- Rated capacity
- The maximum load a crane may lift at a stated radius, boom length and configuration, as published in the manufacturer's load chart. It is never increased by the operator.
- Load moment
- Load multiplied by radius from the slewing centre. Crane stability is governed by load moment, so increasing radius reduces allowable load even when the load mass is unchanged.
- Anti-two-block device
- A safety device that prevents the hook block from contacting the boom head. It stops the hoist function when the two parts approach each other, preventing rope and structural damage.
- Rated capacity limiter
- An instrument that measures load, radius and configuration and warns or stops the crane before the load chart is exceeded. It supplements, but does not replace, the operator's judgement.
- Duty classification
- A grouping of cranes by state of loading and class of utilisation, defined in AS 2550.1 and ISO 4301. It sets design life, inspection intervals and maintenance requirements.
- Slewing side load
- The horizontal force induced on a boom when a suspended load is accelerated or decelerated during slewing. It adds to the structural load and must stay within the chart allowance.
- All-terrain crane
- A mobile crane on a truck-style chassis with multiple steering modes and road travel capability, combining high road speed with rough-site mobility and a telescopic boom.
- Rough-terrain crane
- A mobile crane with a single cab, four-wheel drive and large tyres, designed for off-road site work. It cannot travel on public roads without permits and transport.
- Luffing jib tower crane
- A tower crane whose jib pivots up and down rather than slewing horizontally. It suits confined sites because the working radius changes without a large tail swing.
- Outrigger configuration
- The extension and spread of outrigger beams and pads. Full, partial and asymmetric extension each have their own load chart, and interpolation between them is not permitted.
- Ground bearing pressure
- The pressure a crane imposes on the ground through outrigger pads or tracks, calculated as total weight divided by total contact area. It must not exceed the verified allowable bearing pressure.
- Counterweight
- Mass fitted to the rear of the superstructure to counterbalance the load moment. It must match the configuration stated in the load chart used for the lift.
- Complex lift
- A lift requiring a documented plan by a competent person because of load, radius, ground or site conditions. It is one of the routine, complex and high-risk lift categories.
- Capacity utilisation
- Required capacity divided by rated capacity at the governing radius, expressed as a percentage. It is the key measure compared against site and plan limits.
- Governing radius
- The largest radius the load reaches along its path, combined with the heaviest load. It sets the capacity case that controls the whole lifting plan.
- Trial lift
- Lifting the load just clear of the ground to confirm balance, rigging behaviour and crane response before committing to the full lift path.
- Dynamic allowance
- An addition to the static load to account for hoisting acceleration, slewing, travelling and shock loading. It is applied when checking capacity and ground bearing pressure.
- Sling leg tension
- The force in one leg of a multi-leg sling, calculated as the load share divided by the cosine of the leg angle from vertical. Tension rises sharply as the angle increases.
- Sling angle factor
- A multiplier applied to sling capacity based on angle from horizontal: 1.000 at 90 degrees, 0.866 at 60, 0.707 at 45 and 0.500 at 30. Lower angles reduce capacity.
- Centre of gravity
- The point through which the load's weight acts. For a stable lift it must sit directly below the hook, otherwise the load tilts and redistributes force between sling legs.
- Choker hitch
- A sling passed around the load and through its own eye. It grips the load but derates capacity to roughly 75 to 80 percent of the sling's vertical rating.
- Basket hitch
- A sling passed under the load with both eyes on the hook. It can achieve up to twice the single-leg vertical rating, provided the bend radius is adequate.
- Tag line
- A rope attached to the load so a handler can control rotation and swing from outside the drop zone. It must never be wrapped around a hand or body.
- Exclusion zone
- The area beneath and around the load's path and potential drop, kept clear of people. Its radius is set by the load and swing, not by the crane base.
- Hook throat opening
- The gap of the hook. A hook is removed from service when the throat opening exceeds 10 percent of its original dimension, or when it is twisted more than 10 degrees.
- Wire rope discard criteria
- Conditions requiring removal of a wire rope, including broken wires in a set length, diameter reduction, corrosion, kinks, bird-caging and heat damage, per AS 3569 and ISO 4309.
- Stop signal rule
- Any person may give a stop signal to the crane operator, and the operator must obey it immediately. Only one designated dogger gives the working signals.
- Pre-start inspection
- The operator's daily check of tyres, outriggers, fluids, wire rope, hooks, brakes, limit switches, alarms and safety devices before the crane is used.
- Rigging system WLL
- The working load limit of the complete rigging assembly, which equals the lowest-rated component in the system, including slings, shackles, hooks and master links.
- Side pull prohibition
- Dragging or pulling a load sideways imposes forces the crane is not rated for. Loads are lifted vertically unless the manufacturer's chart expressly permits otherwise.
- Load-holding valve
- A valve in a hydraulic circuit that prevents the load from dropping if a hose fails or pressure is lost. Its function is verified during maintenance and inspection.
- Load test certificate
- Documentation recording a test at rated capacity after major repair or alteration, with the test load, method and witnesses. It verifies the crane's capacity before return to service.