OK Boiler Operator flashcards
OK Boiler Operator · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- ASME Section I scope
- Covers power boilers generating steam above 15 psig or hot water above 160 psig and 250 degrees F. Sets rules for design, materials, fabrication, and stamping.
- Maximum allowable working pressure
- The highest pressure at which a boiler or pressure part may operate, determined by the weakest component. Safety valves may not be set above this value.
- Lowest permissible water level
- The minimum water level at which the boiler may be safely operated, set at least 3 inches above the highest heating surface. The low-water cutoff must be mounted at or above this line.
- Firetube vs watertube
- Firetube boilers pass hot combustion gases through tubes surrounded by water. Watertube boilers pass water through tubes surrounded by hot gas and respond faster to load changes.
- Blowoff valve arrangement
- Two valves in series on the blowoff line: a quick-opening valve at the boiler and a slow-opening valve downstream. Piping must be at least Schedule 80 steel.
- Fusible plug
- A plug with a low-melting alloy installed in the crown sheet of a firetube boiler. It melts at about 445 degrees F to warn of low water.
- Siphon on pressure gauge
- A pigtail-shaped tube that traps condensate between the steam and the gauge, protecting the Bourdon tube from live steam temperature and keeping the gauge accurate.
- Three-way gauge glass valve
- A valve arrangement that allows the gauge glass to be blown down and then re-established without taking the boiler out of service, confirming the glass is not plugged.
- Safety valve blowdown
- The pressure drop below the set pressure at which a safety valve reseats, usually 2 to 4 percent for Section I valves. Excessive blowdown can waste steam.
- Steam trap failure modes
- A trap that fails open wastes live steam and raises fuel cost. A trap that fails closed backs up condensate and can cause water hammer and poor heating.
- Furnace draft reading
- Measured in inches of water column, with 1 inch w.c. about 0.036 psi. A normal high-fire furnace draft is roughly negative 0.05 to negative 0.10 inches.
- Conductivity blowdown control
- Blowdown rate equals feedwater TDS divided by maximum allowable TDS, minus one. This keeps dissolved solids below the level that causes carryover and scale.
- Deaerator function
- Removes dissolved oxygen and other gases from feedwater by heating it and scrubbing with steam. Oxygen pitting is prevented by deaeration plus a sulfite residual.
- Scale thermal penalty
- Scale insulates the tube surface, so heat cannot reach the water efficiently. Even a thin layer raises fuel consumption and can overheat tube metal.
- Bottom vs surface blowdown
- Bottom blowdown removes sludge and settled solids from the lowest point. Surface blowdown removes dissolved solids concentrated at the water surface.
- Stoichiometric air
- The exact amount of air needed for complete combustion of a fuel. Practical firing uses excess air above this to ensure all fuel burns.
- Three T's of combustion
- Temperature, turbulence, and time. All three must be sufficient; a deficiency in any one produces carbon monoxide and unburned fuel.
- Furnace purge requirement
- Before every light-off, the furnace must be purged with air, typically for five air changes at high fire, to clear any accumulated combustible gases.
- Burner turndown ratio
- The ratio of maximum firing rate to minimum stable firing rate. A packaged gas burner commonly achieves about 10 to 1 turndown.
- Flame failure response
- If the flame scanner loses the flame signal, the burner management system must shut off fuel within the trial-for-ignition time and lock out until manually reset.
- Cold boiler warm-up rate
- A cold boiler is warmed slowly, typically no faster than about 100 degrees F per hour, to avoid thermal stress on the shell, tubes, and tube sheets.
- Air cock during warm-up
- Opened on a cold boiler so air and non-condensable gases escape as steam forms. Closed once steam appears, before the boiler pressurizes.
- Bringing boiler on line
- Warm the boiler, raise pressure slightly above header pressure, then slowly open the main steam stop valve to equalize with the header without water hammer.
- Thermal shock risk
- Adding cold feedwater to a hot, low-water boiler can crack tubes and tube sheets. Feedwater should be added gradually and at a temperature close to boiler water.
- Low-water cutoff test
- Lower the water level in the float chamber or simulate the condition to confirm the burner shuts off. A manual-reset device must be reset only after the cause is corrected.
- Flame safeguard sequence
- Purge, trial for ignition, main flame proving, and post-purge. A lockout after flame failure requires manual reset before another light-off attempt.
- Hydrostatic test pressure
- For Section I boilers the test pressure is 1.5 times the maximum allowable working pressure. Safety valves are removed or gagged during the test.
- Ultrasonic tube thickness
- Measures remaining wall thickness of boiler tubes. Tubes must be replaced when the wall falls below the minimum allowed by the code.
- Waterside inspection
- Checks the water side for pitting, scale, and corrosion, especially at tube sheets and staybolts. Fireside inspection checks for soot, refractory damage, and tube bulging.
- Oklahoma boiler program
- The Oklahoma Department of Labor administers boiler safety under the Oklahoma Administrative Code, Title 380, including inspection and certification requirements.
- Certificate of inspection
- Issued after a satisfactory inspection and must be posted near the boiler. A boiler may not be operated with an expired certificate.
- Out-of-service order
- An inspector may order a boiler out of service for unsafe conditions. Operating it after that order is a violation subject to enforcement action.