PE Water Resources study materials
PE Water Resources study resources

PE Water Resources cheat sheet

PE Water Resources · Keep the key ideas within reach.

Quick reference

Hydraulics and Hydrology

  • Manning equation: Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units (constant = 1.0 in SI); R = A/P, and n ≈ 0.013 for new concrete pipe, 0.024–0.035 for natural channels.

  • Energy equation between sections: p1/γ + z1 + V1²/2g = p2/γ + z2 + V2²/2g + hL, with hL = f (L/D)(V²/2g) + ΣK(V²/2g) for friction plus minor losses.

  • Hazen-Williams (water, US units): V = 1.318 C R^0.63 S^0.54; C ≈ 130–140 for new cement-lined or PVC pipe, dropping to near 100 for old unlined steel.

  • Rational method: Q = CiA, with rainfall intensity i taken from the IDF curve at a duration equal to the time of concentration; limited to small watersheds (roughly under 200 acres).

  • NRCS runoff depth: Q = (P − 0.2S)²/(P + 0.8S) with S = 1000/CN − 10 inches; composite CN is area-weighted and increases with urbanization and poorer hydrologic soil group.

  • Froude number Fr = V/√(gD): Fr = 1 is critical flow at minimum specific energy, Fr < 1 subcritical (tranquil), Fr > 1 supercritical; a hydraulic jump passes from supercritical to subcritical.

  • Structure flow: sharp-crested rectangular weir Q = 3.33 L H^1.5 (cfs); submerged orifice Q = C A √(2gΔh) with C ≈ 0.6–0.65.

  • Frequency: annual exceedance probability p = 1/T; probability of at least one event in n years = 1 − (1 − 1/T)^n, so a 100-yr event has a 1% chance every year.

  • Unit hydrograph assumptions: linearity (scale by runoff depth), time invariance, and uniform rainfall distribution; the SCS synthetic UH peaks near D/2 + 0.6Tc.

Quick reference

Water and Wastewater Engineering

  • BOD progression: BOD5 = UBOD(1 − e^(−k·5)); with k ≈ 0.23/day at 20 °C, BOD5 ≈ 0.68 UBOD, and k is temperature-corrected by θ^(T−20) with θ ≈ 1.047.

  • Activated sludge SRT θc = (V·MLSS)/(Qw·Xr + Qe·Xe); conventional design 5–15 days, extended aeration 20+ days, and nitrification requires SRT above the nitrifier minimum at the coldest month.

  • F/M = Q·S0/(V·X); low ratios (0.05–0.15) give long SRT, low sludge production, and nitrification, while high ratios risk poor settling and high effluent BOD.

  • Clarifier sizing checks both surface overflow rate (primary 600–1200 gpd/ft², secondary 400–800 gpd/ft²) and solids loading rate (Q + Qr)·MLSS/A.

  • Sludge volume index SVI = (30-min settled volume, mL/L × 1000)/MLSS mg/L; roughly 80–150 mL/g settles well, and above about 200 mL/g indicates filamentous bulking.

  • Disinfection CT = residual concentration (mg/L) × contact time (min); required CT rises with target log inactivation and pH (for free chlorine) and falls as temperature rises.

  • Conventional surface water train: coagulation (alum or ferric, optimum pH about 5–7), flocculation (G ≈ 20–70 s⁻¹), sedimentation (0.5–1.0 gpm/ft²), filtration (4–8 gpm/ft²), disinfection.

  • Langelier saturation index LSI = pH − pHs, with pHs derived from calcium hardness, total alkalinity, temperature, and TDS; positive is scale-forming, negative is corrosive.

  • Typical secondary effluent limits are 30 mg/L BOD5 and 30 mg/L TSS (10/10 for advanced treatment); compliance also requires disinfection CT and a maintained residual in distribution.

Quick reference

Water Resources Analysis and Design

  • Rippl mass curve: plot cumulative inflow versus time; storage required for a constant demand equals the maximum vertical gap between the demand line and the mass curve over the critical drawdown period.

  • Storage–yield behavior is nonlinear: each additional unit of firm yield needs progressively more storage until the reservoir becomes inflow-limited.

  • Log-Pearson Type III flood frequency: fit mean, standard deviation, and skew of log10 annual peak flows (Bulletin 17C practice), with regional skew and low-outlier screening.

  • Darcy's law Q = KIA; transmissivity T = Kb; confined storativity is roughly 0.00005–0.005 while unconfined specific yield is typically 0.10–0.30.

  • Theis solution: s = Q·W(u)/(4πT) with u = r²S/(4Tt); the Cooper-Jacob straight-line approximation applies when u < 0.01.

  • Dam freeboard = wave runup + wind setup + settlement allowance + safety margin, measured from the spillway design pool for normal freeboard and from the PMF pool for minimum freeboard on high-hazard dams.

  • Economic comparison discounts all benefits and costs to present worth at the project rate; B/C ≥ 1.0 is required, and the analysis period is normally the project economic life.

  • Reservoir sedimentation: trap efficiency increases with the capacity-to-annual-inflow ratio (Brune curve), and reservoir life ≈ capacity / (annual sediment inflow × trap efficiency).

  • Level-pool flood routing uses the storage-indication relation (2S/Δt + O) plotted against outflow O; high-hazard dams are typically sized for the probable maximum flood.

Quick reference

Project and Construction Management

  • The critical path is the longest path through the network; it fixes project duration and every activity on it has zero total float.

  • Total float = LS − ES = LF − EF; free float = ES of the successor − EF of the activity; float belongs to the path, not to an individual activity.

  • PERT expected duration = (O + 4M + P)/6 with variance ((P − O)/6)²; CPM uses single deterministic durations, PERT uses three-point estimates.

  • Earned value: CV = EV − AC, SV = EV − PV, CPI = EV/AC, SPI = EV/PV; CPI < 1 is over budget, SPI < 1 is behind schedule, and EAC ≈ BAC/CPI when variance is typical.

  • Contract risk allocation: lump sum puts quantity risk on the contractor, unit price puts it on the owner, and cost-plus puts most cost risk on the owner.

  • Schedule compression: crashing adds resources and cost to critical activities; fast-tracking overlaps design and construction and raises coordination risk.

  • Delay classification: excusable-compensable (owner-caused, differing site conditions), excusable-noncompensable (severe weather, force majeure), and non-excusable (contractor-caused); only compensable delay earns time and money.

  • Substantial completion makes the work usable for its purpose, starts the warranty, and stops liquidated damages; final completion releases retainage per contract terms.

  • OSHA 29 CFR 1926 requires a competent person for excavations, cave-in protection at 5 ft depth, and hazard communication for site chemicals.