OR Landscape Contractor study materials
OR Landscape Contractor study resources

OR Landscape Contractor cheat sheet

OR Landscape Contractor · Keep the key ideas within reach.

Quick reference

Oregon Landscape Contracting Law, ORS Chapter 671, and LCB Rules

  • ORS 671.505–671.695 is the Landscape Contracting statute; the Landscape Contractors Board's administrative rules sit in OAR chapter 808.

  • Landscape contracting means planning, designing, installing, constructing, planting, or maintaining landscape and its appurtenances for another person for compensation.

  • A standard license authorizes the full scope of landscape contracting; a limited license restricts the business to the specific specialty activities named on the license.

  • Licensure is issued to the business, and the business must maintain a qualified responsible individual who has passed the LCB examination.

  • A surety bond and liability insurance must be maintained continuously as a condition of licensure; a lapse is grounds for suspension.

  • The LCB may investigate complaints and impose civil penalties, suspend or revoke a license, or require mediation or arbitration of consumer disputes.

  • Abandoning a contracted job without justification is a violation of ORS 671 independent of any civil breach-of-contract claim.

  • Applying pesticides for hire requires an Oregon Department of Agriculture applicator license in addition to the LCB business license.

  • License renewal requires completion of LCB-approved continuing education within each renewal cycle; failure to complete it blocks renewal.

Quick reference

Plant Selection, Identification, and Installation

  • Match plant to site using USDA hardiness zone (Oregon spans roughly zones 4–9 by region and elevation), light exposure, mature height and spread, water use, and soil drainage.

  • Dig the planting hole 2–3 times the root-ball diameter and only as deep as the root ball, so the root flare sits at or about 1 inch above finished grade.

  • On balled-and-burlapped stock remove twine, burlap, and the wire basket from at least the top half of the ball; on container stock score or cut circling roots.

  • Backfill with the excavated soil and amend the entire planting bed rather than the backfill, avoiding a sharp textural interface between hole and native soil.

  • Apply 2–4 inches of organic mulch over the root zone, keeping mulch 1–2 inches clear of the trunk or crown.

  • In western Oregon, October–November planting lets roots establish before summer drought; cold, high-elevation sites favor spring planting.

  • Identify woody plants by leaf arrangement (alternate, opposite, whorled), leaf type (simple vs. compound), margin, buds, bark, and fruit.

  • Do not specify Oregon-listed noxious weeds or aggressive invaders such as English ivy, Himalayan blackberry, and Japanese knotweed.

  • Water new stock at planting to settle soil, then irrigate deeply and infrequently through the first two growing seasons.

Quick reference

Irrigation Design, Installation, and Water Management

  • Precipitation rate in inches per hour = (96.25 × zone gallons per minute) ÷ irrigated area in square feet.

  • Keep only matched-precipitation heads on a zone; mixing head types with different output lowers distribution uniformity.

  • Design velocity in PVC laterals at or below 5 feet per second (3–4 ft/s preferred) to limit friction loss and water hammer; use thrust blocks at direction changes.

  • Typical operating pressures: spray heads about 30 psi, rotors 45–50 psi, drip 20–30 psi; add pressure regulation when static pressure exceeds design.

  • Backflow protection is required at the potable connection: an RPZ for high hazard and a PVB or DCVA for low hazard, tested annually by a certified tester.

  • Zones should follow hydrozones (sun vs. shade, plant type, soil, slope), not just the geometry of the property.

  • Drip emitters typically run 0.5–2.0 gallons per hour; use pressure-compensating emitters on slopes and long runs.

  • Use cycle-and-soak scheduling on clay soils, plus a rain sensor and seasonal adjustment, to prevent runoff and overwatering.

  • Winterize with compressed air only within pipe pressure ratings (commonly no more than 50 psi at the compressor), blowing one zone at a time.

Quick reference

Business Operations and Financial Management

  • Gross margin % = (revenue − direct job costs) ÷ revenue; markup % = margin ÷ (1 − margin), so a 25% margin equals a 33.3% markup.

  • Break-even revenue = total annual fixed overhead ÷ gross margin percentage.

  • Labor burden = base wage plus payroll taxes, workers' compensation, benefits, and paid leave; typically 25–40% added to the hourly wage.

  • Current ratio = current assets ÷ current liabilities; a ratio below 1.0 signals cash-flow risk.

  • Oregon requires workers' compensation coverage for employees; a sole proprietor with no employees is not required to carry it for themselves.

  • Fully absorbed overhead rate = annual overhead ÷ annual direct labor or revenue dollars; it is applied to every estimate.

  • Bill progressively with deposits and progress payments so cash collected stays ahead of cash spent on payroll and materials.

  • Retainage on Oregon construction contracts is commonly 5% and is released at substantial completion or after the statutory period.

Quick reference

Estimating, Bidding, and Contract Documentation

  • Estimate sequence: quantity takeoff → material and equipment costs → labor hours × burdened rate → subcontractor quotes → overhead and profit.

  • Apply material-specific waste factors (about 5–10% for pavers, 10% for sod, 5% for pipe) plus a contingency for unknowns.

  • Bid price = total direct cost ÷ (1 − overhead % − profit %); dividing by the complement is required because overhead and profit are percentages of price, not cost.

  • A written contract should state parties, scope and specifications, price and payment schedule, start and completion dates, change-order procedure, warranty, and dispute resolution.

  • Change orders must be written, priced, and signed before the changed work proceeds.

  • Oregon's home solicitation rules give a buyer three business days to cancel a contract signed at the buyer's home.

  • Oregon construction liens must be recorded within 75 days after completion of the improvement to preserve lien rights.

  • Read the instructions to bidders, general and special conditions, and every addendum, and acknowledge addenda on the bid form.

  • Unit-price items are paid on measured quantities; lump-sum items are paid on completion milestones.

Quick reference

Soil, Grading, and Drainage

  • Soil texture is named from sand, silt, and clay percentages on the textural triangle; loam is near 40% sand, 40% silt, and 20% clay.

  • A productive soil volume is roughly 50% solids, 25% water, and 25% air; compaction raises bulk density and squeezes out the air-filled pore space.

  • Never till or drive equipment on soil when it is wet - it destroys structure and creates a hardpan layer.

  • Till 2–4 inches of compost into the top 6–8 inches of a planting bed, and base pH and nutrient amendments on a soil test.

  • Most landscape plants prefer pH 6.0–7.0; western Oregon soils are commonly acidic (pH 5.0–6.0) and eastern Oregon soils alkaline.

  • Provide at least 2% surface slope away from structures; 3:1 is the steepest practical mowable slope, with 4:1 preferred.

  • French drain: perforated pipe in washed drain rock, filter fabric separating rock from soil, and a minimum 1% fall to a daylighted outlet.

  • Strip and stockpile topsoil separately from subsoil during cut-and-fill, and balance cut and fill to reduce haul-off.

  • Oregon DEQ's 1200-C construction stormwater permit applies to ground disturbance of 1 acre or more; use silt fence and wattles for perimeter control.

Quick reference

Landscape Construction and Hardscape Installation

  • Paver base: 4 inches of compacted aggregate for pedestrian loads, 6–8 inches for vehicle loads, 1 inch of bedding sand, with base compacted to 95% standard Proctor.

  • Slope paving 1–2% (about 1/8 inch per foot, roughly 1%) away from buildings; ponding indicates inadequate slope or settlement.

  • Install edge restraint on every paver perimeter and fill joints with polymeric or stabilized joint sand.

  • Concrete walks are typically 4 inches thick, driveways 5–6 inches, at about 4,000 psi; control joints at 8–10 feet and isolation joints at fixed objects.

  • Segmental retaining walls bury the first course, batter about 1 inch per foot of height, and use free-draining gravel backfill wrapped in filter fabric with a base drain.

  • Walls with more than 4 feet of exposed height, or with surcharge loads, require engineered design and permits under the Oregon Residential Specialty Code.

  • Steps: 6–7 inch risers and 12–14 inch treads, keeping 2R + T between about 24 and 27 inches, with uniform risers throughout.

  • Compact subgrade and base in 2–4 inch lifts with a plate compactor, and verify compaction before setting units.

  • Provide weep holes and subsurface drainage behind walls and beneath pavers to relieve hydrostatic pressure and limit frost heave.

Quick reference

Turf and Ornamental Maintenance Practices

  • Mow no more than one-third of the blade height per mowing; cool-season lawn height is 2.5–3.5 inches, and 3–4 inches in shade.

  • Nitrogen: about 1 lb N per 1,000 square feet per application, 3–4 lb N per 1,000 square feet per year for cool-season turf.

  • Irrigate deeply and infrequently, about 1–1.5 inches per week including rainfall, to encourage deep rooting.

  • Thatch over about one-half inch calls for core aerification or dethatching; fall (September–October) is the prime renovation window in western Oregon.

  • Overseeding rates: tall fescue or perennial ryegrass 6–8 lb per 1,000 square feet; Kentucky bluegrass 2–3 lb per 1,000 square feet.

  • Remove no more than about 25% of a tree's live canopy in one year, and make pruning cuts at the branch collar without leaving stubs.

  • Keep mower blades sharp; dull blades shred leaf tips, producing gray-white tips and entry points for disease.

  • Base fertilizer, lime, and sulfur rates on a soil test rather than on visual guesswork.

  • Maintain 2–4 inches of mulch in beds and keep it off trunks and crowns to prevent rot and rodent damage.

Quick reference

Integrated Pest Management and Pesticide Safety

  • IPM sequence: identify the pest → monitor and scout → compare to threshold → combine cultural, biological, mechanical, and chemical tactics → evaluate results.

  • The pesticide label is legally binding: site, target pest, rate, timing, PPE, restricted-entry interval, and preharvest interval must all be followed.

  • REI is the restricted-entry interval after application; PHI is the preharvest interval before harvest - both are printed on the label.

  • Rotate mode-of-action groups (IRAC, FRAC, WSSA codes) to delay pesticide resistance.

  • Oregon pesticide applicator licensing is administered by the Oregon Department of Agriculture; applying pesticides for hire requires the appropriate category license.

  • Oregon restricts the four neonicotinoids imidacloprid, clothianidin, thiamethoxam, and dinotefuran on linden and basswood trees because of bee kills.

  • Protect pollinators by not spraying open blossoms, applying when bees are not foraging, and following label pollinator warnings.

  • The Worker Protection Standard requires training, decontamination supplies, and application notification for workers on agricultural establishments such as nurseries.

  • Record every application: date, time, location, product name, EPA registration number, rate, target pest, and applicator.

Quick reference

Job Site Safety and Worker Protection

  • Oregon OSHA administers workplace safety rules in OAR 437, and ORS 654.010 requires employers to furnish a safe workplace.

  • Call 811 (Oregon Utility Notification Center) at least two business days before any excavation and wait for locate marks before digging.

  • Excavations 5 feet or deeper require a protective system, and a ladder must be within 25 feet of workers in the trench.

  • Keep spoil piles, materials, and equipment at least 2 feet back from the excavation edge.

  • Maximum slope allowances: Type A soil 3/4:1, Type B 1:1, Type C 1½:1; a registered professional engineer is needed for alternatives.

  • Fall protection is required at 6 feet in construction - guardrail systems, personal fall arrest, or ladder systems.

  • Hearing protection and a hearing conservation program are required at 85 dBA time-weighted average over 8 hours; use double protection above 100 dBA.

  • Chainsaw PPE: chaps, face shield or safety glasses, hearing protection, and cut-resistant gloves; never cut above shoulder height.

  • Heat illness prevention: water, rest, shade, gradual acclimatization, and a buddy system; confusion or cramping means remove the worker from the heat.

Quick reference

Oregon Landscape Contracting Law, ORS Chapter 671, and LCB Rules

  • The LCB licenses businesses rather than individuals, and each licensed business must keep a qualified responsible individual on record.

  • License status, bond, and insurance can be verified through the LCB's public license lookup before entering a contract.

  • Consumer complaints may proceed to the LCB's mediation or arbitration process in addition to any court action.

  • Oregon's home solicitation rules give a buyer three business days to cancel a contract signed at the buyer's home.

Quick reference

Plant Selection, Identification, and Installation

  • Check hardiness zone, light, mature size, and soil moisture before purchase; a mismatched plant fails regardless of planting quality.

  • Plant the root flare at or slightly above grade and never bury the trunk.

  • Amend the whole bed, not just the backfill, to avoid a perched water table at the hole interface.

  • Mulch 2–4 inches deep, kept clear of the trunk, and water newly installed stock to settle the soil.

Quick reference

Irrigation Design, Installation, and Water Management

  • Precipitation rate = 96.25 × GPM ÷ square feet, giving inches per hour for the zone.

  • Keep matched precipitation heads on a zone and design lateral velocity at or below 5 feet per second.

  • Provide RPZ, PVB, or DCVA backflow protection at the potable connection and test the assembly annually.

  • Schedule by hydrozone with rain sensors, seasonal adjustment, and cycle-and-soak on clay soils.

Quick reference

Business Operations and Financial Management

  • Margin and markup are not the same; convert with markup = margin ÷ (1 − margin).

  • Break-even revenue = fixed overhead ÷ gross margin percentage.

  • Labor burden of 25–40% above base wage must be included in every labor rate.

  • Bill progressively so collections stay ahead of payroll and material spending.

Quick reference

Estimating, Bidding, and Contract Documentation

  • Bid price = direct cost ÷ (1 − overhead % − profit %) rather than direct cost plus percentages.

  • Written change orders signed before work proceeds protect both price and schedule.

  • Oregon construction liens must be recorded within 75 days after completion of the improvement.

  • Read and acknowledge every addendum when submitting a bid.

Quick reference

Soil, Grading, and Drainage

  • Texture comes from the sand-silt-clay triangle; structure and pore space are destroyed by working soil wet.

  • Provide at least 2% slope away from structures; keep mowable slopes at 3:1 or flatter.

  • French drains need washed rock, filter fabric, and at least 1% fall to an outlet.

  • Ground disturbance of 1 acre or more requires an Oregon DEQ 1200-C permit.

Quick reference

Landscape Construction and Hardscape Installation

  • Compacted base is 4 inches for walks and 6–8 inches for drives, with 1 inch of bedding sand.

  • Slope paving 1–2% away from buildings and install edge restraint on all perimeters.

  • Retaining walls batter about 1 inch per foot and drain through gravel backfill, filter fabric, and a base drain.

  • Exposed wall height over 4 feet requires engineered design and permits.

Quick reference

Turf and Ornamental Maintenance Practices

  • Follow the one-third rule when mowing and keep cool-season turf at 2.5–3.5 inches.

  • Apply about 1 lb N per 1,000 square feet per application, 3–4 lb per year on cool-season lawns.

  • Aerate or dethatch when thatch exceeds one-half inch, preferably in early fall.

  • Base fertilizer and pH correction on a soil test.

Quick reference

Integrated Pest Management and Pesticide Safety

  • Treat only when monitoring shows the pest has reached the action threshold.

  • The label governs site, rate, PPE, REI, and PHI, and is legally enforceable.

  • Rotate IRAC, FRAC, and WSSA mode-of-action groups to slow resistance.

  • Oregon applicator licensing runs through the Oregon Department of Agriculture, and application records are required.

Quick reference

Job Site Safety and Worker Protection

  • Call 811 at least two business days before digging and wait for locates.

  • Trenches 5 feet or deeper need a protective system, with a ladder within 25 feet.

  • Fall protection is required at 6 feet in construction work.

  • Hearing protection is required at 85 dBA TWA over eight hours.