OR Water/Wastewater Operator study materials
OR Water/Wastewater Operator study resources

OR Water/Wastewater Operator study plan

OR Water/Wastewater Operator · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Water Treatment Processes (coagulation, flocculation, sedimentation, filtration, softening)

  • Sketch the coagulation–flocculation–sedimentation train and label where each chemical (primary coagulant, polymer, pH adjuster) is dosed and why

  • Explain rapid mix versus flocculation mixing intensity (velocity gradient G and the Gt product) and state typical design ranges from memory

  • Calculate coagulant dose from a jar test in mg/L, then convert it to lb/day and lb/MG using the 8.34 conversion factor

  • Compute detention time, surface overflow rate, and weir loading for a rectangular sedimentation basin from given dimensions and flow

  • Judge a four-jar test with varied coagulant doses and pick the optimum dose and pH, justifying the choice with settled turbidity and floc size

Your checkpoint

A two-page worked problem set: 12 calculations (dose, lb/day, detention time, overflow rate, weir loading) with units carried through, plus a written interpretation of a jar-test table, self-scored at 80% or better

Week 2

Water Treatment Processes (coagulation, flocculation, sedimentation, filtration, softening)

  • Compare rapid sand, dual-media, and low-pressure membrane filtration in a table by loading rate, backwash method, and achievable effluent turbidity

  • Sequence the backwash steps and state the three criteria that trigger a backwash (headloss, effluent turbidity, run time)

  • Compute filter loading rate, backwash rate, and percent bed expansion from given media depth, porosity, and flow

  • Work lime-soda ash softening stoichiometry to calculate lime and soda ash doses from a raw-water hardness and alkalinity analysis

  • Explain how filtered-water turbidity affects disinfection credit and state the regulatory turbidity limits for filtered systems

Your checkpoint

A filtration and softening study sheet containing a one-page comparison table plus 10 solved problems (loading rate, backwash rate, bed expansion, lime and soda ash dose), all answers checked against worked solutions

Week 3

Wastewater Treatment Processes (primary, secondary, biological nutrient removal, solids handling)

  • Trace raw wastewater through headworks, grit removal, primary clarifier, aeration basin, and secondary clarifier, stating the purpose and typical percent removal at each step

  • Calculate BOD and suspended solids removal efficiency, F/M ratio, MCRT (SRT), and RAS/WAS flow rates from a given set of plant operating data

  • Distinguish activated sludge variants (conventional, extended aeration, SBR, MBBR, trickling filter) by loading, aeration strategy, and typical SRT

  • Diagnose sludge bulking by calculating SVI and listing at least three corrective operational actions

  • State the purpose and key operating controls of primary and secondary clarifiers, including return rates and sludge blanket measurement

Your checkpoint

A labeled plant walkthrough flowchart plus 12 solved biological process calculations (F/M, MCRT, SVI, RAS/WAS, removal efficiency) with at least 80% correct on first attempt

Week 4

Wastewater Treatment Processes (primary, secondary, biological nutrient removal, solids handling)

  • Diagram the nitrification and denitrification pathways and identify the dissolved oxygen, SRT, carbon, and alkalinity conditions each requires

  • Explain biological phosphorus removal through anaerobic/aerobic cycling and contrast it with chemical phosphorus removal options

  • Calculate daily solids production, sludge volume, and percent solids, and size a gravity thickener from given solids loading data

  • Sequence thickening, dewatering (belt press, centrifuge, drying beds), and digestion, stating the key operating controls for an anaerobic digester

  • Judge digester stability by interpreting volatile solids destruction, pH, alkalinity, and VFA-to-alkalinity ratio

Your checkpoint

A BNR plus solids handling summary sheet with a labeled BNR flow diagram and 10 solved problems (SRT, solids production, percent solids, thickener sizing, VS destruction), reviewed and corrected to 100% accuracy

Week 5

Drinking Water Distribution Systems and Storage & Wastewater Collection Systems and Pumping

  • Size distribution storage and estimate the equalization volume needed from a given diurnal demand curve and fire flow requirement

  • Calculate headloss and pressure using the Hazen-Williams equation and list at least four causes of low-pressure complaints

  • Explain cross-connection control, select appropriate backflow prevention devices for given situations, and describe a routine cross-connection survey

  • Compute collection system slope, velocity, and capacity for partially full pipes using Manning's equation

  • Calculate wet well volume, pump cycling time, and pump brake horsepower and total dynamic head from given pump and system data

  • Identify inflow and infiltration sources and describe smoke testing and CCTV inspection as diagnostic tools

Your checkpoint

A distribution and collection calculation packet with 12 solved problems (Manning slope and velocity, Hazen-Williams headloss, pump head and horsepower, wet well cycle time, storage sizing) plus a one-page cross-connection control checklist

Week 6

Source Water Characteristics and Water Quality & Laboratory Analysis, Sampling, and Process Control Calculations

  • Classify groundwater versus surface water sources by turbidity, hardness, alkalinity, and contamination susceptibility, and match each to an appropriate treatment train

  • Interpret a complete water quality analysis by calculating total hardness, carbonate and noncarbonate hardness, and alkalinity relationships

  • Identify priority contaminants (nitrate, arsenic, lead, fluoride, TTHM) with their MCLs and the treatment process used to remove each

  • Describe proper sampling technique, chain of custody, preservation, and holding times for chlorine, turbidity, BOD, and coliform samples

  • Calculate chlorine demand, applied dose, and residual, and convert between mg/L, lb/day, and MGD

  • Compute the geometric mean for coliform compliance and describe the required response to a positive result

Your checkpoint

A laboratory reference card (holding times, preservation, methods, compliance calculations) plus 15 solved process control problems covering dose, demand, residual, MGD conversions, and geometric mean, scored at 80% or better

Week 7

Disinfection, Residuals, and Disinfection Byproducts & Safety, Equipment Maintenance, and Regulatory Compliance

  • Compare free chlorine, chloramine, ozone, and UV by CT concept, residual persistence, and disinfection byproduct formation potential

  • Calculate the CT actually achieved and compare it to the required CT for a given target organism, pH, temperature, and residual

  • Identify the drivers of TTHM and HAA5 formation and list operational changes that reduce them, including precursor removal and alternate primary disinfectants

  • Explain DBP compliance sampling locations and how the locational running annual average is calculated

  • List the required steps of a permit-required confined space entry and identify the conditions that make a space permit-required

  • Apply lockout/tagout and describe the response to a chlorine gas leak, including PPE selection and evacuation decisions

  • Match key rules (Stage 2 DBPR, LT2, Revised Total Coliform Rule, NPDES reporting) to their core requirements and deadlines

  • Build a preventive maintenance schedule for pumps, blowers, and clarifiers that lists task frequency and trigger conditions

Your checkpoint

A CT calculation worksheet with 8 solved problems and a one-page safety and regulatory compliance checklist covering confined space, lockout/tagout, chemical handling, and DBP rule reporting

Week 8

Source Water Characteristics and Water Quality & Water Treatment Processes (coagulation, flocculation, sedimentation, filtration, softening) & Drinking Water Distribution Systems and Storage & Wastewater Collection Systems and Pumping & Wastewater Treatment Processes (primary, secondary, biological nutrient removal, solids handling) & Disinfection, Residuals, and Disinfection Byproducts & Laboratory Analysis, Sampling, and Process Control Calculations & Safety, Equipment Maintenance, and Regulatory Compliance

  • Assemble and complete a timed 100-question cumulative self-assessment spanning all eight domains

  • Log every missed item by domain and root cause (knowledge gap, misread, unit error) and re-work each one to a correct final answer

  • Condense all key equations into a single one-page formula sheet written from memory, then verify each against source notes

  • Re-drill the two lowest-scoring domains with 30 additional self-written problems each

  • Rehearse unit-factor conversions (mg/L to lb/day, MGD to cfs, psi to feet of head) until each is completed in under 30 seconds

Your checkpoint

A completed timed 100-question self-assessment scored at 80% or higher overall, with a written error log and a verified one-page formula sheet

Milestones

Week 2: Score 80% or better on a 30-question self-written quiz covering all of Domain 2 (coagulation through softening) and re-teach any sub-topic missed more than once

Week 4: Complete a 50-question half-length practice set drawn from Domains 2 and 5 and score at least 75%, with every missed item reworked and documented

Week 6: Complete 25 mixed calculation problems from Domains 1, 3, 4, and 7 with 90% accuracy and no uncorrected unit errors

Week 8: Score 80% or higher on the full timed 100-question cumulative self-assessment, with no single domain below 70%