorkSafe as soon as the PCBU becomes aware, and other notifiable injuries within 48 hours. The 7-day and building inspector triggers are not the notification rules.
Question 5Health, Safety and Environmental Requirements on Construction Sites
Which of the following best describes a 'notifiable injury' under the Health and Safety at Work Act 2015?
- Any injury that occurs after 5pm
- Any injury that the worker reports at the end of the shift
- An injury requiring immediate treatment as an in-patient in a hospital Correct answer.
- Any injury that requires a sticking plaster
Explanation
The Act defines notifiable injuries to include those requiring immediate treatment as an in-patient in a hospital, along with other specified serious injuries. Minor first-aid injuries and the time of day are not the criteria for notification.
Question 6Health, Safety and Environmental Requirements on Construction Sites
On a construction site, who has the primary duty to ensure the health and safety of workers and others affected by the work?
- The PCBU conducting the business or undertaking Correct answer.
- The worker's family
- The building consent authority
- The apprentice on the tools
Explanation
The Health and Safety at Work Act 2015 places the primary duty of care on the PCBU, the person conducting a business or undertaking. Workers have their own duties to take reasonable care, but the primary duty rests with the PCBU.
Question 7Health, Safety and Environmental Requirements on Construction Sites
A worker is about to cut treated timber with a circular saw. Which control measure best addresses the dust hazard at the source?
- Attaching a dust extraction system to the saw Correct answer.
- Working faster to reduce exposure time
- Posting a warning sign near the saw
- Wearing a dust mask
Explanation
Dust extraction captures wood dust at the point of generation, an engineering control that removes the hazard from the breathing zone. A mask, speed and signage are lower-order measures that do not stop the dust being released.
Question 8Health, Safety and Environmental Requirements on Construction Sites
A worker needs to access a roof edge to fix purlins. What is the most appropriate first step before starting?
- Ask a mate to hold the ladder steady
- Leave the harness in the truck to save time
- Complete a task-specific risk assessment and select controls such as edge protection or a harness system Correct answer.
- Climb up immediately while the weather is fine
Explanation
Fall hazards must be assessed before work starts, and controls such as edge protection, guardrails or a fall-arrest system selected according to the hierarchy. Rushing the task or relying on an untrained person to hold a ladder does not adequately control a fall risk.
Question 9Health, Safety and Environmental Requirements on Construction Sites
A worker discovers a damaged live electrical cable on site. What is the correct immediate action?
- Cover it with a sheet of plywood
- Keep clear, isolate the area and report it to the supervisor or site manager Correct answer.
- Cut the cable with insulated pliers
- Continue working nearby and report it at the end of the day
Explanation
A damaged live cable is an electrical hazard that must be isolated and reported immediately so a competent person can make it safe. Touching the cable, covering it or delaying the report risks electrocution to the worker and others.
Question 10Health, Safety and Environmental Requirements on Construction Sites
How should a worker respond to a minor spill of hydraulic oil on a concrete slab?
- Wash it into the stormwater drain with water
- Cover it with soil from the garden
- Leave it and let the rain disperse it
- Contain and clean it up using the site spill kit and dispose of the waste correctly Correct answer.
Explanation
Spills must be contained and cleaned using the site spill kit, and the contaminated material disposed of through the correct waste stream to prevent environmental harm. Washing oil to a stormwater drain or covering it does not prevent pollution.
Question 11Health, Safety and Environmental Requirements on Construction Sites
Which practice best controls the risk of a trench collapse when excavating for a foundation?
- Battering the sides or using shoring or a trench shield Correct answer.
- Allowing workers to enter only for short periods
- Placing spoil directly on the trench edge
- Relying on the soil drying out
Explanation
Trench collapse is controlled by battering the sides to a safe slope or installing shoring or a trench shield before workers enter. Spoil near the edge adds load and short entry times do not prevent a collapse.
Question 12Health, Safety and Environmental Requirements on Construction Sites
A worker is asked to operate a nail gun for the first time. What is the employer's responsibility before allowing use?
- Allow the worker to learn by trial and error
- Let the worker use it only when no one is watching
- Provide training and supervision so the worker is competent to use the tool safely Correct answer.
- Ask another apprentice to demonstrate once
Explanation
The PCBU must ensure workers are trained and supervised to be competent with plant and equipment before use. Trial and error, or instruction from an untrained peer, does not meet the duty to provide adequate training and supervision.
Question 13Health, Safety and Environmental Requirements on Construction Sites
Which document should a worker consult on site to understand the controls for a specific high-risk task before starting work?
- The supplier's delivery docket
- The task analysis or safe work method statement for that task Correct answer.
- The architect's fee proposal
- The project cash flow forecast
Explanation
A task analysis or safe work method statement sets out the steps, hazards and controls for a specific task and should be reviewed before starting. Financial and commercial documents do not describe hazard controls.
Question 14Health, Safety and Environmental Requirements on Construction Sites
A worker notices a colleague showing signs of heat stress on a hot summer day. What is the most appropriate response?
- Give the worker a hot drink and continue
- Ignore it because heat stress is not a real hazard
- Tell the worker to keep working until smoko
- Move the worker to a cool shaded area, give fluids and seek first aid advice Correct answer.
Explanation
Heat stress is a recognised hazard; the worker should be moved to shade, cooled, given fluids and assessed by a first aider. Continuing work, ignoring the signs or giving hot drinks can worsen the condition.
Question 15Health, Safety and Environmental Requirements on Construction Sites
What is the primary purpose of a site induction for a new worker?
- To allocate the worker a parking space
- To inform the worker of site-specific hazards, rules and emergency procedures Correct answer.
- To record the worker's tax code
- To assess the worker's carpentry skill level
Explanation
A site induction communicates site-specific hazards, site rules, emergency procedures and welfare arrangements so the worker can work safely. Skills assessment, payroll records and parking are unrelated to the induction's safety purpose.
Question 16Health, Safety and Environmental Requirements on Construction Sites
A worker is using a ladder to access a mezzanine. Which practice is acceptable under safe work principles?
- Using a ladder that is secured, set at the correct angle and used only for short-duration light work Correct answer.
- Carrying a sheet of plywood while climbing
- Using a ladder as a work platform for extended heavy tasks
- Standing on the top two rungs to reach higher
Explanation
Ladders are suitable for short-duration, light tasks when secured, set at the correct angle and in good condition. Extended work, top-rung standing and carrying large loads while climbing are unsafe practices.
Question 17Health, Safety and Environmental Requirements on Construction Sites
Which control measure is required before a worker enters a confined space such as a deep sump?
- A mobile phone torch only
- A confined space entry permit, atmospheric testing and a standby person Correct answer.
- A quick look inside to check for fumes
- A verbal promise to be careful
Explanation
Confined space entry requires a permit, atmospheric testing for oxygen and contaminants, isolation of hazards and a standby person outside. Informal checks, a torch or a promise do not meet the required controls.
Question 18Health, Safety and Environmental Requirements on Construction Sites
A subcontractor on site refuses to follow the site's noise controls. What is the principal contractor's most appropriate action?
- Stop the non-compliant work and require the subcontractor to comply before continuing Correct answer.
- Ignore the issue because the subcontractor is a separate business
- Report the matter only at project completion
- Ask other workers to wear extra earmuffs instead
Explanation
PCBUs must consult, coordinate and cooperate with other duty holders, and the principal contractor should stop non-compliant work and require compliance. Ignoring the issue, shifting the burden to other workers or delaying the report fails the duty to manage risks.
Question 19Health, Safety and Environmental Requirements on Construction Sites
A worker is asked to use a hazardous substance for formwork release. Which set of controls is required?
- Read the safety data sheet, use appropriate PPE and ensure adequate ventilation Correct answer.
- Store it in an unlabelled container
- Smell the product to identify it
- Use it in a closed unventilated space
Explanation
Hazardous substances must be managed using the safety data sheet, correct labelling and storage, appropriate PPE and adequate ventilation or extraction. Smelling, decanting into unlabelled containers and using in unventilated spaces all increase exposure risk.
Question 20Health, Safety and Environmental Requirements on Construction Sites
A near miss occurs when a load of timber falls from a forklift but no one is hurt. How should this be treated under good health and safety practice?
- Record and investigate it as a near miss and review the load-handling controls Correct answer.
- Blame the forklift operator and take no further action
- Wait for an actual injury before acting
- Dismiss it because no one was injured
Explanation
Near misses are leading indicators of risk and should be recorded, investigated and used to improve controls before a serious incident occurs. Dismissing the event or waiting for an injury ignores the opportunity to prevent harm.
Question 21Plans, Specifications and Setting Out
On a set of building plans, what does a scale of 1:50 mean?
- The drawing is 50 times larger than the finished building
- Fifty drawings are required to show the whole building
- The building must be set out in 50 mm increments
- One unit on the drawing represents 50 of the same units on the building Correct answer.
Explanation
A ratio scale compares drawing distance to real distance in the same units, so 1:50 means 1 mm on paper equals 50 mm on site. A 100 mm wall therefore draws as 2 mm. The scale never means the drawing is larger than the building.
Question 22Plans, Specifications and Setting Out
A dimension on a plan is written as 4200. In New Zealand architectural drawings, what unit is used for such dimensions unless noted otherwise?
- Centimetres
- Inches
- Millimetres Correct answer.
- Metres
Explanation
New Zealand architectural and engineering drawings conventionally dimension in millimetres and omit the unit symbol. A figure such as 4200 is therefore 4.2 m. Builders must convert carefully before setting out.
Question 23Plans, Specifications and Setting Out
What is the purpose of a datum line marked on a set of plans?
- To mark the position of underground services
- To show the legal boundary of the site
- To provide a fixed reference level from which heights are measured Correct answer.
- To indicate the direction of prevailing wind
Explanation
A datum is a fixed reference point or level, often related to a known benchmark, from which all vertical measurements are taken. Floor levels, ceiling heights and excavation depths are all referenced to it. Using a consistent datum prevents cumulative error.
Question 24Plans, Specifications and Setting Out
A plan shows a north point symbol in the top right corner. What information does this give the builder?
- The direction of true north relative to the drawn building Correct answer.
- The location of the nearest survey benchmark
- The maximum roof pitch allowed on site
- The position of the main entry door
Explanation
The north point establishes orientation, allowing the builder to relate the drawn layout to the actual site. This matters for solar access, weather exposure and correct rotation of the building on the ground. It does not give levels or dimensions.
Question 25Plans, Specifications and Setting Out
Which document in a project set would normally take precedence if a dimension on a drawing conflicts with a written specification?
- The specification, because written words override drawings Correct answer.
- The drawing, because it is a graphic record
- Whichever document was issued first
- Whichever the builder finds more convenient
Explanation
Standard conditions of contract generally give the specification and written instructions priority over drawings where a conflict exists. The builder should also raise a request for information to confirm. Never resolve a discrepancy by choosing the easier option.
Question 26Plans, Specifications and Setting Out
A floor plan shows a wall set out 1200 mm from the grid line, but the setting out is measured to the outside face of the foundation. What should the builder check before pegging?
- Whether the client prefers a different wall position
- Whether the neighbour's boundary is fenced
- Whether the dimension is to the frame face, cladding face or foundation edge Correct answer.
- Whether the roof pitch can be adjusted to suit
Explanation
Dimensions can be taken to different reference faces, so the builder must confirm which face the 1200 mm refers to. Setting out to the wrong face shifts the whole building by the wall thickness. This is normally clarified by the designer or shown on a setting out plan.
Question 27Plans, Specifications and Setting Out
What is the purpose of a string line and profile boards during setting out?
- To support scaffolding during construction
- To transfer the building outline and levels accurately to the ground Correct answer.
- To protect survey pegs from damage
- To measure the moisture content of timber
Explanation
Profiles set clear of the excavation carry string lines that mark wall lines and levels beyond the work area. They allow the builder to re-establish lines after digging and to check square and level. This is a standard technique for accurate setting out.
Question 28Plans, Specifications and Setting Out
Using the 3-4-5 method, a builder measures 3 m along one line and 4 m along a perpendicular line. What should the diagonal between those points measure for the corner to be square?
- 7 m
- 4.5 m
- 5 m Correct answer.
- 6 m
Explanation
The 3-4-5 triangle is a Pythagorean triple, since 3 squared plus 4 squared equals 25, and the square root is 5. If the diagonal reads exactly 5 m the included angle is 90 degrees. Any other reading means the corner must be adjusted.
Question 29Plans, Specifications and Setting Out
Which method is used to check that a rectangular building outline is square by comparing diagonals?
- Checking that all four sides are equal in length
- Measuring both diagonals and adjusting until they are equal Correct answer.
- Measuring the longest side twice
- Measuring the perimeter and dividing by four
Explanation
In a true rectangle the two diagonals are equal in length. If they differ, the corners are out of square and the outline must be adjusted until they match. This check works regardless of the rectangle's proportions.
Question 30Plans, Specifications and Setting Out
A section drawing shows a floor-to-floor height of 2700 mm and a joist depth of 240 mm. What does the section primarily allow the builder to confirm?
- The colour schedule for interior finishes
- The number of power outlets required
- The legal description of the property
- The vertical relationship between floor levels and structural members Correct answer.
Explanation
Sections cut through the building to show heights and the vertical relationship of floors, ceilings and structure. They let the builder check that members fit within the available depth. Finishes and services schedules come from other documents.
Question 31Plans, Specifications and Setting Out
An elevation drawing of a building shows the roof pitch as 25 degrees. Which dimension on site does this directly control?
- The thickness of the floor slab
- The rise of the roof over a given horizontal run Correct answer.
- The width of the foundation trench
- The spacing of the wall studs
Explanation
Roof pitch expresses the angle of the roof plane, which fixes the rise for each unit of horizontal run. The builder uses it to set out ridge height and rafter lengths. It does not govern foundation or stud dimensions.
Question 32Plans, Specifications and Setting Out
A builder needs to set out a building 12 m long and 8 m wide. Which sequence is the most logical for accurate setting out?
- Peg all four corners by eye, then check dimensions afterwards
- Mark the centre of the site, then work outwards without a baseline
- Set out the roof first, then work down to the foundation
- Establish a baseline, set the first corner square, then measure and square the remaining corners Correct answer.
Explanation
Setting out starts from a known baseline and a square first corner, then uses measured distances and diagonal checks to fix the other corners. This controls error accumulation. Working from the roof down or by eye is not an acceptable sequence.
Question 33Plans, Specifications and Setting Out
A site plan shows a proposed building set back 1.5 m from the side boundary. Why must this dimension be checked against the district plan before construction?
- To decide the position of the letterbox
- To calculate the number of skylights
- To determine the roof cladding colour
- To confirm the side yard complies with the permitted setback Correct answer.
Explanation
District plans set minimum yard setbacks that control where a building may sit relative to boundaries. The site plan dimension must be checked against those rules, and resource consent may be needed if it is infringed. This is a planning compliance matter, not a construction preference.
Question 34Plans, Specifications and Setting Out
What does a hidden or dashed line on a floor plan typically represent?
- A change in floor covering
- An element below the cut plane that is not visible, such as a foundation Correct answer.
- An element above the cut plane, such as a beam overhead
- The legal boundary of the site
Explanation
Dashed lines show elements that are hidden from the viewing plane, such as foundations, lintels or services below or behind the cut. They indicate something present but not directly visible. Solid lines show visible edges at the cut plane.
Question 35Plans, Specifications and Setting Out
A specification states that all timber framing shall be treated to a stated hazard class. Where should the builder look to confirm which members require treatment?
- The electrical layout
- The landscaping plan
- The roof cladding manufacturer's brochure
- The framing plan and the treatment specification together Correct answer.
Explanation
Treatment requirements are specified by member and location, so the builder cross-references the framing plan with the treatment specification. Hazard class depends on exposure and use, such as whether timber is in contact with the ground. Neither document alone gives the full picture.
Question 36Plans, Specifications and Setting Out
During setting out, a builder finds the diagonal check is 20 mm out. What is the correct action?
- Adjust the corners and re-check the diagonals until they are equal Correct answer.
- Ignore it because 20 mm is within tolerance for all work
- Move the pegs to match the longer diagonal only
- Continue and hide the error with cladding
Explanation
An unequal diagonal shows the outline is not square, so the corners must be adjusted and the diagonals re-measured until they match. Errors at setting out multiply through the build. A 20 mm out-of-square outline is not acceptable for a building.
Question 37Plans, Specifications and Setting Out
A builder is given a plan with a dimension chain along a wall of 1200, 900 and 1200 mm. What is the overall length of that wall segment?
- 3000 mm
- 2400 mm
- 3300 mm Correct answer.
- 2100 mm
Explanation
A dimension chain adds the individual segments to give the overall length, so 1200 plus 900 plus 1200 equals 3300 mm. Builders should also check that the overall dimension shown matches the sum of the chain. Discrepancies must be queried.
Question 38Plans, Specifications and Setting Out
Why is it important to check a set of drawings for the revision number and date before starting work?
- To check the number of pages printed
- To confirm the builder's hourly rate
- To ensure the builder is working from the latest issued information Correct answer.
- To verify the client's contact details
Explanation
Construction information is reissued as designs develop, and superseded drawings can contain outdated dimensions. Checking revision status ensures the work is built to the current design. Using an old revision can cause costly rework.
Question 39Plans, Specifications and Setting Out
A builder reads a note on the plan stating 'SLUMP 100'. In which document would the meaning of this note normally be defined?
- The electrical plan
- The window schedule
- The landscape plan
- The general notes or specification for the concrete work Correct answer.
Explanation
Abbreviations and technical notes are defined in the general notes or the relevant specification section, here the concrete specification. Slump is a measure of concrete workability tested on site. The builder should confirm the meaning rather than guess.
Question 40Plans, Specifications and Setting Out
A floor plan is drawn at 1:100. A wall measures 45 mm on the drawing. What is its actual length?
- 45 m
- 0.45 m
- 4.5 m Correct answer.
- 450 m
Explanation
At 1:100, each millimetre on the drawing represents 100 mm on site, so 45 mm becomes 4500 mm, or 4.5 m. Scaling from a drawing is a check only, and figured dimensions take precedence. Always convert units carefully.
Question 41Plans, Specifications and Setting Out
A builder is setting out on a sloping site and needs to establish a level line well above the ground. Which tool or method is most appropriate?
- A plumb bob hung from a rafter
- A tape measure held vertically by hand
- A spirit level held against a wall stud
- A dumpy level or laser level set on a stable reference Correct answer.
Explanation
A dumpy level or laser level establishes a horizontal reference plane over distance, which is essential on sloping ground. Spirit levels are for short runs, and a plumb bob checks verticality, not level. Hand-held tapes cannot establish a level line.
Question 42Plans, Specifications and Setting Out
A plan shows a wall with a dimension to the outside face and a separate dimension to the grid line. Why are grid lines used in setting out?
- They give a stable reference independent of wall thickness and finishes Correct answer.
- They mark the property boundary
- They show the direction of fall on the roof
- They indicate the position of underground pipes
Explanation
Grid lines are fixed reference lines, usually set by the designer, from which all elements are dimensioned. Because they do not move with wall thickness or cladding, they allow consistent setting out and coordination of structure and services. Builders transfer grid lines to site profiles.
Question 43Plans, Specifications and Setting Out
A builder discovers that the overall dimension on a plan does not equal the sum of the dimension chain along the same wall. What is the correct professional response?
- Choose the larger figure and continue
- Ask a workmate to decide on site
- Average the two figures and set out to that
- Raise a request for information and do not proceed on the assumption of a preferred figure Correct answer.
Explanation
A discrepancy between overall and chain dimensions is a documentation error that must be resolved by the designer through a formal request for information. Guessing or averaging risks building to the wrong dimension. The response should be recorded in writing.
Question 44Plans, Specifications and Setting Out
A builder must set out a building where the site plan dimension is given to the boundary, but the boundary pegs are missing. What is the most appropriate action?
- Arrange for a licensed surveyor to re-establish the boundary before setting out Correct answer.
- Estimate the boundary from the fence line and proceed
- Set out from the neighbour's building and assume it is parallel
- Use the road centre line as the boundary
Explanation
Boundary positions are a legal survey matter and only a licensed surveyor can re-establish them reliably. Setting out from a fence or neighbouring building assumes alignments that may be wrong. Proceeding without confirmed boundaries risks encroachment and non-compliance.
Question 45Framing and Structural Carpentry
Under NZS 3604, what is the maximum stud spacing permitted for a load-bearing timber-framed wall in a single-storey house?
- 1200 mm centres
- 600 mm centres Correct answer.
- 900 mm centres
- 450 mm centres
Explanation
NZS 3604 permits studs at a maximum of 600 mm centres in load-bearing walls for single-storey construction, provided the stud grade and dimensions suit the load and wind zone. Closer spacing is used where loads or wind demand it, but 600 mm is the general upper limit.
Question 46Framing and Structural Carpentry
Which timber grade marking on New Zealand framing timber indicates it has been machine stress graded?
- No. 1 Framing
- VSG
- SG8
- MSG Correct answer.
Explanation
MSG stands for machine stress graded, where each piece is mechanically tested and marked with its characteristic strength. SG8 is a visual stress grade designation, while VSG is a visual stress grade process, so MSG is the correct machine-graded marking.
Question 47Framing and Structural Carpentry
What is the primary purpose of a dwang (nog) in a timber-framed wall?
- To carry the lintel over an opening
- To transfer roof loads to the foundation
- To provide fixing for wall linings and brace the studs Correct answer.
- To anchor the bottom plate to the slab
Explanation
Dwang (nog) pieces are fitted horizontally between studs to stiffen them, prevent twisting, and provide a solid fixing for linings such as plasterboard. They do not carry primary structural loads or anchor plates.
Question 48Framing and Structural Carpentry
When setting out a rectangular building, what does checking the diagonals confirm?
- That the corners are square Correct answer.
- That the plates are straight
- That the floor is level
- That the wall lengths are equal
Explanation
Equal diagonal measurements across a rectangle confirm that the corners are square (90 degrees). If the diagonals differ, the layout is out of square and must be adjusted before fixing.
Question 49Framing and Structural Carpentry
What is the function of a jack stud (trimmer) beside a door opening?
- To support the lintel and transfer its load to the bottom plate Correct answer.
- To provide a nailing surface for the door jamb only
- To carry the top plate across the opening
- To brace the wall against wind
Explanation
Jack studs (trimmers) sit directly under each end of the lintel and carry the lintel load down to the bottom plate. King studs run full height beside them to stiffen the opening.
Question 50Framing and Structural Carpentry
Which member forms the top horizontal edge of a timber-framed wall and distributes loads to the studs?
- Bottom plate
- Top plate Correct answer.
- Ribbon plate
- Dwang
Explanation
The top plate caps the wall, ties the studs together, and distributes loads from trusses or joists into the studs. The bottom plate sits on the floor and anchors the wall.