OSHA 510 study plan
OSHA 510 · Give each week a clear focus.
8 weeks · About 6 hours per week
OSHA Act, General Industry vs. Construction standards, and 29 CFR 1926 Subpart C (General Safety and Health Provisions) & Safety and Health Program concepts, hazard identification and control, and recordkeeping/injury reporting
Map the structure of 29 CFR 1926 by Subpart and state which Subparts fall inside each of the 11 exam domains
Distinguish employer duties under Section 5(a)(1) general duty clause from specific standard violations, and explain the multi-employer citation policy (controlling, exposing, correcting, creating employers)
Compare General Industry 29 CFR 1910 and Construction 29 CFR 1926 coverage triggers, and apply 1910.12(a) to decide which part governs a mixed operation
Walk through 1926 Subpart C requirements: safety and health program elements in 1926.20(b), competent person designations, and 1926.21 training obligations
Explain the 11(c) anti-retaliation framework, inspection and citation process, and the 8-hour fatality / 24-hour hospitalization reporting rule in 1904.39
Your checkpoint
One-page jurisdiction decision tree plus a 20-row Subpart-to-domain mapping table, self-quizzed to 90% accuracy
29 CFR 1926 Subpart M: Fall Protection & 29 CFR 1926 Subpart L: Scaffolds
Apply 1926.501(b) duty-to-have-fall-protection triggers at 6 ft, 10 ft, 15 ft, and 50 ft for each walking-working surface type
Select and justify the conventional fall protection system (guardrail, safety net, personal fall arrest, positioning device, warning line, controlled access zone) permitted by each 1926.502 provision
Calculate total fall distance and required clearance for a personal fall arrest system, including lanyard length, deceleration distance, harness stretch, and a safety margin above the lower level
Identify the 1926.502(d) hardware and component criteria: anchorage strength, self-locking snap hooks, D-ring placement, and prompt rescue requirements
Classify scaffolds under 1926 Subpart L and state the capacity, planking, and access requirements for each type
State the 1926.451(g) fall protection threshold and the 1926.451(f) competent person inspection and tagging rules for scaffolds
Your checkpoint
Completed fall-distance worksheet for six scenarios plus a scaffold type comparison table, both scored against the standard text
29 CFR 1926 Subpart P: Excavations & 29 CFR 1926 Subparts N–O: Cranes, Derricks, Hoists, Elevators and Conveyors; Motor Vehicles, Mechanized Equipment and Marine Operations
Classify soil by 1926 Subpart P Appendix A and select the correct protective system (sloping, benching, shoring, shield) for each soil type and depth
Determine when a protective system is required under 1926.652(a) and when the 5 ft shallow-excavation exemption applies
Apply the 1926.651 access/egress, spoil pile, surface encumbrance, water accumulation, and atmospheric testing rules
Describe the competent person's daily inspection duties and the 1926.651(c) and (k) requirements for support systems and hazardous atmospheres
State crane operator qualification and certification requirements under 1926.1427 and the 1926.1412 inspection tiers (shift, monthly, annual, post-assembly)
Explain 1926.1417 operation rules, power line safety under 1926.1408, and the signal person and rigger qualification requirements
Your checkpoint
Excavation protection decision matrix plus a 15-question self-test on crane and excavation requirements, with written corrections for every miss
29 CFR 1926 Subparts I–K: Tools - Hand and Power; Welding and Cutting; Electrical & 29 CFR 1926 Subpart Z: Toxic and Hazardous Substances, including Hazard Communication and Silica
Apply 1926 Subpart I guarding requirements: point of operation, nip points, rotating parts, and the 1926.300(b) requirements for portable circular saws and abrasive wheel guards
State the 1926.302 and 1926.304 rules for pneumatic and powder-actuated tools, including operator certification and loading procedures
Explain 1926 Subpart J welding requirements: fire watch triggers, hot work permits, ventilation, cylinder storage, and the 1926.353 confined space provisions
Apply 1926 Subpart K electrical rules: assured equipment grounding conductor program, GFCI requirements, temporary wiring, and lockout/tagout under 1926.417
Identify respirable crystalline silica triggers under 1926.1153 and select the correct Table 1 engineering control for common construction tasks
Explain the 1926.1153 exposure assessment, medical surveillance, and written exposure control plan obligations, and describe the Hazard Communication 1926.1200 written program and SDS access rules
Your checkpoint
Silica Table 1 task-to-control lookup sheet for ten common tasks plus a 25-question mixed practice set at 80% or better
29 CFR 1926 Subparts D–F: Occupational Health and Environmental Controls, Personal Protective and Life Saving Equipment, Fire Protection and Prevention & 29 CFR 1926 Subparts G–H: Signs, Signals and Barricades; Materials Handling, Storage, Use and Disposal
Apply 1926 Subpart D occupational health rules: 1926.52 noise exposure limits, hearing conservation triggers, and 1926.55 air contaminant limits
State 1926 Subpart E PPE selection, training, and hazard assessment obligations under 1926.95 and 1926.102 eye/face protection criteria
Explain 1926 Subpart F fire protection requirements: fire extinguisher ratings and travel distance, 1926.150(c) portable extinguisher rules, and 1926.151 fire prevention plan elements
Apply 1926 Subpart G requirements for traffic control in work zones, flagger qualifications under 1926.201, and barricade/sign standards
State 1926 Subpart H material storage, stacking, and access rules, including 1926.250(b) stacking limits and 1926.252 disposal requirements
Explain rigging and material handling equipment inspection duties and the 1926.251 sling capacity and inspection criteria
Your checkpoint
Two-page compliance checklist covering PPE, fire extinguisher placement, and material storage, applied to a hypothetical site description
29 CFR 1926 Subparts Q–X: Concrete and Masonry, Steel Erection, Underground Construction, Demolition, Blasting, Power Transmission, Rollover Protective Structures, and Stairways and Ladders & OSHA Act, General Industry vs. Construction standards, and 29 CFR 1926 Subpart C (General Safety and Health Provisions)
Apply 1926 Subpart M stairway and 1926 Subpart X ladder requirements: 1926.1053 ladder use rules, 1926.1052 stairway requirements, and 1926.1060 training obligations
State 1926 Subpart Q concrete and masonry requirements for formwork, shoring, and the 1926.702 power concrete placement rules
Explain 1926 Subpart R steel erection requirements: controlled decking zone limits, 1926.760 fall protection triggers, and connector requirements
Describe 1926 Subpart S underground construction, Subpart T demolition, Subpart U blasting, Subpart V power transmission, and Subpart W rollover protective structure key requirements at a recognition level
Re-verify the Subpart C competent person and training obligations against the Subparts studied in weeks 2 through 6
Your checkpoint
Ladder and stairway inspection card set plus a full-length 60-question timed practice exam at 75% or better
Safety and Health Program concepts, hazard identification and control, and recordkeeping/injury reporting & 29 CFR 1926 Subpart Z: Toxic and Hazardous Substances, including Hazard Communication and Silica
Build a safety and health program outline using the seven core elements: management leadership, worker participation, hazard identification and assessment, hazard prevention and control, education and training, evaluation and improvement, and coordination with contractors
Apply the hierarchy of controls to five construction hazards and rank controls by effectiveness
Explain 29 CFR 1904 recordkeeping: recordability criteria, the partially exempt list, 300/300A/301 forms, and posting deadlines
State the 1904.39 reporting timelines and the 1904.35 employee involvement and anti-retaliation provisions
Revisit silica and HazCom requirements and connect them to the written program and training documentation you would audit on site
Your checkpoint
Draft site safety and health program outline with a completed sample OSHA 300 log entry set and a recordability decision log for ten cases
OSHA Act, General Industry vs. Construction standards, and 29 CFR 1926 Subpart C (General Safety and Health Provisions) & Safety and Health Program concepts, hazard identification and control, and recordkeeping/injury reporting & 29 CFR 1926 Subpart M: Fall Protection & 29 CFR 1926 Subpart P: Excavations & 29 CFR 1926 Subpart Z: Toxic and Hazardous Substances, including Hazard Communication and Silica
Re-run all domain self-quizzes and log every missed item by domain to identify the three weakest areas
Re-study the weakest three areas using the standard text and rewrite the governing rule in your own words for each miss
Complete two full-length timed practice exams under exam conditions and compare scores to the week 6 baseline
Recite from memory the key numeric thresholds across all domains: fall heights, excavation depths, silica action level and PEL, noise limits, and reporting timelines
Assemble a one-page personal quick-reference sheet limited to numbers and decision triggers
Your checkpoint
Final practice exam score of 85% or better plus a completed one-page numeric quick-reference sheet and a written remediation log
Milestones
Week 2: Score 80% or better on a 20-question fall protection and scaffold self-quiz, and correctly calculate total fall distance and clearance for all six worksheet scenarios
Week 4: Score 80% or better on the 25-question mixed tools, welding, electrical, and silica set, and correctly match all ten silica tasks to their Table 1 control
Week 6: Score 75% or better on the 60-question timed practice exam, with no single domain below 60%
Week 8: Score 85% or better on the final full-length practice exam, with every domain at or above 75% and the numeric quick-reference sheet complete