PEI Class 7 Test study plan
PEI Class 7 Test · Give each week a clear focus.
8 weeks · About 6 hours per week
Safety and Environmental Regulations & Liquid and Vapor Piping Systems
Map each PEI RP100/RP200 recommended practice section to the corresponding Class 7 topic, writing a one-line summary of what each section requires
Define spill, overfill, and release in your own words and list the field conditions that distinguish each on a fueling site
Trace a liquid product path from delivery point through piping to tank and back out to dispenser, labeling every component and its secondary containment layer
List the federal and state regulatory categories (SPCC, UST, stormwater, air) that apply to a Class 7 installer and note which agency enforces each
Your checkpoint
A two-page annotated flow diagram of a complete fueling system with a regulation-to-component cross-reference table
Liquid and Vapor Piping Systems & Tanks and Tank Appurtenances
Compare single-wall, double-wall, and flexible piping types by material, pressure rating, and compatible fuels, building a comparison table
Explain tank construction types (single-wall, double-wall, FRP, steel, jacketed) and match each to its typical monitoring method
Identify every tank appurtenance (fill, vent, gauge, drop tube, manway, striker plate, overfill valve) and state its function and inspection point
Describe how slope, fall, and piping gradient affect drainage and product recovery in a liquid piping run
Your checkpoint
A component comparison matrix covering at least 12 piping and tank appurtenances with function, failure mode, and inspection criterion
Liquid and Vapor Piping Systems & Tanks and Tank Appurtenances & Containment Sumps and Spill Buckets
Sketch a complete piping layout including vent lines, vapor recovery, and secondary containment transitions, marking each joint type
Explain how containment sumps and spill buckets integrate with tank-top and dispenser piping, and where interstitial space connects to monitoring
List the failure modes of flexible versus rigid piping connections and the leak symptoms each produces
Describe proper vent line sizing, slope, and termination requirements and why each matters for vapor and liquid flow
Your checkpoint
A hand-drawn system schematic with all piping, tank, sump, and spill bucket components labeled and a written legend of 15 terms
Containment Sumps and Spill Buckets & Release Detection and Leak Monitoring
Describe sump and spill bucket construction, materials, and sealing methods, and explain how each is tested for tightness
Explain how interstitial monitoring, sump sensors, and spill bucket probes generate alarms and what each alarm indicates
Compare release detection methods (ATG, SIR, MLLD, interstitial, vapor, groundwater) by applicability, limitations, and false-alarm causes
Identify the components of a leak monitoring panel and trace a signal from sensor to alarm to required response action
Your checkpoint
A release detection method selection worksheet matching six monitoring scenarios to the appropriate method with justification
Release Detection and Leak Monitoring & Installation, Testing, and Inspection
Walk through each tightness test type (tank, line, sump, spill bucket) and state the pass/fail criteria and test duration
Explain the sequence of a line leak detector test and how to interpret results for mechanical and electronic LLDs
Describe inventory reconciliation and how a variance calculation reveals a possible release
List the documentation required for each test type and who must sign off
Your checkpoint
A test procedure checklist covering tank, line, sump, and spill bucket tightness tests with pass/fail thresholds
Installation, Testing, and Inspection & Safety and Environmental Regulations
Sequence a full installation from excavation through backfill, piping, tank setting, sump installation, and commissioning
Identify inspection hold points where work must stop for verification and what is verified at each
Explain secondary containment testing, hydrostatic testing, and vacuum testing procedures and when each applies
Describe safety requirements for confined space entry, hot work, and excavation on a fueling site
Your checkpoint
An installation and inspection sequence timeline with at least eight hold points and the verification criterion for each
Safety and Environmental Regulations & Containment Sumps and Spill Buckets & Release Detection and Leak Monitoring
Review spill prevention, overfill protection, and corrosion protection requirements and how each is verified in the field
Explain sump and spill bucket inspection frequency, common defects, and corrective actions
Describe alarm response procedures and the reporting chain when a release is suspected
Identify recordkeeping obligations for testing, monitoring, and inspection and the retention periods
Your checkpoint
A compliance and inspection calendar template listing each required activity, its frequency, and its record
Safety and Environmental Regulations & Liquid and Vapor Piping Systems & Containment Sumps and Spill Buckets & Tanks and Tank Appurtenances & Release Detection and Leak Monitoring & Installation, Testing, and Inspection
Complete a timed 100-question practice set across all six domains and score each domain separately
Re-study the two lowest-scoring domains using your own notes and diagrams
Recite from memory the key definitions, test thresholds, and inspection criteria for each domain
Build a one-page quick-reference sheet of formulas, thresholds, and component functions for final review
Your checkpoint
A scored practice exam with a domain-by-domain error log and a completed one-page quick-reference sheet
Milestones
Week 2: Can name every tank and piping appurtenance and state its function without notes
Week 4: Can select the correct release detection method for any given site scenario and justify the choice
Week 6: Can sequence a full installation and identify each inspection hold point from memory
Week 8: Scores at least 80 percent overall with no domain below 70 percent on the timed practice set