Ohio Asbestos Abatement: ODH Program, Classification, and Notification

  • The Ohio Department of Health (ODH) Asbestos Program administers abatement licensure under Ohio Administrative Code Chapter 3701-34; Ohio EPA separately regulates air emissions and waste handling.

  • A regulated asbestos-containing material (RACM) under Ohio/NAAQS-aligned rules includes material with more than 1 percent asbestos that is friable, or will be crumbled/dry or pulverized during handling or demolition.

  • Ohio licensing categories include asbestos hazard abatement contractor, asbestos hazard abatement specialist (worker), project supervisor, air quality technician (air sampler), and asbestos hazard evaluation specialist (inspector).

  • Abatement notification must be submitted to ODH before work begins; the standard advance notice is 10 working days, with emergency abatement notifications due within 24 hours of the emergency.

  • A single-family private residence that the owner occupies is generally exempt from contractor licensing and notification requirements, but not from NESHAP emission and waste-disposal rules.

  • Non-friable material that will be mechanically crumbled, pulverized, or reduced to powder is treated as RACM regardless of its original asbestos percentage.

  • A project is a demolition or renovation of a facility; a facility is any institutional, commercial, public, industrial, or residential structure, installation, or building.

  • Ohio requires the licensed contractor to keep project records, including notification copies, waste shipment records, and air monitoring results, available for ODH inspection.

Quick reference

Ohio Asbestos Abatement: Work Practices, Containment, and Worker Protection

  • Regulated areas must be isolated with critical barriers, negative pressure enclosures, and HEPA filtration; workers enter and exit through a decontamination unit with clean, shower, and equipment rooms.

  • Air monitoring: personal samples are compared to the OSHA 8-hour TWA PEL of 0.1 f/cm3 and the 30-minute excursion limit of 1.0 f/cm3; clearance air must meet 0.01 f/cm3 by PCM or 70 structures/mm2 by TEM.

  • Required PPE includes a full-face or half-mask respirator with HEPA filters, disposable coveralls, head and foot coverings, and eye protection; respirators require fit testing and medical evaluation.

  • Wet methods are mandatory: material must be wetted before and during removal, and HEPA vacuums, not compressed air or dry sweeping, are used for cleanup.

  • Debris must be bagged or wrapped in leak-tight containers labeled with the OSHA warning statement and the identity of the material, then transported and disposed of at an approved landfill.

  • Removal of a regulated area must be preceded by a visual inspection by the project supervisor and, where required, clearance air sampling by an air quality technician.

  • The project supervisor is responsible for daily on-site supervision of abatement, worker training verification, and ensuring containment integrity is maintained throughout the project.

Quick reference

Ohio Asbestos Abatement: Inspection, Sampling, and Project Documentation

  • A thorough inspection requires sampling each homogeneous area; a homogeneous area is material of uniform color, texture, and date of application.

  • Bulk samples must be collected in a wet or wetted condition, placed in sealed containers, and analyzed by an accredited laboratory using PLM (NIOSH 7400 or equivalent) or TEM.

  • Bulk sample analysis reports must include sample location, material description, laboratory accreditation, and the percentage and type of asbestos detected.

  • A project design or abatement work plan must identify the scope, methods, containment, worker protection, and waste handling procedures before work begins.

  • Clearance criteria are met when the regulated area is visually clean and air samples collected by an accredited air quality technician meet the applicable PCM or TEM limit.

  • Project records must be maintained for at least three years and include notification, inspection report, abatement plan, monitoring data, and waste manifests.

  • Any material that will be disturbed and is presumed or confirmed to contain more than 1 percent asbestos must be handled as RACM unless a negative inspection establishes otherwise.

Quick reference

Ohio Asbestos Abatement: Training, Certification, and Enforcement

  • Abatement worker training requires a minimum of 32 hours of initial training, including hands-on exercises, followed by a refresher course every year.

  • Project supervisor and contractor training require a minimum of 40 hours of initial training, with annual refresher training to maintain certification.

  • Air quality technician training requires a minimum of 24 hours of initial training, with annual refresher training.

  • Asbestos hazard evaluation specialist (inspector) training requires a minimum of 24 hours of initial training, with annual refresher training.

  • Certification requires passing an accredited course, submitting an application to ODH with the required fee, and maintaining the certification through timely renewal.

  • Ohio may suspend, revoke, or deny a license for violations including working without a license, falsifying records, or failing to follow work practice standards.

  • The contractor must ensure that only currently certified workers and supervisors perform abatement activities and that certifications are on file and available for inspection.