A crew is setting a 3,000-lb rooftop HVAC unit with a 40-ton hydraulic truck crane. The unit is slung with a two-leg nylon bridle; the west leg has a 2-inch abrasion cut through the outer cover, and the hook has a bent, non-functioning safety latch. The rigging was pulled from the gang box this morning and no one inspected it. The unit lands on a warehouse roof 24 ft up; two roofers are on the roof edge holding a single tag line, standing in the fall zone. The signal person is a laborer who has never been evaluated; he stands behind the crane's counterweight near a stack of decking. The outrigger pads sit on ¾-inch plywood over a backfilled utility trench. The load chart at the planned 45-ft radius and 60-ft boom allows 6,400 lb.

1. What in this setup would you stop before the lift, and how do you rank the problems?

Read the worked answer

Stop the lift. Every item here is a struck-by or crush hazard, and several compound.

  1. People in the fall zone. The two roofers on the edge are holding a tag line while standing directly where the load would travel if the sling failed. No one may be under a suspended load. This is the most immediate life threat, and it is also a fall hazard - a 24-ft edge with no fall protection mentioned.
  2. The sling. A 2-inch cut through the cover on a nylon bridle plus a hook that cannot latch. A sling showing evidence of damage must be removed from service, and hooks must have a functioning latch. With a two-leg bridle, a leg failure transfers the whole 3,000 lb to the remaining leg and rotates the load unpredictably.
  3. Ground conditions. Outrigger pads on ¾-inch plywood over a backfilled trench is the slow-motion version of the same event: the trench backfill consolidates under load, the outrigger sinks, the crane tips, and the load goes somewhere no one planned.
  4. The signal person. Unqualified, positioned behind the counterweight - blind to the load and to the boom tip.

Rank by time-to-consequence: people under the load first (seconds), rigging second (seconds to minutes), ground conditions third (minutes), signaling fourth (it enables all the others).

2. Evaluate the rigging and the signal arrangement against OSHA requirements.

Read the worked answer

Rigging:

  • Rigging and attachments must be inspected before use, and defective gear must be removed from service and destroyed or tagged so it does not come back through the gang box.
  • A sling with a cut through the cover, or any evidence of heat damage, abrasion, or broken stitching, is out.
  • Hooks must have a working safety latch; a bent latch is a hook out of service, not a hook to straighten.
  • The lift should be planned and rigged by a qualified rigger, with the bridle legs sized for the load and the included angle - as the legs spread beyond 90°, the tension in each leg climbs sharply above half the load, and a wide bridle is how a 3,000-lb load overloads a sling rated for 6,000 lb.
  • The 6,400-lb chart capacity at 45 ft is not an automatic pass: verify the actual radius, add the weight of the rigging and any below-the-hook device, and confirm the configuration on the chart for the boom length and counterweight in use. Capacity falls steeply with radius, and small errors in radius are large errors in capacity.

Signaling:

  • The signal person must be qualified - trained and evaluated on the signals used and on the crane's operating characteristics.
  • He must be positioned to see the load, the boom tip, and the operator, and be in continuous communication (hand signals plus radio is the normal setup).
  • One person gives signals; anyone may give a stop signal.
  • Behind the counterweight is the worst seat on the site: blind to the load, standing near the swing path and a stack of decking that limits escape.

3. What does the trench under the outrigger have to do with struck-by risk, and what must be done before the crane is set up?

Read the worked answer

It is the same injury by a different route. A crane tipping is a struck-by event with a 40-ton object. The load chart's 6,400 lb is only valid when the machine is level, on a supporting surface that can take the outrigger reaction, which is far higher than the load - often many times the outrigger's share of the lifted weight because of the moment of the boom.

Backfill over a utility trench fails two ways: it settles under sustained load, which tips the crane slowly while the boom is extended; or the trench wall or a soft spot gives locally, and one pad drops, which turns a level machine into a tipping machine in one motion.

Before setup:

  • Evaluate the ground and the trench location - a competent person or engineer, with the trench's depth, backfill material, and compaction known, not assumed.
  • Provide a firm, drained, graded surface for assembly and operation; the controlling entity has a role in ensuring ground conditions.
  • Use properly sized mats or crane pads designed for the actual bearing pressure, spread the load, and locate all four outriggers fully extended on ground that is not over the trench or within its zone of influence.
  • Re-level and re-check after the pads load up, and monitor for settling during the lift.
  • Keep a level indicator in view; if the bubble moves, stop.

The judgment point: the load chart number is the answer to a question nobody has asked yet. The question is whether the ground can hold the outrigger - and ¾-inch plywood is a cushion, not a foundation.