PEI Class 7 Test study materials
PEI Class 7 Test study resources

PEI Class 7 Test study plan

PEI Class 7 Test · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Safety and Environmental Regulations & Liquid and Vapor Piping Systems

  • Map each PEI RP100/RP200 recommended practice section to the corresponding Class 7 topic, writing a one-line summary of what each section requires

  • Define spill, overfill, and release in your own words and list the field conditions that distinguish each on a fueling site

  • Trace a liquid product path from delivery point through piping to tank and back out to dispenser, labeling every component and its secondary containment layer

  • List the federal and state regulatory categories (SPCC, UST, stormwater, air) that apply to a Class 7 installer and note which agency enforces each

Your checkpoint

A two-page annotated flow diagram of a complete fueling system with a regulation-to-component cross-reference table

Week 2

Liquid and Vapor Piping Systems & Tanks and Tank Appurtenances

  • Compare single-wall, double-wall, and flexible piping types by material, pressure rating, and compatible fuels, building a comparison table

  • Explain tank construction types (single-wall, double-wall, FRP, steel, jacketed) and match each to its typical monitoring method

  • Identify every tank appurtenance (fill, vent, gauge, drop tube, manway, striker plate, overfill valve) and state its function and inspection point

  • Describe how slope, fall, and piping gradient affect drainage and product recovery in a liquid piping run

Your checkpoint

A component comparison matrix covering at least 12 piping and tank appurtenances with function, failure mode, and inspection criterion

Week 3

Liquid and Vapor Piping Systems & Tanks and Tank Appurtenances & Containment Sumps and Spill Buckets

  • Sketch a complete piping layout including vent lines, vapor recovery, and secondary containment transitions, marking each joint type

  • Explain how containment sumps and spill buckets integrate with tank-top and dispenser piping, and where interstitial space connects to monitoring

  • List the failure modes of flexible versus rigid piping connections and the leak symptoms each produces

  • Describe proper vent line sizing, slope, and termination requirements and why each matters for vapor and liquid flow

Your checkpoint

A hand-drawn system schematic with all piping, tank, sump, and spill bucket components labeled and a written legend of 15 terms

Week 4

Containment Sumps and Spill Buckets & Release Detection and Leak Monitoring

  • Describe sump and spill bucket construction, materials, and sealing methods, and explain how each is tested for tightness

  • Explain how interstitial monitoring, sump sensors, and spill bucket probes generate alarms and what each alarm indicates

  • Compare release detection methods (ATG, SIR, MLLD, interstitial, vapor, groundwater) by applicability, limitations, and false-alarm causes

  • Identify the components of a leak monitoring panel and trace a signal from sensor to alarm to required response action

Your checkpoint

A release detection method selection worksheet matching six monitoring scenarios to the appropriate method with justification

Week 5

Release Detection and Leak Monitoring & Installation, Testing, and Inspection

  • Walk through each tightness test type (tank, line, sump, spill bucket) and state the pass/fail criteria and test duration

  • Explain the sequence of a line leak detector test and how to interpret results for mechanical and electronic LLDs

  • Describe inventory reconciliation and how a variance calculation reveals a possible release

  • List the documentation required for each test type and who must sign off

Your checkpoint

A test procedure checklist covering tank, line, sump, and spill bucket tightness tests with pass/fail thresholds

Week 6

Installation, Testing, and Inspection & Safety and Environmental Regulations

  • Sequence a full installation from excavation through backfill, piping, tank setting, sump installation, and commissioning

  • Identify inspection hold points where work must stop for verification and what is verified at each

  • Explain secondary containment testing, hydrostatic testing, and vacuum testing procedures and when each applies

  • Describe safety requirements for confined space entry, hot work, and excavation on a fueling site

Your checkpoint

An installation and inspection sequence timeline with at least eight hold points and the verification criterion for each

Week 7

Safety and Environmental Regulations & Containment Sumps and Spill Buckets & Release Detection and Leak Monitoring

  • Review spill prevention, overfill protection, and corrosion protection requirements and how each is verified in the field

  • Explain sump and spill bucket inspection frequency, common defects, and corrective actions

  • Describe alarm response procedures and the reporting chain when a release is suspected

  • Identify recordkeeping obligations for testing, monitoring, and inspection and the retention periods

Your checkpoint

A compliance and inspection calendar template listing each required activity, its frequency, and its record

Week 8

Safety and Environmental Regulations & Liquid and Vapor Piping Systems & Containment Sumps and Spill Buckets & Tanks and Tank Appurtenances & Release Detection and Leak Monitoring & Installation, Testing, and Inspection

  • Complete a timed 100-question practice set across all six domains and score each domain separately

  • Re-study the two lowest-scoring domains using your own notes and diagrams

  • Recite from memory the key definitions, test thresholds, and inspection criteria for each domain

  • Build a one-page quick-reference sheet of formulas, thresholds, and component functions for final review

Your checkpoint

A scored practice exam with a domain-by-domain error log and a completed one-page quick-reference sheet

Milestones

Week 2: Can name every tank and piping appurtenance and state its function without notes

Week 4: Can select the correct release detection method for any given site scenario and justify the choice

Week 6: Can sequence a full installation and identify each inspection hold point from memory

Week 8: Scores at least 80 percent overall with no domain below 70 percent on the timed practice set