OR General Contractor flashcards
OR General Contractor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- CCB License Requirement
- Oregon requires a CCB license for anyone who, for compensation, arranges, offers to arrange, or performs construction work on real property. Residential and commercial licenses are separate endorsements.
- Residential General Contractor Insurance
- A residential general contractor must carry at least $500,000 per-occurrence general liability insurance and a $25,000 surety bond before the CCB will issue or renew a license.
- Commercial General Level 1 Bond
- A Commercial General Contractor Level 1 must post a $75,000 surety bond and carry $1 million per-occurrence and $2 million aggregate general liability insurance.
- License Renewal Cycle
- CCB licenses expire two years from the date of issuance and renew on a staggered biennial cycle. A contractor may not perform work while the license is expired, suspended, or inactive.
- Unlicensed Contractor Consequences
- An unlicensed contractor cannot bring a court action to collect compensation for construction work, and a homeowner may recover amounts paid to an unlicensed contractor.
- Written Contract Threshold
- Residential construction contracts over $2,000 must be in writing and include the contractor's CCB license number, the consumer notice statement, and the 3-business-day right to cancel.
- Right to Cancel
- The homeowner has 3 business days to cancel a residential construction contract. The notice must be printed in at least 10-point bold type and the period runs from signing.
- Down Payment Limit
- A contractor may not demand or receive more than one-third of the contract price as a down payment before work begins on a residential project.
- Lien Filing Deadline
- A construction lien must be filed within 75 days after the contractor's last day of work. A Notice of Right to Lien must be given within 20 days of first furnishing labor or materials.
- Prompt Payment Statute
- Oregon requires owners to pay contractors within 30 days of a proper invoice and contractors to pay subcontractors within 7 days of receiving payment.
- Fall Protection Threshold
- OSHA fall protection is required at 6 feet for general construction and 10 feet for scaffolding. Guardrails, safety nets, or personal fall arrest systems are acceptable controls.
- Excavation Protective Systems
- Excavations 5 feet or deeper require protective systems such as sloping, shoring, or shielding, and a competent person must inspect the excavation daily before workers enter.
- Extension Ladder Slope
- Extension ladders must be set at a 4:1 slope, extend 3 feet above the landing, and be secured at the top. Workers must never stand on the top two rungs.
- Oregon Energy Code Testing
- Oregon's energy code sets insulation, window U-factor, and air-sealing requirements, and blower-door testing is required for new dwellings to verify envelope tightness.
- Structural Concrete Strength
- Minimum compressive strength for structural concrete is typically 2,500 psi for foundations and 3,000 psi for slabs on grade, per ACI 318 and Oregon amendments.
- Exam Passing Score
- The residential general contractor exam is 100 questions with a 180-minute limit. A passing score is 70 percent overall and 70 percent in each section.
- Continuing Education Requirement
- Residential general and specialty contractors must complete 8 hours of CCB-approved continuing education per two-year renewal cycle, including 3 hours of laws and business practices.
- License Number Format
- A CCB license number is a six-digit number. Consumers can verify a contractor's license status, bond, and insurance through the CCB online search.
- Workers Compensation Requirement
- Workers' compensation coverage is required for all employers with one or more employees. Sole proprietors and corporate officers may be exempt but must file the appropriate exemption form.
- Recovery Fund
- The CCB's Residential Contractor Recovery Fund pays consumers who obtain a judgment against a licensed contractor that cannot be satisfied, subject to per-claim and per-contractor caps.
- Statute of Repose
- Oregon's statute of limitations for written contracts is 6 years. Construction defect claims are generally brought within 2 years of discovery, with a 10-year statute of repose.
- Civil Penalty Amounts
- The CCB may impose civil penalties of up to $5,000 per violation for unlicensed contracting and up to $1,000 per violation for other licensing violations.
- Complaint Response Deadline
- The CCB consumer complaint process requires the contractor to respond within 14 days. Failure to respond can result in a default order and license suspension.
- Scaffold Requirements
- Scaffold platforms must be fully planked with a 3-foot guardrail and a 4-inch toe board. Supported scaffolds must maintain a 4:1 height-to-base ratio.
- Radon-Resistant Construction
- Radon-resistant construction is required in designated counties and includes a soil-gas barrier, a vent pipe, and a junction box for a future fan.
- Utility Locate Requirement
- Call 811 at least 2 business days before digging. The locate request is valid for 10 business days and must be renewed if work extends beyond that period.
- License Suspension Effect
- A contractor whose license is suspended must stop all work, including work already under contract, until the suspension is lifted. Continuing to work is a violation subject to civil penalty.
- Bond and Insurance Lapse
- A contractor must maintain the required bond and insurance continuously. A lapse of more than 30 days may result in license suspension by the CCB.
- Retainage Limit
- Retainage on private commercial projects is limited to 5 percent of the contract price. On public projects the limit is 5 percent until substantial completion.
- Change Order Requirement
- A written change order signed by the owner is required before performing work outside the original contract scope. Oral changes are unenforceable for price adjustments.
- Egress Opening Size
- Every sleeping room must have an operable emergency escape opening with a minimum net clear opening of 5.7 square feet and a minimum width of 20 inches.
- Stairway Dimensions
- Stairways must have a minimum headroom of 6 feet 8 inches, a maximum riser height of 7.75 inches, and a minimum tread depth of 10 inches.