PE Water Resources flashcards
PE Water Resources · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Manning's equation
- Equation for steady uniform open-channel flow: Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units, where R is hydraulic radius (area divided by wetted perimeter).
- Rational method
- Peak runoff formula Q = CiA for small watersheds, typically under 200 acres; C is a runoff coefficient, i the rainfall intensity for the time of concentration, and A the area.
- Time of concentration
- Travel time for runoff from the hydraulically most remote point to the outlet; it sets the storm duration whose rainfall intensity is used in the rational method.
- Curve number method
- NRCS method for direct runoff depth: Q = (P − 0.2S)²/(P + 0.8S) with S = 1000/CN − 10 inches; CN depends on hydrologic soil group, cover, and antecedent moisture.
- Unit hydrograph
- Direct runoff hydrograph produced by one inch of rainfall over a specified duration; it assumes linearity, so larger storms are modeled by scaling and lagging it.
- Froude number
- Dimensionless ratio Fr = V/√(gD) classifying open-channel flow: below 1 is subcritical, 1 is critical, and above 1 is supercritical, where standing waves can form.
- Hardy Cross method
- Iterative procedure for pipe networks that repeatedly corrects assumed loop flows by ΔQ = ΣhL/(n Σ|hL/Q|) until head losses around every loop sum to zero.
- Muskingum routing
- Flood routing method using storage S = K[XI + (1 − X)Q], where K approximates flood wave travel time and X, usually 0 to 0.5, weights inflow versus outflow.
- Five-day BOD
- Oxygen consumed by microbes degrading organic matter in five days at 20 °C; with k = 0.23 per day it equals about 68 percent of ultimate carbonaceous BOD.
- Solids retention time
- Mass of solids in the aeration basin divided by the mass wasted plus lost in effluent each day; it governs sludge age, effluent quality, and nitrification.
- Food-to-microorganism ratio
- Daily BOD or COD mass entering the aeration tank divided by the MLVSS mass in the tank; low ratios mean long sludge age and extended aeration.
- Surface overflow rate
- Clarifier flow divided by surface area, expressed in gallons per day per square foot; it must stay below the settling velocity of the design floc.
- CT value
- Disinfectant residual concentration multiplied by contact time; the required CT increases with target log inactivation and pH and decreases as water temperature rises.
- Langelier saturation index
- LSI = pH − pHs computed from calcium hardness, alkalinity, temperature, and dissolved solids; positive values scale, negative values corrode, and near zero is balanced.
- Sludge volume index
- Settled sludge volume in milliliters per liter after 30 minutes, times 1000, divided by MLSS in mg/L; values near 100 indicate good settling, above 200 bulking.
- Chlorine demand
- Difference between the chlorine dose applied and the residual remaining after a contact period; it is exerted by reducing agents, organics, and ammonia.
- Mass curve
- Plot of cumulative reservoir inflow against time; the storage needed for a given constant demand equals the maximum vertical gap between the demand line and the curve.
- Log-Pearson Type III
- Standard US flood-frequency model that fits the base-10 logarithms of annual peak flows to a three-parameter skewed distribution to estimate design floods.
- Darcy's law
- Groundwater flow equation Q = KIA, where discharge is proportional to hydraulic conductivity, cross-sectional area, and hydraulic gradient; valid for laminar flow in porous media.
- Theis equation
- Transient well solution, s = Q W(u)/(4πT) with u = r²S/(4Tt), used to derive aquifer transmissivity and storativity from pumping-test drawdown data.
- Return period
- Average interval between events of a given magnitude; the annual exceedance probability is 1/T, so a 100-year flood has a 1 percent chance each year.
- Freeboard
- Vertical distance between a design water surface and the top of a dam or levee; it covers wave runup, wind setup, settlement, and a safety margin.
- Benefit-cost ratio
- Present worth of project benefits divided by present worth of project costs, both discounted at the same rate; a ratio at or above 1.0 justifies construction.
- Probable maximum flood
- Flood resulting from probable maximum precipitation; it is the design spillway event for high-hazard dams whose failure would endanger lives downstream.
- Critical path
- Longest continuous chain of dependent activities through the network; it sets the shortest possible project duration and its activities carry zero total float.
- Total float
- Time an activity can slip without delaying project completion; computed as late start minus early start, or late finish minus early finish.
- Cost performance index
- Earned value divided by actual cost; a value below 1.0 means work is costing more than planned, and budget divided by CPI estimates final cost.
- Schedule performance index
- Earned value divided by planned value; a value below 1.0 indicates less work completed than scheduled, and it predicts duration overrun at completion.
- Liquidated damages
- Predetermined dollar amount per day of delay deducted from payment when the contractor finishes after the contract date; it must be a reasonable forecast, not a penalty.
- Substantial completion
- Stage at which the work is usable for its intended purpose although minor punch-list items remain; it typically starts the warranty and stops liquidated damages.
- Crashing
- Compressing the schedule by adding labor, equipment, or overtime to critical-path activities, accepting higher direct cost in exchange for shorter duration.
- Change order
- Written modification signed by the owner that changes contract scope, price, or time after award; it establishes the basis for an equitable adjustment.