You are the certifying plumber for a 40 m² single-storey addition to a 1965 brick veneer house in a high-rainfall coastal town. The addition has a 5° mono-pitch roof draining to a 4.5 m internal gutter with a single 80 mm downpipe at one end. The gutter has no overflow provision. The downpipe connects to a 1.5 m³ soak pit in stiff clay; the ground between the pit and the house slopes back toward the house. During a 30-minute intense storm, water overflows the internal gutter into the ceiling cavity and a damp patch appears on the ceiling. The roofer says the gutter falls at 1:100 and is therefore compliant. The owner wants you to sign off the drainage so the addition can be occupied.

1. Evaluate the gutter and downpipe capacity. What design information is missing?

Read the worked answer

A 1:100 gutter fall is not, by itself, proof of compliance. Capacity depends on the catchment area, rainfall intensity, gutter cross-section, outlet size, downpipe size and the number and position of outlets. The roof area is 40 m²; at a short-duration design intensity of, say, 180 mm/h, the peak flow is about 2 L/s. A single 80 mm downpipe at one end of a 4.5 m internal gutter may be marginal or inadequate, especially with wind-driven rain and a low pitch.

The missing information includes the design rainfall intensity for the site, the gutter profile and effective cross-section, the downpipe capacity, the roof catchment including any upper roof discharge, and whether the gutter has a continuous overflow path. Internal gutters need overflow provisions that discharge outside the building, not into the ceiling. I would also check the 5° roof pitch against the cladding manufacturer's minimum and confirm that the gutter is supported and fixed for the design load. The overflow during the storm is evidence that the existing design did not handle the actual event.

2. Assess the soak pit and site drainage. What are the consequences of the clay and reverse fall?

Read the worked answer

The soak pit is undersized for the storm. A 2 L/s peak for 30 minutes is about 3.6 m³ of water, while the pit stores only 1.5 m³ and the stiff clay will infiltrate slowly. Once the pit fills, water will back up the downpipe or overflow at the pit. Because the ground slopes back toward the house, overflow is likely to travel toward the addition and contribute to the damp patch.

The reverse fall is a serious defect. Stormwater must be directed away from the building; ponding against the foundation can cause dampness, settlement and damage. I would require survey levels of the pit, overflow path and house floor level. The disposal system needs either a legal point of discharge, an engineered soakage design with an overflow to a safe location, or a combination of storage and controlled discharge. A simple 1.5 m³ pit in clay is not adequate without a verified infiltration rate and overflow.

3. What remedial measures and inspections would you require before certification?

Read the worked answer

Before certifying, I would require a revised stormwater design that shows the design rainfall, catchment, gutter and downpipe capacities, overflow provisions and disposal method. Remedial work should include at least a second downpipe or a larger outlet, a gutter overflow that discharges clear of the building, and correction of the ground fall so water drains away from the house. The soak pit should be resized or replaced based on an infiltration test, with a surcharge overflow to a legal point or a safe dispersal area.

Inspections should verify gutter falls and fixings, overflow scuppers, downpipe connections, pit inlet and overflow levels, and the finished ground profile. I would flood-test the gutter and downpipe to confirm discharge and check for leaks into the ceiling. I would not certify the drainage until the internal gutter can handle the design flow without discharging into the building and the disposal system has a verified overflow path.