MITO EV Auto L5 study materials
MITO EV Auto L5 study resources

MITO EV Auto L5: Extractives: Battery-Electric Mobile Plant in Mining and Quarrying

MITO EV Auto L5 · Work through your exam, one topic at a time.

All guide sections

Extractives: Battery-Electric Mobile Plant in Mining and Quarrying

What this domain tests

The Extractives domain tests battery-electric load-haul-dump (LHD) units, drills and quarry plant. It focuses on underground ventilation, charging-bay design, heat load, lithium-ion thermal runaway, gas monitoring and HV maintenance. The exam expects you to compare diesel and electric hazards rather than assume electric is hazard-free.

Core rules and concepts

  • Battery-electric plant removes diesel particulate matter and NOx at the point of use, but adds electrical, thermal and battery off-gas hazards.
  • Ventilation design must remove motor and charger heat and any battery thermal-runaway gases. A 150 kW motor at 90% efficiency releases about 15 kW of heat into the airway.
  • Lithium-ion thermal runaway can produce carbon monoxide, hydrogen, hydrogen fluoride and flammable electrolyte vapour. Gas detection and emergency response planning are required.
  • Charging bays need dedicated ventilation, fire suppression, isolation, barricades and a no-hot-work rule.
  • HV maintenance follows isolation, prove-dead, discharge and PPE rules; water and dust ingress ratings must suit the mine environment.

Worked example

An LHD has a 200 kWh pack and works to 80% depth of discharge: 200 × 0.80 = 160 kWh to replace. A 60 kW charger with 90% efficiency and average taper delivers about 50 kW, so charge time is 160 ÷ 50 = 3.2 hours. An 8-hour shift needs an opportunity charge at the break, not a single end-of-shift charge. The charger losses, about 6 kW, also heat the charging bay, so ventilation cannot be sized for the vehicle motor alone.

Traps that cost marks

Assuming an electric mine needs no ventilation; ignoring charger heat; treating battery off-gas as harmless; applying water to a lithium-ion fire without the site emergency response team; failing to barricade a smoking pack; and not isolating HV before maintenance.