Asbestos-containing material definition
Material containing more than 1 percent asbestos by weight, as determined by an accepted laboratory method such as polarized light microscopy. The 1 percent threshold determines whether abatement rules apply.
DEQ asbestos program authority
Oregon DEQ administers asbestos abatement rules under OAR Chapter 340, Division 248, covering contractor licensing, worker certification, notifications, work practices, and waste disposal.
Licensed abatement contractor
A business entity holding a current Oregon DEQ asbestos abatement contractor license. Abatement for compensation may only be performed by or under such a licensed contractor.
Certified asbestos worker
An individual holding a valid DEQ asbestos worker certificate, obtained through accredited training and application. Workers perform abatement tasks under a certified supervisor.
Certified asbestos supervisor
An individual certified by DEQ to oversee abatement projects, direct workers, enforce work practices, and ensure the regulated area and decontamination systems function as required.
Abatement notification
Written notice to DEQ before abatement begins, identifying the site, contractor, supervisor, dates, scope, and methods. Schedule changes require an updated notification.
Regulated area
The work area established for abatement, marked with warning signs and separated by barriers. Access is limited to certified workers using proper protective equipment and decontamination.
Negative air pressure
A pressure differential maintained with HEPA-filtered exhaust so air flows into the work area rather than out. It prevents asbestos fibers from escaping to occupied spaces.
HEPA filtration
High-efficiency particulate air filtration that captures very fine particles, including asbestos fibers. HEPA units are used for negative air machines and vacuums during abatement and cleanup.
Wet methods
Techniques that wet asbestos-containing material before and during disturbance to suppress fiber release. Dry sweeping, dry scraping, and dry demolition are prohibited.
Decontamination unit
A sequenced clean room, shower, and equipment room attached to the work area. It allows workers to remove contaminated clothing and clean before leaving the regulated area.
Personal protective equipment
Respirators, disposable coveralls, gloves, and eye protection worn by abatement workers. Respirator use requires fit testing, medical clearance, and training under the employer's program.
Asbestos survey before renovation
An inspection by an accredited inspector to identify and sample suspect materials before demolition or renovation. Results determine which materials require abatement and notification.
Polarized light microscopy
A laboratory method using polarized light to identify asbestos minerals and estimate their percentage in bulk samples. It is the standard method for determining asbestos content.
Point counting
A more precise microscopic estimation technique used when initial PLM results are near a regulatory threshold or when a material's asbestos content must be confirmed.
Friable asbestos material
Material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friable material releases fibers more readily and is subject to stricter handling rules.
Nonfriable asbestos material
Material that cannot be crumbled by hand pressure when dry, such as intact floor tile or roofing. It may become regulated if cut, sanded, or otherwise made friable.
Asbestos waste labeling
Waste containers must be leak-tight and labeled as asbestos waste. Bagged or wrapped material is wetted, sealed, and marked before transport off site.
Waste shipment record
A document accompanying asbestos waste from the project to the disposal site, identifying the generator, contractor, quantity, and receiving landfill. Records are retained for review.
Approved asbestos landfill
A disposal facility permitted to accept asbestos-containing waste. Abatement waste must be taken to such a facility, not an ordinary construction debris site.
Accredited training refresher
Periodic refresher training required to keep worker and supervisor certificates current. The course length and interval depend on the certification type under DEQ rules.
Certificate reciprocity
Recognition of training or certification from another jurisdiction. Oregon certification is issued to individuals and generally requires meeting Oregon's own application and training requirements.
Clearance inspection
A post-abatement visual inspection confirming the work area is free of debris and residue. Air sampling may also be required before containment is removed or the area is released.
Containment barriers
Plastic sheeting and rigid framing that isolate the work area from occupied spaces. Barriers are sealed at seams and openings to prevent fiber migration during abatement.
Encapsulation
Applying a sealant to asbestos-containing material to bind fibers and prevent release. It is an abatement method distinct from removal and enclosure, and it requires notification.
Enclosure
Building an airtight barrier around asbestos-containing material so it is not disturbed. Enclosure leaves the material in place and requires long-term management and labeling.
Operations and maintenance plan
A written program for managing asbestos-containing material left in place, covering work practices, training, periodic inspection, and recordkeeping for building maintenance activities.
Asbestos warning signs
Posted at regulated area boundaries, stating that asbestos is present and access is limited to authorized personnel wearing required protective equipment.
Air monitoring
Sampling of airborne fiber concentrations during and after abatement, used to verify containment performance and support clearance decisions. Results are documented and retained.
Recordkeeping requirements
Contractors retain notifications, training and certification records, waste shipment records, monitoring results, and project documentation. Records must be available to DEQ on request.
Prohibited work practices
Activities such as dry sweeping, dry scraping, use of compressed air on asbestos material, and uncontrolled demolition. These practices disperse fibers and violate abatement rules.
Demolition notification
Notice to DEQ before demolition of a facility, including asbestos survey results and abatement status. Demolition may not proceed until regulated asbestos material is addressed.