OH Asbestos Abatement key terms
OH Asbestos Abatement · Get comfortable with the vocabulary.
- Asbestos-Containing Material (ACM)
- Related: Regulated Asbestos-Containing Material (RACM), Polarized Light Microscopy (PLM)
Any material or product that contains more than one percent asbestos by weight, as determined by polarized light microscopy. Ohio abatement rules apply to handling and removal of these materials in regulated facilities.
- Regulated Asbestos-Containing Material (RACM)
- Related: Asbestos-Containing Material (ACM), Friable
ACM that is friable, or that becomes friable when handled, or that is non-friable but will be disturbed by a regulated demolition or renovation. RACM triggers the strictest work practice and notification requirements.
- Friable
- Related: Non-Friable, Category I Non-Friable ACM
Describes material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability drives risk because fibers release easily into air and are more readily inhaled.
- Non-Friable
- Related: Friable, Category II Non-Friable ACM
Describes asbestos material that cannot be crumbled or powdered by ordinary hand pressure when dry. It still poses risk if cut, sanded, ground, or broken during renovation.
- Category I Non-Friable ACM
- Related: Category II Non-Friable ACM, Non-Friable
Non-friable asbestos material such as packings, gaskets, resilient floor coverings, and asphalt roofing products. It becomes regulated when sanded, ground, cut, or abraded so that it may release fibers.
- Category II Non-Friable ACM
- Related: Category I Non-Friable ACM, Regulated Asbestos-Containing Material (RACM)
Non-friable asbestos material other than Category I, such as asbestos cement siding, corrugated sheet, and some transite products. It becomes RACM if it is crumbled, pulverized, or reduced to powder during demolition or renovation.
- Presumed Asbestos-Containing Material (PACM)
- Related: Suspect Material, Asbestos Inspection
Material assumed to contain asbestos until sampling and analysis prove otherwise. Treating suspect material as PACM is the default safe assumption during inspection and renovation planning.
- Suspect Material
- Related: Presumed Asbestos-Containing Material (PACM), Bulk Sample
Any building material that may contain asbestos because of its type, use, or age, including thermal system insulation, floor tile, mastic, and joint compound. Suspect materials must be assumed or tested before disturbance.
- Bulk Sample
- Related: Chain of Custody, Polarized Light Microscopy (PLM)
A physical portion of material collected for laboratory analysis to determine asbestos content. Proper sampling uses wet methods, minimizes fiber release, and follows a documented chain-of-custody.
- Polarized Light Microscopy (PLM)
- Related: Bulk Sample, Asbestos-Containing Material (ACM)
The primary laboratory method for identifying asbestos in bulk building materials. It uses refractive index and optical properties to identify fiber type and estimate percentage by area.
- Phase Contrast Microscopy (PCM)
- Related: Transmission Electron Microscopy (TEM), Personal Air Sample
A laboratory method used to count airborne fibers on membrane filters. It counts all fibers of respirable size and cannot distinguish asbestos from other fibers, so it is used for exposure monitoring.
- Transmission Electron Microscopy (TEM)
- Related: Phase Contrast Microscopy (PCM), Clearance Air Monitoring
A high-resolution method that identifies asbestos fibers by structure, chemistry, and crystal pattern. It is used for clearance air testing and for distinguishing asbestos from non-asbestos fibers.
- Asbestos Inspection
- Related: Presumed Asbestos-Containing Material (PACM), Asbestos Survey Report
A documented on-site survey to locate and assess suspect asbestos materials before renovation or demolition. It identifies material type, condition, quantity, and accessibility to support abatement planning.
- Asbestos Survey Report
- Related: Asbestos Inspection, Abatement Notification
A written record of inspection findings, including sample locations, laboratory results, material quantities, and condition. It guides the abatement scope and supports required regulatory notifications.
- Abatement
- Related: Encapsulation, Enclosure, Asbestos Abatement Contractor
Any activity that removes, encapsulates, or encloses asbestos material, including related preparation, cleanup, and disposal. Proper abatement protects occupants and workers from fiber release.
- Encapsulation
- Related: Enclosure, Abatement
Applying a sealant to asbestos material so fibers are bound and cannot become airborne. It does not remove the material, so the hazard remains and must be managed and documented.
- Enclosure
- Related: Encapsulation, Abatement
Building an airtight barrier around asbestos material to isolate it from occupied space. The material stays in place, so future work in the area requires caution and updated records.
- Abatement Notification
- Related: Asbestos Abatement Contractor, Ohio Department of Health Asbestos Program
Written notice to the Ohio Department of Health before starting certain abatement projects, giving dates, location, contractor, and scope. Timely filing lets regulators schedule inspections and verify compliance.
- Ohio Department of Health Asbestos Program
- Related: Abatement Notification, Asbestos Abatement Contractor
The state program that licenses asbestos abatement contractors and certifies workers, supervisors, inspectors, and project designers. It enforces work practice standards, notification rules, and training requirements.
- Asbestos Abatement Contractor
- Related: Abatement Notification, Abatement Supervisor
A business licensed by the state to perform asbestos abatement work. It must employ certified personnel, follow work practice standards, and maintain required records and insurance.
- Abatement Supervisor
- Related: Asbestos Abatement Worker, Competent Person
A certified individual who directs abatement work, enforces work practices, and ensures containment integrity. The supervisor oversees worker safety, air monitoring, and final cleanup.
- Asbestos Abatement Worker
- Related: Abatement Supervisor, Asbestos Handler Certification
A certified individual who performs hands-on removal, cleanup, and disposal of asbestos material under supervision. Certification requires approved training and periodic refresher courses.
- Asbestos Handler Certification
- Related: Asbestos Abatement Worker, Refresher Training
State-issued credential confirming a person completed approved asbestos training and passed required exams. It must be renewed through refresher training and kept available on the job site.
- Refresher Training
- Related: Asbestos Handler Certification, Abatement Supervisor
Periodic retraining that certified asbestos personnel must complete to keep credentials current. It updates workers on regulation changes, work practices, and safety procedures.
- Competent Person
- Related: Abatement Supervisor, Work Practice Standards
A person capable of identifying asbestos hazards and authorized to take corrective action. This role inspects work areas, monitors conditions, and ensures required safeguards are in place.
- Work Practice Standards
- Related: Negative Pressure Enclosure, Wet Methods
Required procedures for abating asbestos safely, including wet methods, containment, negative pressure, and proper waste handling. They reduce fiber release and protect workers and building occupants.
- Negative Pressure Enclosure
- Related: Containment Barrier, HEPA Vacuum
A sealed work area kept at lower air pressure than surrounding spaces so air flows inward. This prevents asbestos fibers from escaping into occupied areas during abatement.
- Containment Barrier
- Related: Negative Pressure Enclosure, Decontamination Unit
Plastic sheeting and sealed framing that separate the work area from occupied space. Barriers must be sturdy, sealed at seams, and inspected for damage throughout the project.
- Decontamination Unit
- Related: Containment Barrier, Personal Protective Equipment (PPE)
A connected series of chambers where workers remove contaminated clothing and clean themselves before leaving the work area. It typically includes a dirty room, shower, and clean room.
- HEPA Vacuum
- Related: Negative Pressure Enclosure, Wet Methods
A vacuum equipped with a high-efficiency particulate air filter that traps very small particles, including asbestos fibers. It is used for cleanup and must be maintained and checked regularly.
- Wet Methods
- Related: Work Practice Standards, Surfactant
Techniques that keep asbestos material wet during removal and handling to suppress dust and fiber release. Water or amended water is applied before and during disturbance.
- Surfactant
- Related: Wet Methods, Work Practice Standards
A wetting agent added to water so it penetrates asbestos material more effectively and reduces airborne fibers. It is commonly called amended water in abatement work.
- Personal Protective Equipment (PPE)
- Related: Respirator Fit Test, Decontamination Unit
Gear worn to limit exposure, including respirators, disposable coveralls, gloves, and eye protection. Selection depends on exposure level and must be used with proper training and fit testing.
- Respirator Fit Test
- Related: Personal Protective Equipment (PPE), Exposure Monitoring
A test confirming a tight seal between a respirator and the wearer's face. It must be repeated periodically and whenever facial conditions or equipment change.
- Exposure Monitoring
- Related: Personal Air Sample, Permissible Exposure Limit (PEL)
Collecting air samples to measure worker exposure to airborne asbestos fibers. Results guide respirator selection, work practice changes, and compliance with exposure limits.
- Personal Air Sample
- Related: Exposure Monitoring, Phase Contrast Microscopy (PCM)
An air sample collected in the worker's breathing zone using a pump and filter cassette. It estimates the individual's actual inhalation exposure during a task or shift.
- Permissible Exposure Limit (PEL)
- Related: Exposure Monitoring, Personal Air Sample
The maximum allowable airborne asbestos concentration for a worker over an eight-hour shift. Employers must keep exposures at or below this level through controls and protective equipment.
- Clearance Air Monitoring
- Related: Transmission Electron Microscopy (TEM), Visual Inspection
Post-abatement air sampling to confirm the work area is clean before containment is removed or space is reoccupied. It verifies that fiber levels meet required clearance criteria.
- Visual Inspection
- Related: Clearance Air Monitoring, HEPA Vacuum
A careful look at the work area for dust, debris, and residue after cleaning and before clearance testing. Any visible material must be removed and the area recleaned.
- Asbestos Waste Disposal
- Related: Wet Methods, Work Practice Standards
Packaging, labeling, transporting, and landfilling asbestos waste according to regulatory requirements. Waste must be wetted, sealed in leak-tight containers, and handled by trained personnel.
- Chain of Custody
- Related: Bulk Sample, Asbestos Survey Report
A documented record tracking a sample from collection through laboratory analysis. It preserves sample integrity and supports reliable, defensible results.