OCEB 2 Business Advanced flashcards
OCEB 2 Business Advanced · Build recall with a focused review session.
37 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Strategy-to-process traceability
- A mapping rule requiring each core process in the architecture to link to at least one enterprise goal, so unmapped processes can be retired, consolidated, or outsourced.
- Process classification framework
- A neutral cross-industry taxonomy such as APQC PCF that organizes processes into categories and process groups, enabling benchmarking and anchoring of an organization-specific architecture.
- Goal decomposition chain
- The cascade from enterprise goal to critical success factor, key performance indicator, process performance indicator, and operational metric, where each lower level must be causally defensible.
- Process owner versus functional manager
- The process owner is accountable for end-to-end process performance and design; the functional manager supplies competent resources. Separating the roles prevents conflicting performance targets.
- CMMI maturity levels
- Five levels: initial, managed, defined, quantitatively managed, and optimizing. Level 3 means processes are defined organization-wide; level 4 means they are measured and statistically controlled.
- Initiative prioritization formula
- Priority is computed from weighted strategic contribution and benefit divided by cost and risk exposure, producing a ranked BPM initiative portfolio rather than a first-come list.
- Inclusive OR gateway
- A BPMN gateway that activates one or more outgoing paths whose conditions evaluate true, and whose join waits only for the branches that were actually activated.
- Event-based gateway
- A BPMN gateway representing a race: the process waits for the first of several events to occur, then follows only that event's outgoing path. It is not a decision.
- Compensation versus error handling
- Error boundary events interrupt the activity and route the token to exception handling; compensation triggers handlers for already completed activities and does not interrupt the normal flow.
- Token simulation at AND join
- An AND split produces one token per outgoing flow, and the matching AND join waits until a token has arrived on every incoming flow before continuing.
- Black-box pool
- A BPMN pool that hides a participant's internal process and shows only the messages it exchanges, used when modeling a collaboration without exposing internal detail.
- Process soundness criteria
- Van der Aalst's soundness requires that every instance can complete, no dead tasks exist, and no tokens remain at completion. Relaxed soundness permits specified alternative terminations.
- Choreography versus collaboration
- A choreography models message exchange between participants without a central controller; a collaboration diagram shows pools and message flows and may include internal process detail.
- Data object in BPMN
- An artifact showing information used or produced by activities. It has no effect on token flow; data associations connect it to activities, and data stores persist across instances.
- Program versus project
- A BPM program is a permanent organizational capability following a continuous lifecycle; projects are temporary efforts delivering specific process changes within that program.
- Federated BPM governance
- A model where business units execute process work while a central group maintains method standards, templates, and repository rules, balancing local ownership with consistency.
- Benefit realization baseline
- A pre-change measurement of process performance plus a defined post-change measurement window, without which claimed improvement and ROI cannot be verified.
- Repository governance rule
- One authoritative version per process, mandatory metadata such as owner, status, and linked goals, and a defined review-approval workflow before publication.
- Efficiency versus effectiveness metrics
- Efficiency metrics cover cycle time, cost per instance, and first-time-right; effectiveness metrics cover customer satisfaction, compliance rate, and revenue influence.
- BPM center of excellence
- A central unit providing method expertise, standards, coaching, and tooling to distributed process teams, typically led by a BPM lead and staffed with architects and analysts.
- Kotter's eight steps
- Urgency, guiding coalition, vision, communication, empowerment, short-term wins, consolidation, and cultural anchoring. Skipping early steps undermines sustainment of process change.
- ADKAR model
- An individual change model: awareness, desire, knowledge, ability, and reinforcement. Change succeeds only when every affected group achieves all five elements.
- Resistance source classification
- Resistance is classified as information deficit, competence gap, incentive conflict, or identity threat, because each source requires a different intervention.
- Power-interest stakeholder grid
- A mapping that assigns engagement: high power and interest manage closely, high power low interest keep satisfied, low power high interest keep informed, low both monitor.
- Behavioral adoption indicators
- Measures such as system usage, workaround frequency, and exception rates that reveal actual adoption, unlike satisfaction surveys, which can be positive while behavior is unchanged.
- Three lines model
- The first line owns and manages process risk, the second line provides risk and compliance oversight, and the third line is independent internal audit reporting outside management.
- Control design versus effectiveness
- Design effectiveness asks whether a control, if performed as described, addresses the risk; operating effectiveness asks whether it was actually performed consistently over the period.
- Segregation of duties rule
- No single role should combine initiation, authorization, custody, and recording of a transaction; conflicts are identified by a rules matrix over role assignments.
- Risk exposure formula
- Risk exposure equals likelihood multiplied by impact. Residual risk is reassessed after existing controls and compared against the organization's defined risk appetite.
- Assurance mapping
- Linking each control objective to the assurance provider, such as management self-assessment, compliance, or internal audit, and recording coverage gaps to avoid duplicated testing.
- Little's Law
- Average work in process equals throughput multiplied by average cycle time. At constant throughput, halving WIP halves cycle time, which is why Lean targets queues.
- Cpk versus Cp
- Cp equals specification width divided by six sigma, ignoring centering. Cpk uses the nearer specification limit and mean, so it penalizes off-center processes.
- Theory of Constraints steps
- Identify the constraint, exploit it, subordinate other processes to it, elevate its capacity, then repeat. Improving a non-constraint does not raise system throughput.
- Process mining conformance checking
- Comparing an event log with a process model to measure fitness, how much observed behavior the model allows, and precision, how much modeled behavior is observed.
- Variant share as standardization metric
- The proportion of cases following the standard path. A low share indicates unclear rules, missing system support, or excessive exception handling.
- Automation suitability rule
- Automate tasks that are high-volume, rule-based, and stable; keep judgment-intensive or low-volume variants manual until standardization has been demonstrated.
- DPMO calculation
- Defects per million opportunities equals defects divided by units multiplied by opportunities per unit, then multiplied by one million; six sigma equals 3.4 DPMO.