PNG CASA AME Subject 20 Air Law flashcards
PNG CASA AME Subject 20 Air Law · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Civil Aviation Act 2000
- PNG statute establishing CASA PNG as the safety regulator, giving effect to Chicago Convention obligations and providing the power to make the PNG Civil Aviation Rules.
- Director of Civil Aviation
- Statutory delegate of CASA PNG who issues licences, certificates and approvals; individual regulatory decisions rest with this office, not with the Minister.
- Disallowable instrument
- A PNG Civil Aviation Rule made under the Act that must be tabled in Parliament and can be disallowed; it takes effect through this statutory process.
- Advisory Circular status
- An AC describes an acceptable means of compliance but is not legally binding; the rule remains mandatory and prevails if the two conflict.
- Airworthiness Directive
- A mandatory directive issued or adopted by CASA PNG requiring action on an aircraft or component; compliance is enforceable and not optional guidance.
- Rule exemption
- Written, time-limited and condition-bound relief granted by the Director from a specific rule; it does not remove the duty to maintain acceptable safety.
- Part 66 licence scope
- The category and type ratings endorsed on an AME licence define the certification privileges; work outside that scope requires separate authorisation.
- Maintenance certification act
- Signing a maintenance release asserts the work was done to approved data and the aircraft is airworthy in respect of that work.
- AME fitness to certify
- A licence holder must not certify when impaired by fatigue, alcohol, medication or illness; self-declared fitness is a licensing obligation.
- Airworthiness definition
- An aircraft is airworthy when it conforms to its approved type design and is in a condition for safe operation; both elements are required.
- Special flight permit
- A ferry authorisation allowing flight of an aircraft that does not meet full airworthiness requirements, subject to stated operating limitations and purpose.
- Major modification approval
- A major modification or repair requires approved design data, and where specified a supplemental type certificate, before it may be installed.
- Approved maintenance programme
- The CASA PNG-approved schedule of inspections and component replacements that an operator must follow to keep the certificate of airworthiness valid.
- Minimum Equipment List
- An approved list permitting dispatch with specified defects under stated conditions; items not listed cannot be deferred under the MEL.
- Part 145 exposition
- The maintenance organisation's document defining scope of work, personnel, facilities, tooling and quality system; the organisation must operate within it.
- Annex 8 airworthiness
- ICAO Annex setting State of Registry, Design and Manufacture obligations to ensure aircraft on the register meet continuing airworthiness requirements.
- Annex 19 SMS components
- Safety policy and objectives, safety risk management, safety assurance, and safety promotion: the four components required of service provider SMS.
- Notified difference
- A formal notification to ICAO that a State's rule differs from an Annex Standard; the national rule, not the Annex text, then applies.
- Class G airspace
- Uncontrolled airspace where neither IFR nor VFR flights receive separation service; see-and-avoid applies to all aircraft.
- Semicircular cruising levels
- IFR level rule: tracks 000 to 179 degrees use odd levels, tracks 180 to 359 degrees use even levels, per the prescribed table.
- Read-back requirement
- Mandatory repetition of route, level and frequency clearances to reduce communication error; failure to read back does not invalidate the clearance.
- Pilot in command authority
- The PIC is responsible for safe operation and has final authority over the aircraft's conduct, including in an emergency.
- Operational control
- The process ensuring each flight is authorised with an airworthy aircraft, qualified crew, and load within limits before departure.
- Flight and duty time limits
- Fatigue-control scheme approved by CASA PNG limiting duty periods and requiring recorded rest; operating outside the scheme is a breach.
- Just culture
- A reporting environment distinguishing acceptable human error from reckless violation; good-faith reports do not attract disciplinary action.
- Accident Investigation Commission
- PNG's independent investigation body for accidents and serious incidents; it determines causes and issues safety recommendations, not liability findings.
- Mandatory occurrence report
- A report of an accident, serious incident or specified reportable occurrence, submitted to the authority within the time prescribed by the rules.
- Shipper DG responsibility
- The shipper classifies, packs, marks and documents dangerous goods correctly under the ICAO Technical Instructions before offering them for carriage.
- Dangerous goods acceptance check
- A documented inspection by trained personnel confirming classification, packing, labelling and documentation before dangerous goods are loaded.
- Pilot-in-command DG notification
- The PIC must be informed of dangerous goods on board and their location, and that notification must be recorded.
- Show cause notice
- A notice giving a licence or certificate holder the opportunity to respond before adverse enforcement action such as suspension or revocation.
- Falsifying maintenance records
- Certifying work not performed or altering records is among the most serious offences, attracting the heaviest penalties and licence action.