ASP Fellowship I study materials
ASP Fellowship I study resources

ASP Fellowship I cheat sheet

ASP Fellowship I · Keep the key ideas within reach.

Quick reference

Professional Practice and Ethics

  • Fiduciary duty: act in the client's and public's interest above personal gain; disclose any conflict of interest in writing before accepting an engagement.

  • Competence rule: accept only work within your education, training, and experience; document qualifications and obtain specialist review when outside your scope.

  • Confidentiality persists after the engagement ends; exceptions are legal compulsion, imminent harm to persons, or client-authorized release.

  • Conflict of interest test: does a reasonable observer perceive bias? Perception alone triggers disclosure and, if material, withdrawal.

  • Signing and sealing certifies personal review of the work; never seal drawings, reports, or calculations prepared by others without verified supervision.

  • Whistleblower duty: report conditions that endanger public safety or violate law to the employer first, then the regulator if unresolved.

  • Plagiarism and data fabrication are grounds for license revocation; retain raw data and calculation files for the statutory retention period.

  • Gift and payment limits: nominal courtesy gifts are generally acceptable; anything that could influence judgment must be declined and recorded.

Quick reference

Regulations, Standards, and Compliance

  • Hierarchy of authority: statute > regulation > incorporated standard > guidance; a conflict resolves in favor of the more stringent enforceable requirement.

  • Standards are incorporated by reference into regulation, so the edition cited in the regulation governs, not the newest edition.

  • Compliance audit trail: every regulated activity needs a dated record linking requirement, responsible person, evidence, and closure.

  • Permit conditions are enforceable obligations; operating outside a permit limit is a violation regardless of intent or actual harm.

  • Regulatory inspection rights: inspectors may enter, sample, and copy records; refusal can itself be a separate violation.

  • Change management: physical or procedural changes that affect a permitted activity require review and often prior approval before implementation.

  • Recordkeeping periods differ by regulation; the longest applicable retention period controls when multiple rules apply.

  • Noncompliance response sequence: stop the activity, contain impact, notify the regulator within the required window, then root-cause and correct.

Quick reference

Safety and Environmental Protection

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, then PPE.

  • Risk score = likelihood × severity; use the matrix consistently and re-score after each control is applied.

  • Hazard communication requires labels, safety data sheets, and training for every hazardous chemical in the workplace.

  • Permissible exposure limits are time-weighted averages over an 8-hour shift unless the standard states a ceiling or short-term limit.

  • Confined space entry requires atmospheric testing before entry and continuous monitoring, an attendant, and a rescue plan.

  • Environmental release reporting is triggered by reportable quantities; notify the authority immediately and follow with a written report.

  • Waste hierarchy: reduce, reuse, recycle, treat, then dispose; hazardous waste manifests track cradle-to-grave custody.

  • Incident investigation seeks root causes via the chain of events and contributing factors; blame-based reporting suppresses future disclosure.

Quick reference

Fundamentals and Applied Science

  • Conservation of mass: mass in − mass out = accumulation; apply to every unit operation before solving energy balances.

  • Energy balance: Q − W = ΔU + ΔKE + ΔPE; for steady flow use enthalpy, and neglect kinetic and potential terms only when justified.

  • Ideal gas law PV = nRT; deviations grow near the critical point, where compressibility factor Z must be applied.

  • First-order decay: C = C₀e^(−kt), half-life t½ = ln2/k ≈ 0.693/k.

  • Reynolds number Re = ρvD/μ; below ~2,000 flow is laminar, above ~4,000 turbulent, between is transitional.

  • Heat transfer: conduction q = kAΔT/L; convection q = hAΔT; radiation q = εσA(T₁⁴ − T₂⁴) in kelvin.

  • Pump power = ρgQH/η; system curve intersects the pump curve at the operating point.

  • Significant figures reflect measurement precision; carry extra digits through intermediate steps and round only the final answer.

Quick reference

Systems, Equipment, and Technology

  • Control loop anatomy: sensor, transmitter, controller, final element; loop tuning sets proportional band, integral, and derivative terms.

  • Fail-safe design: on loss of power or signal, the final element moves to the position that protects people and the environment.

  • Redundancy types: active (parallel running), standby (cold or warm), and diverse (different technology) to avoid common-cause failure.

  • Relief device sizing is based on the worst-credible overpressure scenario, not normal operating conditions.

  • Preventive maintenance intervals derive from failure history or manufacturer data; condition monitoring shifts work from calendar to evidence-based.

  • Piping and instrumentation diagrams show equipment, lines, and instrumentation; isometrics add dimensions for fabrication.

  • Lockout/tagout isolates all hazardous energy sources; verify zero energy state before work begins.

  • Commissioning sequence: mechanical completion, then check-out, then functional testing, then performance test, then handover.

Quick reference

Analysis, Measurement, and Quality Assurance

  • Accuracy is closeness to true value; precision is repeatability. Bias shifts accuracy; scatter reduces precision.

  • Calibration establishes the relationship between instrument output and reference standard; traceability to a national standard is required.

  • Measurement uncertainty combines Type A (statistical) and Type B (manufacturer, calibration) contributions in quadrature.

  • Control charts: points beyond control limits or nonrandom runs indicate special-cause variation; do not react to common-cause noise.

  • Sampling must be representative; grab samples describe a moment, composite samples describe an average over time.

  • Root cause tools: 5-whys, fishbone, and fault tree; verify the cause by reproducing or removing it.

  • Detection limit is three times the standard deviation of blank measurements; quantitation limit is typically ten times.

  • Audit types: internal, external, and third-party; findings are classified as major or minor nonconformities with corrective action deadlines.

Quick reference

Management, Communication, and Leadership

  • Project constraints: scope, schedule, cost, and quality are interdependent; a change in one forces adjustment in the others.

  • Critical path is the longest duration path through the network; delaying it delays the project finish.

  • Earned value: CV = EV − AC; SV = EV − PV; CPI = EV/AC; SPI = EV/PV; index below 1.0 signals adverse performance.

  • Risk register entries carry probability, impact, owner, and response strategy: avoid, mitigate, transfer, or accept.

  • Delegation requires matching authority to responsibility and confirming competence and resources.

  • Written communication standard: state purpose, audience, key message, evidence, and required action in that order.

  • Constructive feedback is specific, behavioral, timely, and paired with an actionable next step.

  • Stakeholder mapping by influence and interest determines engagement depth; high-influence, high-interest parties need active involvement.

Quick reference

Emerging Issues and Integrated Practice

  • Life-cycle assessment quantifies impacts from raw material through disposal; system boundary choices drive the result.

  • Digital twins require validated models, sensor data quality control, and documented uncertainty before decisions rely on them.

  • AI-assisted analysis must be explainable and human-reviewed; retain model version, training data provenance, and validation records.

  • Climate adaptation integrates projected extremes into design margins; historical records alone may understate future loads.

  • Circular economy design prioritizes material recovery, repairability, and design for disassembly at the concept stage.

  • Cybersecurity for operational technology follows segmentation, least privilege, and patching with operational risk assessment.

  • Integrated practice requires interface registers between disciplines; unassigned interfaces are the most common source of failure.

  • Emerging regulation moves faster than standards; treat draft rules as early warning and build compliance margin into design.