OCEB 2 Business Intermediate study materials
OCEB 2 Business Intermediate study resources

OCEB 2 Business Intermediate study plan

OCEB 2 Business Intermediate · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Business Process Management fundamentals, concepts and terminology & Process identification, process landscape and process architecture

  • Define BPM and distinguish it from workflow management and case management using OCEB terminology.

  • Explain the BPM lifecycle phases (discovery, design, execution, monitoring, optimization) and their interrelations.

  • Identify the purpose and components of a process landscape and process architecture.

  • Classify processes into core, support, and management categories with examples.

  • Draft a simple process architecture diagram for a familiar organization.

Your checkpoint

A one-page process landscape diagram with at least 10 processes categorized as core, support, or management, plus a short glossary of 10 BPM terms.

Week 2

Process modelling with BPMN (core elements, events, gateways, subprocesses)

  • Model a business process using BPMN core elements: tasks, events, gateways, sequence flows, pools, and lanes.

  • Differentiate between exclusive, inclusive, and parallel gateways and select the correct one for given scenarios.

  • Apply intermediate events (message, timer, error) appropriately in a process model.

  • Create a BPMN model with a subprocess and explain its purpose.

  • Validate a BPMN model against common modeling guidelines (e.g., proper start/end events, gateway usage).

Your checkpoint

A BPMN diagram (using free tools like bpmn.io or Camunda Modeler) of a 10+ step process that includes at least one subprocess, two gateway types, and two intermediate events, accompanied by a brief explanation of modeling choices.

Week 3

Process modelling with BPMN (core elements, events, gateways, subprocesses) & Process analysis and improvement (as-is/to-be, value-added analysis, root-cause analysis)

  • Analyze an as-is BPMN model to identify bottlenecks, rework loops, and non-value-adding activities.

  • Conduct a value-added analysis on a process step list, classifying each step as value-adding, business-value-adding, or non-value-adding.

  • Apply root-cause analysis techniques (e.g., 5 Whys, fishbone diagram) to a process problem.

  • Propose improvements to a process and model the to-be state in BPMN.

  • Compare as-is and to-be models to quantify potential improvements.

Your checkpoint

A process improvement report containing an as-is BPMN model, a value-added analysis table, a root-cause analysis (fishbone or 5 Whys), and a to-be BPMN model with a summary of expected benefits.

Week 4

Process analysis and improvement (as-is/to-be, value-added analysis, root-cause analysis) & Process design and redesign, process reengineering

  • Explain the principles of process redesign and reengineering (e.g., elimination, simplification, integration, automation).

  • Differentiate between continuous improvement and radical reengineering.

  • Apply process redesign heuristics to a given process scenario and justify changes.

  • Evaluate the impact of redesign on organizational roles and IT systems.

  • Create a redesign proposal for a process, including a BPMN to-be model and a risk assessment.

Your checkpoint

A redesign proposal document that includes a BPMN to-be model, a list of redesign heuristics applied with justifications, and a risk/impact assessment table.

Week 5

Process performance measurement and key performance indicators

  • Define key performance indicators (KPIs) for process performance (time, cost, quality, flexibility).

  • Calculate process cycle time, throughput, and defect rate from given data.

  • Design a measurement plan for a process, including leading and lagging indicators.

  • Interpret a process performance dashboard and identify areas for improvement.

  • Explain the relationship between process KPIs and organizational strategy.

Your checkpoint

A process performance measurement plan for a chosen process, including at least 5 KPIs with definitions, formulas, data sources, and target values, plus a mock dashboard.

Week 6

Process implementation, automation and workflow management

  • Describe process implementation approaches (e.g., pilot, phased, big-bang) and their trade-offs.

  • Explain workflow management concepts and the role of a workflow management system (WFMS).

  • Identify process automation opportunities and classify them by complexity and benefit.

  • Map BPMN elements to workflow engine constructs (e.g., tasks to user/service tasks, gateways to routing).

  • Outline a change management plan for process implementation.

Your checkpoint

An implementation and automation plan for a process, including a workflow model (BPMN) annotated with automation candidates, a change management outline, and a list of implementation risks.

Week 7

Process monitoring, controlling and governance & Process performance measurement and key performance indicators

  • Define process monitoring and controlling activities and their inputs/outputs.

  • Set up a process control cycle using KPIs and define corrective actions.

  • Explain process governance structures (roles, responsibilities, policies).

  • Design a process audit checklist based on governance requirements.

  • Integrate performance measurement into monitoring and governance.

Your checkpoint

A process governance and monitoring framework document that includes a RACI matrix for process roles, a monitoring plan with KPIs and thresholds, and an audit checklist.

Week 8

Business Process Management fundamentals, concepts and terminology & Process identification, process landscape and process architecture & Process modelling with BPMN (core elements, events, gateways, subprocesses) & Process analysis and improvement (as-is/to-be, value-added analysis, root-cause analysis) & Process design and redesign, process reengineering & Process performance measurement and key performance indicators & Process implementation, automation and workflow management & Process monitoring, controlling and governance

  • Review all domains using a practice exam or comprehensive question set.

  • Identify weak areas through self-assessment and revisit key concepts.

  • Synthesize knowledge by creating a mind map linking all domains.

  • Practice time management by completing a timed mock exam.

  • Finalize a one-page summary sheet of critical facts and definitions.

Your checkpoint

A timed mock exam score of at least 80% and a one-page summary sheet covering key concepts from all domains.

Milestones

Week 4: Successfully model an as-is and to-be process in BPMN, complete a value-added analysis and root-cause analysis, and achieve at least 70% on a self-made quiz covering domains 1-4.

Week 6: Demonstrate understanding of process performance measurement by calculating KPIs from a case study and achieve at least 75% on a practice test for domains 5-6.

Week 8: Score at least 80% on a full-length timed mock exam covering all domains and submit the one-page summary sheet.