OR Electrician study materials
OR Electrician study resources

OR Electrician cheat sheet

OR Electrician · Keep the key ideas within reach.

Quick reference

National Electrical Code (NFPA 70)

  • NEC Article 90 states the code purpose and scope; Chapters 1-4 apply generally, Chapter 5 covers special occupancies, Chapter 6 special equipment, Chapter 7 special conditions, and Chapter 8 communications systems.

  • NEC 210.8 requires GFCI protection for specified receptacle outlets in dwelling units, including bathrooms, kitchens, garages, outdoors, and unfinished basements, subject to the edition's exact list.

  • NEC 210.12 requires AFCI protection for specified dwelling-unit branch circuits, including bedrooms, living areas, and other rooms listed in the section.

  • Box fill under NEC 314.16 counts conductors, clamps, devices, and equipment grounding conductors, then applies the volume allowance from Table 314.16(B).

  • NEC Chapter 9 Table 1 limits conduit fill to 53 percent for one conductor, 31 percent for two conductors, and 40 percent for three or more conductors.

  • NEC 110.26 requires a working space at least 30 inches wide, 3 feet deep, and 6.5 feet high in front of electrical equipment, with depth increasing at higher voltages.

  • Single-phase voltage drop: VD = 2 x K x I x L / CM; three-phase voltage drop: VD = 1.732 x K x I x L / CM, where CM is circular mils.

  • NEC Article 250 covers grounding and bonding, including the equipment grounding conductor, grounding electrode system, and bonding of metal parts.

Quick reference

Oregon Electrical Specialty Code

  • The Oregon Electrical Specialty Code is Oregon's adopted electrical code and consists of the current NFPA 70 plus Oregon-specific amendments.

  • OAR chapter 918, division 305 contains the Building Codes Division rules that adopt and amend the Oregon Electrical Specialty Code.

  • When an Oregon amendment conflicts with the NEC text, the Oregon amendment governs the installation.

  • The OESC applies to new construction, alterations, and repairs of electrical installations in Oregon, subject to statutory exemptions.

  • An electrical permit is required before covered electrical work begins, and concealment work must be inspected before it is covered.

  • Electrical work must be performed by a licensed electrician or by an apprentice under the supervision required by Oregon statute and rule.

  • The OESC is enforced statewide by electrical inspectors through permits, inspections, and code compliance orders.

Quick reference

Oregon statutes and administrative rules for electrical work

  • ORS Chapter 479 is Oregon's Electrical Safety Law and addresses electrician licensing, electrical permits, inspections, enforcement, and penalties.

  • OAR chapter 918 contains the Building Codes Division administrative rules that implement ORS Chapter 479 and the electrical code.

  • The Oregon Building Codes Division issues electrician licenses and administers the state electrical code program.

  • Oregon license categories include General Journeyman, General Supervising, Limited Residential, Limited Maintenance, Limited Renewable Energy Technician, Limited Sign, Limited Pump Installation, and Apprentice.

  • A licensed electrician or properly supervised apprentice must perform electrical work unless a specific statutory exemption applies.

  • Electrical inspectors may require correction of noncompliant work and may issue stop-work orders or other enforcement actions.

  • Violations of Oregon electrical licensing or permit requirements can result in civil penalties and required corrective work.

Quick reference

Electrical theory and load calculations

  • Ohm's law: V = I x R, where V is volts, I is amperes, and R is ohms.

  • Power formulas: P = V x I for DC or unity power factor; P = V x I x PF for single-phase AC; P = 1.732 x V x I x PF for three-phase AC.

  • In a balanced wye system, line voltage equals 1.732 times phase voltage, and line current equals phase current.

  • NEC Table 220.12 assigns general lighting load in volt-amperes per square foot; dwelling units use 3 VA per square foot.

  • A demand factor is the ratio of maximum demand to total connected load and is applied to calculate service and feeder loads.

  • Conductor ampacity must be adjusted for ambient temperature and conductor count and must be at least the calculated load after adjustment.

  • Voltage drop is calculated with VD = 2 x K x I x L / CM for single-phase circuits and VD = 1.732 x K x I x L / CM for three-phase circuits.

  • Box fill is calculated by counting conductors, clamps, devices, and equipment grounding conductors and applying NEC Table 314.16(B) volume allowances.

Quick reference

Installation safety and trade practices

  • Lockout/tagout isolates hazardous energy, applies locks and tags, and verifies de-energization before electrical work begins.

  • Test before touch requires verifying a circuit is de-energized with a properly rated tester before contacting conductors or terminals.

  • NFPA 70E establishes arc flash and shock risk assessment requirements, including the arc flash boundary and required PPE.

  • The arc flash boundary is the distance at which incident energy equals 1.2 calories per square centimeter; appropriate PPE is required inside that boundary.

  • NEC 590.6 requires GFCI protection for temporary receptacles and cord sets on construction sites, with limited exceptions for assured equipment grounding conductor programs.

  • The 4-to-1 ladder rule sets the base 1 foot from the wall for every 4 feet of working ladder height.

  • Energized electrical work requires a documented permit, justification, hazard analysis, PPE selection, and approval before work begins.

  • Temporary wiring must be protected from physical damage and must use listed cords, connectors, and grounding connections suitable for the environment.