OR General Contractor key terms
OR General Contractor · Get comfortable with the vocabulary.
- Oregon Construction Contractors Board (CCB)
- Related: Contractor License, CCB Complaint Process
The state agency that licenses construction contractors, enforces contractor law, handles consumer complaints, and administers the bond, insurance, and dispute-resolution requirements for residential and commercial work in Oregon.
- Contractor License
- Related: Oregon Construction Contractors Board (CCB), Responsible Managing Individual
The credential the CCB issues to a business entity after it meets bonding, insurance, and competency requirements. Working without one on a project that requires a license can void contract rights and trigger civil penalties.
- Responsible Managing Individual (RMI)
- Related: Contractor License, Continuing Education Requirement
The person designated on a CCB license who is accountable for the business's construction work and must meet the training or experience requirements. A licensed business must keep an RMI in place at all times.
- Continuing Education Requirement
- Related: Responsible Managing Individual, License Renewal
A set number of credit hours that licensees must complete during each renewal cycle, covering topics such as business practices, law, and safety, to keep the license active.
- License Renewal
- Related: Continuing Education Requirement, Surety Bond
The periodic process of paying fees and confirming that bond, insurance, and education requirements remain satisfied so a contractor's license does not lapse. Lapsed licenses can be reinstated but may face extra fees or conditions.
- Surety Bond
- Related: General Liability Insurance, CCB Complaint Process
A bond a licensed contractor must maintain that provides a fund consumers can claim against for certain losses caused by the contractor's conduct. It is not liability insurance and does not cover the contractor's own property.
- General Liability Insurance
- Related: Surety Bond, Workers' Compensation Coverage
Coverage protecting a contractor against third-party claims of bodily injury or property damage arising from operations. Oregon requires licensed contractors to carry a minimum amount and keep proof on file with the CCB.
- Workers' Compensation Coverage
- Related: General Liability Insurance, Independent Contractor
Insurance that pays benefits to employees injured on the job. Oregon contractors with employees must carry it, and the CCB checks coverage status because uninsured employees can expose the contractor to liability and license problems.
- Independent Contractor
- Related: Workers' Compensation Coverage, Subcontractor
A worker who controls how the work is performed and is not treated as an employee for tax and coverage purposes. Misclassifying employees as independent contractors can create liability for unpaid premiums and penalties.
- Subcontractor
- Related: Independent Contractor, Mechanics Lien
A separate business hired by a contractor to perform part of the project. The prime contractor generally remains responsible to the owner for the sub's work and should verify the sub's license and insurance.
- CCB Complaint Process
- Related: Surety Bond, Contractor License
The formal route a consumer uses to file a claim against a licensed contractor with the agency, which can investigate, order repairs or compensation, and impose discipline such as fines or license suspension.
- Notice of Procedure
- Related: CCB Complaint Process, Written Contract
A written disclosure a contractor must give a residential customer explaining the right to file a complaint with the CCB and other consumer protections. It typically must be provided before work begins.
- Written Contract
- Related: Notice of Procedure, Right to Cancel
A signed agreement describing the scope, price, schedule, and payment terms of a project. Oregon requires certain residential contracts to be in writing and to include specific disclosures and cancellation rights.
- Right to Cancel
- Related: Written Contract, Home Solicitation Sale
A consumer's legal ability to back out of certain contracts within a set period, such as three business days for some home solicitation sales. The contractor must disclose this right in the contract.
- Home Solicitation Sale
- Related: Right to Cancel, Written Contract
A sale negotiated or concluded at the buyer's home rather than the seller's place of business. Such transactions often trigger special cancellation rights and disclosure duties for contractors.
- Change Order
- Related: Written Contract, Retainage
A written amendment signed by the owner and contractor that modifies scope, price, or schedule after the original contract. Without a signed change order, disputes over extra work become hard to resolve.
- Retainage
- Related: Progress Payment, Substantial Completion
A percentage of progress payments withheld by the owner until the project or a phase is substantially complete. It protects the owner against unfinished or defective work and is often released at final acceptance.
- Progress Payment
- Related: Retainage, Substantial Completion
A periodic payment made for work completed during a billing period, usually based on a schedule of values or percentage of completion. Contractors should document each request and payment in writing.
- Substantial Completion
- Related: Punch List, Retainage
The stage when a project is usable for its intended purpose even though minor items remain. It often triggers warranty periods, retainage release, and the start of the owner's duty to protect the work.
- Punch List
- Related: Substantial Completion, Final Inspection
A written list of minor incomplete or defective items identified near the end of a project. Completing punch-list work is usually a condition of final payment and closing out the job.
- Mechanics Lien
- Related: Lien Notice, Subcontractor
A legal claim against real property filed by a contractor, subcontractor, or supplier who was not paid for labor or materials. Strict deadlines and notice requirements apply, and the lien can lead to foreclosure.
- Lien Notice
- Related: Mechanics Lien, Pre-Lien Notice
A written notice given to the owner or lender that a party may claim a mechanics lien if unpaid. It warns the owner and preserves the claimant's right to file a lien later.
- Pre-Lien Notice
- Related: Lien Notice, Mechanics Lien
An early written warning that a supplier or subcontractor may seek a lien. It gives the owner a chance to protect against double payment and is a prerequisite to enforcing certain lien rights.
- Express Warranty
- Related: Implied Warranty, Written Contract
A written or oral promise about the quality, performance, or durability of work or materials. It becomes part of the contract and can create obligations beyond the minimum implied by law.
- Implied Warranty
- Related: Express Warranty, Substantial Completion
A guarantee implied by law rather than stated in the contract, such as that work will be performed in a workmanlike manner and be fit for its intended use. It exists even if not mentioned.
- Advertising Rules
- Related: Contractor License, CCB Complaint Process
Requirements that contractor advertising and business documents show the correct CCB license number and avoid misleading claims. Violations can be treated as unfair trade practices and lead to discipline.
- Building Code
- Related: Permit, Inspection
The set of adopted regulations governing structural, fire, plumbing, mechanical, and electrical safety for buildings. Oregon enforces a statewide code with local amendments and requires permits for most work.
- Permit
- Related: Building Code, Inspection
Official authorization from a building department to perform specified construction work. It ensures the work is reviewed and inspected and is required for most structural, electrical, plumbing, and mechanical changes.
- Inspection
- Related: Permit, Final Inspection
A review by a building official at defined stages of work to confirm compliance with approved plans and code. Work may need to be uncovered or corrected before the project can proceed.
- Final Inspection
- Related: Inspection, Punch List
The last official review that confirms all permitted work is complete and code-compliant. Passing it allows occupancy or use and is often tied to releasing final payment and closing permits.
- Occupancy Permit
- Related: Final Inspection, Certificate of Occupancy
Approval allowing a building or space to be used for its intended purpose after construction. Issuing it usually depends on passing required inspections and resolving life-safety items.
- Certificate of Occupancy
- Related: Occupancy Permit, Final Inspection
A document issued by the building department confirming a structure complies with code and may be occupied. It is often required before a new or heavily altered building can legally be used.
- Egress
- Related: Fire Separation, Building Code
The means of exiting a building safely, including doors, windows, corridors, and stairs. Code sets minimum widths, clearances, and travel distances to keep occupants safe during emergencies.
- Fire Separation
- Related: Egress, Building Code
A rated wall, floor, or assembly that slows the spread of fire and smoke between areas or units. Ratings are stated in hours and must be maintained without unsealed penetrations.
- Load-Bearing Wall
- Related: Building Code, Permit
A wall that supports weight from above, such as floors or a roof. Removing or altering one without proper design and permits can cause structural failure and code violations.
- Fall Protection
- Related: Personal Protective Equipment, Job Hazard Analysis
Systems and practices that prevent workers from falling from heights, such as guardrails, personal fall arrest, and safe ladder use. Oregon safety rules require protection above specified heights.
- Personal Protective Equipment (PPE)
- Related: Fall Protection, Job Hazard Analysis
Gear such as hard hats, eye protection, gloves, and respirators worn to reduce injury and health risks. Employers must provide required PPE and train workers on its proper use.
- Job Hazard Analysis
- Related: Fall Protection, Personal Protective Equipment
A method of breaking a task into steps to identify hazards and set controls before work begins. It supports safety planning, training, and documentation for high-risk activities.