PGDB Certifying Plumber study materials
PGDB Certifying Plumber study resources

PGDB Certifying Plumber study plan

PGDB Certifying Plumber · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Sanitary plumbing and drainage systems

  • Map the scope of sanitary plumbing and drainage (fixtures, traps, soil and waste, venting, gradients) into a one-page concept map you can redraw from memory

  • Calculate fall, gradient and pipe sizing for at least six worked drainage scenarios without reference notes

  • Explain the function of each vent type (individual, circuit, stack, relief) and where each is required

  • List the common causes of trap seal loss and describe the design fix for each

Your checkpoint

A 20-item self-test on drainage design and venting, scored and with every wrong answer corrected in writing

Week 2

Sanitary plumbing and drainage systems & Water supply and backflow prevention

  • Trace a full sanitary drainage layout from fixture to connection point, annotating sizing, gradient and venting decisions

  • Identify every backflow risk in a typical domestic and a typical commercial installation and select an appropriate device for each

  • Describe the operating principle and testing method for the main backflow prevention device types

  • Explain cross-connection control requirements for irrigation, boilers, hose taps and chemical dosing

Your checkpoint

A comparison table of at least five backflow prevention device types with application, limitation, test method and hazard level

Week 3

Water supply and backflow prevention & Gasfitting installations and safety

  • Size and specify water supply pipework for a multi-fixture installation, including pressure and flow checks

  • Explain the safety chain for gas: combustion air, flueing, ventilation, gas pressure and leak testing

  • Describe the procedure for a gas installation pressure test and the acceptance criteria

  • Identify the signs of incomplete combustion and carbon monoxide risk, and state the required response

Your checkpoint

A written gas safety checklist of 15 items covering pre-commissioning, testing and handover

Week 4

Gasfitting installations and safety & Roofing, rainwater and stormwater systems

  • Describe flue terminal clearances and ventilation requirements for common appliance categories

  • Explain roof drainage design: catchment area, rainfall intensity, gutter sizing and downpipe capacity

  • Outline the detailing requirements for roof penetrations, flashings and waterproofing junctions

  • Explain siphonic versus gravity rainwater systems and when each is appropriate

Your checkpoint

A worked stormwater calculation for a pitched roof, showing catchment area, design rainfall intensity, gutter and downpipe sizing with assumptions stated

Week 5

Plumbing design, drawings and specifications & Compliance, standards and regulatory obligations

  • Read a set of plumbing drawings and produce a take-off of fixtures, pipe runs and fittings from them

  • Interpret plan, elevation, section and detail views and reconcile a discrepancy between them

  • Map each domain of the exam to the standards and regulatory instruments that govern it

  • Describe the compliance pathway for notifiable work, inspection and certification

Your checkpoint

A one-page regulatory matrix linking each of the nine exam domains to its governing standard or regulation and the responsible party

Week 6

Health, safety and environmental practice on site & Business, contracts and customer management

  • Build a site-specific hazard and risk register for a representative plumbing job, with controls ranked by hierarchy

  • Describe safe procedures for confined space entry, working at height, hot work and excavation

  • Explain environmental controls for silt, trade waste, refrigerant and solvent handling

  • Draft the key terms of a residential plumbing contract and explain variation and defect liability handling

  • Outline a process for handling a customer complaint through to resolution

Your checkpoint

A two-page site safety and environmental plan plus a one-page contract summary with variation and defects clauses explained

Week 7

Supervision, mentoring and quality assurance & Sanitary plumbing and drainage systems & Water supply and backflow prevention

  • Define the supervisor's role in quality assurance: inspection points, hold points and sign-off

  • Describe how to structure on-the-job mentoring and competency sign-off for an apprentice

  • Revisit the two heaviest domains and close every remaining knowledge gap identified in earlier self-tests

  • Explain the process for investigating and rectifying a non-conformance on site

Your checkpoint

A supervision pack: inspection and test plan template plus a mentoring and competency sign-off record, both completed for one sample job

Week 8

Sanitary plumbing and drainage systems & Water supply and backflow prevention & Gasfitting installations and safety & Roofing, rainwater and stormwater systems & Plumbing design, drawings and specifications & Compliance, standards and regulatory obligations & Health, safety and environmental practice on site & Business, contracts and customer management & Supervision, mentoring and quality assurance

  • Sit two full-length timed practice exams under exam conditions and record scores by domain

  • Re-study only the three weakest domains, using the error log from all prior weeks

  • Rehearse the calculation types most likely to appear: drainage gradients, pipe sizing, stormwater capacity, pressure and gas testing

  • Confirm exam-day logistics, permitted materials and time allocation strategy

Your checkpoint

A final scorecard by domain with a written remediation note for each domain still below your target, plus a one-page exam-day plan

Milestones

Week 2: You can sketch a complete sanitary drainage and venting layout from memory and justify every sizing and gradient choice, and you can name the correct backflow device for five different hazard scenarios without notes

Week 4: You can complete a gas pressure test procedure and a stormwater sizing calculation, each unaided, scoring at least 80% on your own self-marked check

Week 6: You can produce a site risk register and a contract summary from a blank page in under 45 minutes, and you have closed every error logged in weeks 1 to 5

Week 8: Both timed practice exams completed with all nine domains scored, no domain below your target threshold, and a written remediation note for any that remain