- Fiduciary duty
- The obligation to act in the client's and public's best interest ahead of personal gain, disclosing conflicts in writing before accepting work.
- Conflict of interest
- A situation where personal, financial, or other interests could bias professional judgment; it requires written disclosure and possible withdrawal from the engagement.
- Scope of competence
- The boundary of work a professional may accept based on education, training, and experience; work outside it needs specialist review or referral.
- Sealing drawings
- Affixing a professional seal certifies personal review and responsibility for the work; sealing unverified work by others violates practice rules.
- Confidentiality exceptions
- Client information stays confidential after the engagement ends unless disclosure is legally compelled, authorized by the client, or needed to prevent imminent harm.
- Incorporation by reference
- A regulatory technique making a published standard legally enforceable; the specific edition cited in the regulation governs compliance.
- Hierarchy of authority
- Statute outranks regulation, which outranks incorporated standards and guidance; conflicting requirements resolve toward the more stringent enforceable rule.
- Permit condition
- A legally binding limit or operating requirement attached to a permit; exceeding it is a violation regardless of intent or actual harm.
- Change management
- A controlled process ensuring that physical or procedural changes are reviewed and approved before implementation when they affect permitted activities.
- Compliance audit trail
- A dated record linking each regulatory requirement to a responsible person, supporting evidence, and closure, enabling demonstration of compliance during inspection.
- Hierarchy of controls
- Ranking of hazard controls from most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment.
- Risk score
- A value computed as likelihood multiplied by severity, used with a consistent matrix and recalculated after each control measure is applied.
- Permissible exposure limit
- A regulatory airborne concentration limit, usually an 8-hour time-weighted average, sometimes expressed as a ceiling or short-term exposure limit.
- Confined space entry
- Entry requiring atmospheric testing before and during occupancy, an attendant outside, isolation of hazards, and a documented rescue plan.
- Reportable quantity
- A threshold release amount that triggers immediate notification to authorities followed by a written report within the required timeframe.
- Mass balance
- The principle that mass entering a system minus mass leaving equals accumulation; applied to each unit operation before energy balances are solved.
- First-order decay
- Concentration declines as C = C₀e^(−kt), giving a half-life of approximately 0.693 divided by the rate constant k.
- Reynolds number
- A dimensionless ratio ρvD/μ used to classify flow as laminar below about 2,000 and turbulent above about 4,000.
- Pump operating point
- The flow and head where the pump performance curve intersects the system curve; power equals ρgQH divided by efficiency.
- Steady-flow energy balance
- For steady flow, heat minus work equals the change in enthalpy plus kinetic and potential energy changes, with negligible terms justified explicitly.
- Fail-safe position
- The final control element position on loss of power or signal that protects people and the environment, chosen during design.
- Relief device sizing
- Sizing based on the worst-credible overpressure scenario rather than normal operating conditions, accounting for all credible relieving sources.
- Lockout tagout
- Isolation of every hazardous energy source with locks and tags, followed by verification of a zero energy state before work begins.
- Commissioning sequence
- Progressive verification through mechanical completion, check-out, functional testing, performance testing, and formal handover to the owner.
- Accuracy versus precision
- Accuracy is closeness to the true value, affected by bias; precision is repeatability, reduced by random scatter in measurements.
- Measurement uncertainty
- The combined range of doubt around a result, combining Type A statistical and Type B calibration or manufacturer contributions in quadrature.
- Control chart signal
- A point beyond control limits or a nonrandom run pattern indicates special-cause variation; common-cause noise should not trigger adjustment.
- Detection limit
- The lowest concentration distinguishable from blank noise, commonly taken as three times the standard deviation of blank measurements.
- Critical path
- The longest-duration sequence of dependent activities through a project network; delay on this path delays project completion.
- Earned value indices
- Cost performance index equals earned value divided by actual cost; schedule performance index equals earned value divided by planned value; below 1.0 is adverse.
- Risk response strategies
- Standard options for registered risks: avoid the activity, mitigate probability or impact, transfer via contract or insurance, or formally accept the exposure.
- Life-cycle assessment
- Quantification of environmental impacts from raw material extraction through disposal, with results strongly dependent on documented system boundary choices.
- AI-assisted analysis controls
- Requirements for trustworthy use: explainable models, human review of outputs, and retained records of model version, data provenance, and validation.