OCI Migration Architect study materials
OCI Migration Architect study resources

OCI Migration Architect flashcards

OCI Migration Architect · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Cloud Adoption Framework phases
OCI's structured migration method: Assess (inventory and readiness), Plan (waves and business case), Design (architecture), Deploy (execute and operate). Each phase produces artifacts that gate the next phase.
Six Rs migration strategies
Rehost (lift and shift), Replatform (minor tuning), Repurchase (move to SaaS), Refactor or re-architect, Retire, and Retain. Assign exactly one strategy per workload with a documented rationale.
Workload discovery inventory
Per-workload record of platform, OS, CPU/RAM/storage, network dependencies, RTO/RPO, licensing, data volume, and owner. Missing fields block wave planning and architecture design.
TCO comparison components
Compute, storage, egress, licensing (BYOL versus license-included), support, and staff or training costs. OCI Cost Estimator produces the baseline for on-premises versus cloud comparison.
OCVS live vMotion
OCI VMware Solution supports live vMotion of VMs from on-premises vSphere over FastConnect or VPN into the OCVS SDDC, enabling rehost with near-zero downtime. Verify region and shape availability first.
Assessment scoring model
Rate each workload on business criticality, technical complexity, and migration effort from one to five. High criticality with low complexity enters early waves; high complexity becomes refactor or retain.
AWS to OCI mapping
EC2 maps to Compute, S3 to Object Storage, RDS to Base Database or Autonomous Database, ELB to Load Balancer, Route 53 to DNS, and Direct Connect to FastConnect.
Exadata migration options
On-premises Exadata moves to Exadata Database Service on OCI or Exadata Cloud@Customer. Oracle RAC moves to RAC on bare metal or Autonomous Database depending on compatibility.
VCN CIDR planning rule
Use a non-overlapping /16 per VCN and /24 per subnet. Overlapping CIDRs with on-premises or peered VCNs break VPN and FastConnect routing and force re-IP or NAT.
FastConnect capacity
Each port provides 1 Gbps or 10 Gbps, with up to eight ports per cross-connect group. FastConnect is private dedicated connectivity; VPN over internet is the fallback path.
Internet versus NAT Gateway
Internet Gateway serves public subnets with bidirectional internet traffic. NAT Gateway gives private subnets outbound-only internet access, blocking unsolicited inbound connections while allowing updates and patches.
Service Gateway purpose
Routes traffic to Oracle Services Network such as Object Storage and Autonomous Database without traversing the internet or NAT. Traffic stays on the OCI backbone and is private.
Security lists versus NSGs
Security lists apply at subnet level; network security groups apply at VNIC level and are preferred for tiered applications. Both are allow-only stateful rules with no explicit deny.
Availability domains and fault domains
Availability domains are physically isolated datacenters within a region; fault domains are groupings inside an AD. Design multi-AD for high availability and cross-region for disaster recovery.
Load Balancer versus NLB
Load Balancer is Layer 7 for HTTP/HTTPS with flexible bandwidth. Network Load Balancer is Layer 4, preserves source IP, supports UDP, and targets extreme performance or non-HTTP protocols.
Block Volume performance tiers
Lower Cost, Balanced, Higher Performance, and Ultra High Performance scale IOPS and throughput with VPUs per GB. Boot volumes default to Balanced; size for IOPS before migration.
Object Storage tiers
Standard, Infrequent Access, Archive, and auto-tiering. Cross-region replication is asynchronous; bucket versioning and lifecycle policies support migration rollback and retention.
Route table behavior
Route tables attach per subnet; each rule names a destination CIDR or service and a target such as Internet Gateway, NAT Gateway, Service Gateway, DRG, or Local Peering Gateway. Most specific prefix wins.
Data Pump migration
Oracle expdp and impdp perform logical export and import. Use for cross-platform, cross-version moves and schema-level migrations; requires staging storage sized for the dump set.
GoldenGate replication
Extracts changes from source and applies to target for minimal-downtime cutover or active-active. Requires supplemental logging on source and a stable, low-latency network path.
Zero Downtime Migration
ZDM automates on-premises-to-OCI database moves in physical mode (RMAN, Data Guard) or logical mode (Data Pump, GoldenGate). Physical requires same endianness and compatible versions.
Autonomous Database compatibility
No OS-level access, no SYSDBA, and no direct upgrade from very old releases. Validate features, character set, and dependencies before choosing Autonomous Database over Base Database Service.
Non-Oracle database targets
MySQL maps to MySQL HeatWave; PostgreSQL to PostgreSQL on OCI or Autonomous Database where compatible; SQL Server to SQL Server on OCI. Assess feature gaps before replatforming.
Application migration order
Migrate the database first or in parallel with replication, then the application tier, then DNS cutover. Stateless tiers move first when possible to reduce risk.
Container services on OCI
OKE runs Kubernetes; Container Instances runs simple workloads; Container Registry stores images; OCI DevOps provides CI/CD. Match image architecture (x86 or Arm) to the chosen shape.
Bulk data transfer
Use OCI Data Transfer Service for large offline datasets, or rsync and rclone over FastConnect. Verify checksums after transfer and reconcile file counts before cutover.
Wave planning criteria
Group workloads by dependency, business unit, and risk. Each wave has entry and exit criteria, a rollback plan, and a named owner. First wave uses low-risk, low-dependency workloads.
Cutover runbook steps
Freeze changes, final replication sync, validate data, switch DNS or load balancer, smoke test, monitor, then decommission source. Each step has a rollback trigger and time budget.
Replication lag threshold
GoldenGate lag, Data Guard apply lag, and RMAN incremental apply must be near zero before cutover. Define an acceptable threshold such as five minutes and abort if exceeded.
DNS cutover technique
Lower TTL to 60 to 300 seconds at least 24 hours before cutover. Use weighted or failover routing to shift traffic gradually and keep old records during the rollback window.
Rollback decision deadline
Rollback plan includes a tested path to source, reconciliation for post-cutover writes, and a decision deadline such as four hours before rollback cost becomes prohibitive.
Post-migration validation checks
Compare row counts, checksums, application smoke tests, performance baselines, and security posture against pre-migration metrics. Document deviations and remediate before decommissioning source.