OCI Migration Architect study plan
OCI Migration Architect · Give each week a clear focus.
8 weeks · About 7 hours per week
Migration Architecture and Assessment
Map every assessment input you would request from a stakeholder (inventory, dependency, performance baseline, compliance constraints) into a checklist you can reuse
Explain the difference between rehost, replatform, refactor, and retire decisions and justify one choice per workload archetype
Draft a discovery questionnaire that captures application-to-database coupling and network egress dependencies
Identify the top five OCI migration blockers (licensing, latency, data residency, identity, unsupported features) and note how each is detected early
Your checkpoint
A one-page migration assessment checklist plus a completed sample assessment for one fictitious three-tier workload
Migration Architecture and Assessment
Build a workload sizing worksheet that converts on-premises CPU, memory, and IOPS into OCI shape candidates
Derive a total cost of ownership comparison that includes compute, storage, egress, and support tiers
Sequence a migration wave plan by dependency depth and business criticality
Define rollback criteria and decision gates for each wave
Your checkpoint
A wave plan for 12 workloads with dependency ordering, sizing rationale, and go/no-go criteria per wave
OCI Infrastructure and Networking Design for Migrations
Design a VCN layout with public and private subnets, route tables, and a NAT plus service gateway pattern for migration traffic
Select a connectivity option (Site-to-Site VPN, FastConnect, or hybrid combination) for a given bandwidth and latency requirement and justify it
Configure security lists versus network security groups and articulate when each applies
Plan DNS strategy including private zones and cutover of resolver settings
Your checkpoint
A network design document with a VCN diagram described in text, CIDR plan, routing table entries, and a connectivity decision matrix
OCI Infrastructure and Networking Design for Migrations
Size a FastConnect or VPN path against measured data transfer volume and available cutover window
Design load balancing and traffic management for a phased application cutover
Identify inspection and firewall insertion points without breaking replication flows
Document failure domains and availability domain placement for migrated tiers
Your checkpoint
A bandwidth and cutover-window calculation showing whether the chosen link type meets the migration schedule
Database and Application Migration to OCI
Compare database migration methods (logical export/import, physical backup and restore, and change-data-capture replication) and pick one per scenario
Plan schema conversion steps including character set, data type, and PL/SQL compatibility checks
Design an application migration approach for containerized and non-containerized tiers with configuration externalization
Define data validation queries and reconciliation checks to run before and after cutover
Your checkpoint
A database migration runbook for one workload covering pre-checks, replication setup, validation queries, and rollback
Database and Application Migration to OCI
Estimate downtime for each migration method and match it to business tolerance
Plan identity and secrets migration including federation and credential rotation
Design a test and performance validation plan that compares baseline against OCI results
Identify application dependencies on legacy platform services and map each to an OCI equivalent or a workaround
Your checkpoint
A downtime budget table per workload with method chosen, estimated minutes, and approval owner
Migration Execution, Cutover, and Operations
Write a cutover runbook with timestamped steps, owners, communication points, and abort conditions
Define pre-cutover and post-cutover validation checklists including smoke tests and data integrity checks
Plan a pilot migration and a rehearsal with measured results
Design monitoring, logging, and alerting for the post-migration steady state
Your checkpoint
A complete cutover runbook plus a rehearsal report template with pass/fail criteria
Migration Execution, Cutover, and Operations & Migration Architecture and Assessment
Run a full mock cutover against your runbook and record every deviation
Define hypercare exit criteria and the handover package to operations
Revisit the assessment checklist and wave plan to incorporate lessons learned
Complete timed practice across all four domains and review every missed item
Your checkpoint
A post-migration review document with deviations, corrective actions, and hypercare exit sign-off
Milestones
Week 2: Can produce a defensible wave plan and sizing rationale for an unseen workload description in under 30 minutes
Week 4: Can justify a connectivity choice with bandwidth math and explain the VCN routing path end to end
Week 6: Can select a database migration method and state its downtime estimate and validation steps without notes
Week 8: Mock cutover executed with a written deviation log and a completed hypercare exit checklist