Crawlspace Water After the Patio Regrade
You are called to a 1990s house on a 0.35-acre lot in Salem after the third winter of water in the crawlspace. The rear yard was regraded during a 2022 patio project and now falls about 4% toward the house for 25 ft. Downspouts from 1,100 sq ft of roof discharge onto splash blocks 8 inches from the foundation. The "topsoil" laid over the compacted excavation is 5 inches of gray clay with visible slickensides. A low corner of the lawn holds water for two days after each storm. A soil test shows pH 6.1, 2.1% organic matter, and a percolation rate near 0.1 in/hr. The homeowner wants you to "add a dry well and some fertilizer."
1. Establish the order in which you would attack this problem and identify the actual cause. Then state the grading standard you would build to.
Read the worked answer
Cause ranking, and why the order is not negotiable:
- Water is being delivered to the house on purpose. A 4% slope over 25 ft moves about 12 inches of fall in the wrong direction, straight at the foundation. No amount of dry well or fertilizer fixes that; it must be reversed first.
- Roof water is concentrated at the wall. 1,100 sq ft of roof on splash blocks 8 inches out is a designed infiltration pit against the foundation.
- The surface layer is the wrong material. Gray clay with slickensides is excavation spoil, not topsoil: it is dense, dispersive, shrinks and swells, and at 0.1 in/hr it accepts almost nothing.
- Only then do you get to plants and fertility. Fertilizing turf on a site that ponds is money into a symptom.
Grading standard to build to: the ground surface must fall a minimum of 6 inches within the first 10 feet away from the foundation, with positive fall continuing away from the structure. On this lot that means a rebuilt swale along the rear wall, daylighted to an approved discharge, not a flat lawn. Also:
- Extend downspouts to discharge at least 5 ft from the foundation, onto splash blocks or into tightline, graded to fall away.
- Keep the finish grade at least 6 inches below any siding or sheathing.
- Check the crawlspace itself: vapor barrier lapped and sealed, no debris, and confirm whether the source is surface water or a rising water table.
Document the existing grade with elevations before you touch it - the report becomes your defense if the homeowner later blames your work for a pre-existing condition.
2. The homeowner wants a dry well for the roof water. Size it and explain whether it will work on this soil.
Read the worked answer
Volume: 1,100 sq ft × 0.623 gal/sq ft per inch of rain = 685 gallons = 91.6 cu ft of water for a 1-inch storm.
In 1½-inch-minus drain rock at roughly 40% void space: 91.6 ÷ 0.40 = 229 cu ft of rock. A 4 ft diameter × 4 ft deep dry well holds about 50 cu ft, so you would need 4–5 of them just for a 1-inch storm, and they would still have to drain out between storms.
Will it drain? Essentially no. At 0.1 in/hr, a pit with, say, 50 sq ft of effective infiltrative surface accepts about 5 cu ft per hour - roughly 37 gallons. Discharging 685 gallons into it means the pit stays full for many days, backs up the roof drain, and saturates the same clay that is already failing. A dry well is a good tool in sandy soil and a bad tool in slickensided clay.
What to install instead:
- Tightline the downspouts to a graded swale or to the municipal storm system if the jurisdiction allows the connection, or to a daylight discharge point on the lot where the water can leave the site.
- If no daylight exists, use a surface swale plus a shallow vegetated conveyance with 2% fall to a low point away from the house, and consider a sump and pump only as a last resort.
- If the client insists on infiltration, get a real percolation test at the proposed location and design to it - do not guess.
Point to make to a client: infiltration is a soil property, not a product. The contractor's job is to test before selling the device.
3. Write the soil and turf specification you would actually install over the regraded area, with quantities.
Read the worked answer
Remove and rebuild, don't amend in place. The 5 inches of spoil clay comes out, not into the soil.
Specification:
- Strip and remove the clay layer to subgrade; do not rototill it into anything. Do not work the subgrade wet - smearing clay at field capacity creates a plow pan that takes years to undo.
- Scarify the subgrade to 2 inches and relieve any compaction from the patio equipment (this is likely the real reason the low corner ponds).
- Place imported topsoil 6–8 inches deep: sandy loam with 5–8% organic matter, pH 6.0–7.0, screened, tested. At 6 inches over 1,000 sq ft = 500 cu ft = 18.5 cu yd loose.
- Compost incorporation if using native soil as a base instead: 2–3 cu yd per 1,000 sq ft tilled into the top 6–8 inches.
- Finish grade to the swale and the 6-inches-in-10-feet fall, then roll lightly, not compact hard. Target bulk density under about 1.4 g/cc at the surface.
- Turf: install sod or seed a tall fescue/perennial ryegrass blend appropriate to western Oregon; tall fescue tolerates the wet-winter/dry-summer pattern better than fine fescue in a lawn that must be walked on.
- Fertility: the soil test (pH 6.1, 2.1% OM) does not call for lime or a rescue fertilizer program. Apply a starter at seeding/sod time and one fall application; fix drainage and organic matter first, then retest in a year.
Warranty language: exclude ponding caused by the swale being blocked or by the client regrading; hand over the finished grade elevations.