MARINA OIC-EW Theoretical Exam cheat sheet
MARINA OIC-EW Theoretical Exam · Keep the key ideas within reach.
Marine Engineering Knowledge (Main Propulsion and Auxiliary Machinery)
Two-stroke slow-speed diesel: scavenge air enters via ports at the lower liner, exhaust leaves via a central hydraulically actuated exhaust valve; uniflow scavenging needs only one exhaust valve per cylinder.
Indicator diagram: mean indicated pressure (mip) = area of p–V diagram divided by stroke volume; indicated power per cylinder = mip × A × L × n × (cycles per rev), with n in rev/s.
Specific fuel consumption (SFOC) = fuel mass flow (kg/h) ÷ brake power (kW); modern large two-strokes typically 160–180 g/kWh at MCR, rising at part load.
Air/fuel stoichiometry: about 14.5 kg air per kg diesel for complete combustion; scavenge air excess of 2.0–2.5 times stoichiometric is normal at full load.
Turbocharger surge occurs when compressor delivery pressure exceeds what the turbine can sustain; typical triggers are rapid load change, fouled turbine, or air cooler blockage.
Crankcase explosion prevention: oil mist detector alarm at about 2.5% oil mist by volume (lower alarm) with main alarm/auto slowdown at higher concentration; do not open crankcase doors after an alarm until cooling.
Auxiliary boiler: safety valve set at or below design pressure, two independent low-water level trips, and a flame failure trip that closes the fuel valve within a few seconds of flame loss.
Fuel oil viscosity control: HFO heated to give 10–15 cSt at the injector inlet; excessive viscosity causes poor atomisation and afterburn, too low viscosity causes pump and injector wear.
Marine Electrical, Electronic and Control Engineering
Three-phase power: P = √3 × V_line × I_line × power factor; for a 440 V, 100 A, 0.85 pf load, P ≈ 64.8 kW.
Insulation resistance: minimum acceptable for a 440 V system is generally 1 MΩ at 500 V DC megger test; readings below that require investigation before energising.
Alternator paralleling: match voltage, frequency, phase sequence and phase angle before closing the breaker; adjust governor (kW sharing) and excitation (kVAr sharing) after synchronising.
Reverse power protection trips a generator that motored (typically 2–6% of rated kW with time delay) to prevent turbine or prime-mover damage.
Preferential trip (load shedding) disconnects non-essential loads such as galley, air conditioning and some ventilation when one generator is lost, keeping propulsion and steering supplied.
Earth fault on an insulated (IT) distribution system: a single earth fault does not trip; locate it promptly because a second fault on another phase creates a phase-to-phase short.
Battery/charger safety: lead-acid cells emit hydrogen; ventilation and no naked flame; equalising charge voltage per cell is higher than float voltage and must be monitored for temperature.
Programmable logic controller (PLC) inputs: 4–20 mA current loop is preferred over voltage for analogue sensors because it is immune to cable resistance and detects open circuit at 0 mA.
Maintenance and Repair at the Operational Level
Planned maintenance system (PMS) records each job with interval (running hours or calendar), last done, next due, and a sign-off by the responsible engineer; overdue items must be reported.
Critical spares are identified by risk: items whose failure stops propulsion or steering (fuel injection valves, cylinder heads, sea-water pump seals, steering gear pumps) get priority stock levels.
Cylinder liner wear: measure with a dial gauge at defined positions and record; maximum allowable wear rate for large two-strokes is typically around 0.05–0.1 mm per 1000 hours; excessive wear points to lubrication or fuel quality.
Crankcase oil testing: check viscosity, water content, total base number (TBN), insolubles and wear metals (Fe, Cu, Pb, Sn) at defined intervals; trend results rather than judging a single sample.
Bearing clearance check: use plastic gauge (Plastigauge) or lead wire for shell bearings; compare against maker's limits, and check crankshaft deflection for main bearing and bedplate alignment.
Hot work and enclosed space entry require a permit to work, gas testing (O2 20.9%, hydrocarbons <1% LFL, no H2S/CO), standby man and communication; never enter alone.
Torque values: always torque to the maker's figure with a calibrated wrench; for cylinder head bolts follow the specified tightening sequence and stages (often three stages plus a final angle).
Defect reporting: any defect affecting safety, pollution prevention or class must be recorded, reported to the master/company and, where applicable, to class and flag State; temporary repairs need approval.
Controlling the Operation of the Ship and Care for Persons on Board
Rest hours under STCW/MLC: minimum 10 hours rest in any 24-hour period and 77 hours in any 7-day period; rest may be divided into no more than two periods, one at least 6 hours.
Watchkeeping fitness: the officer in charge of a watch must not be under the influence of alcohol (blood alcohol typically 0.05% or 0.25 mg/l breath limit under STCW) or drugs impairing performance.
Master's authority: the master may take any action necessary to preserve life, ship and cargo, and may deviate to save life at sea; the master's overriding obligation is safety of persons.
Enclosed space entry: atmosphere must be tested before and during entry, continuous ventilation maintained, permit issued and a responsible person stationed at the entrance.
Fatigue management: record rest hours daily, plan watch rotations to avoid more than 6 hours on watch without a break, and report fatigue hazards through the safety management system.
Medical care: the ship must carry a medical guide and medicines per flag requirements; the master may request radio medical advice (TMAS) and must record treatment in the medical log.
Muster list: each person has a designated station and duties; drills are required at intervals (abandon ship and fire drills at least monthly for most ships under SOLAS).
Harassment and bullying: MLC 2006 requires complaint procedures onboard and ashore; seafarers have the right to report without victimisation.
Ship Construction and Stability
GM (metacentric height) = KM − KG; positive GM gives initial stability; a stiff ship has large GM (short roll period, harsh motion), a tender ship has small GM.
Free surface effect: FSC = i × ρ / (Δ) where i is the second moment of area of the free surface; divided tanks reduce free surface and increase effective GM.
Angle of loll: a ship with negative GM lists to either side and may flop from one side to the other; correct by lowering KG (ballast low down) and removing free surfaces, not by shifting weight across.
Load line marks: the summer load line is the reference; tropical, winter, fresh water and timber allowances shift the permitted draught; the deck line and load line disc must be permanently marked.
Longitudinal strength: still-water bending moment plus wave-induced bending; hogging puts the deck in tension, sagging puts the bottom in tension; load distribution must stay within class limits.
Bulkhead and watertight integrity: collision bulkhead located at a minimum distance from the forward perpendicular (typically 0.05L to 0.08L); all watertight doors closed at sea unless working.
Damage stability: the vessel must survive flooding of assumed compartments; cross-flooding arrangements and closing appliances are part of the approved damage control plan.
Tonnage: gross tonnage is a measure of enclosed volume (not weight) used for manning and fees; net tonnage is the earning capacity measure; neither equals displacement.
Maritime Law, Conventions and National Regulations (STCW, MARPOL, SOLAS, MLC, ISM)
MARPOL Annex I (oil): 15 ppm oily water separator discharge limit; Annex II noxious liquid substances; Annex III harmful packaged goods; Annex IV sewage; Annex V garbage with a total ban on plastics; Annex VI air pollution (SOx, NOx, EEDI).
MARPOL Annex VI sulphur: 0.50% m/m global limit from 1 January 2020 and 0.10% in ECAs; compliance by low-sulphur fuel, scrubber or alternative fuel, with records in the oil record book and BDN retained 3 years.
Oil Record Book Part I (machinery space) entries must be made without delay for each operation: ballasting, cleaning, discharge through 15 ppm equipment, disposal ashore; false entries are a criminal offence in many jurisdictions.
STCW 2010 Manila Amendments: certificates of competency valid up to 5 years, revalidation requires sea service or refresher training, and basic safety training (PST, FPFF, EFA, PSSR) must be current.
SOLAS Chapter IX/ISM Code: safety management system with documented procedures, designated person ashore, master's responsibility and authority, internal audits and corrective action.
MLC 2006: minimum age 16 (18 for night work/hazardous work), seafarer employment agreement, repatriation, accommodation and food standards, and complaint procedures; certificate of maritime labour compliance plus declaration of maritime labour compliance.
COLREG Rule 5: proper lookout by sight and hearing and all available means; Rule 6 safe speed; Rule 8 action to avoid collision must be positive, made in ample time and large enough to be readily apparent.
Port State Control: inspectors may detain for deficiencies; the ship must carry valid statutory certificates and class certificates, and the master must cooperate and record the inspection in the appropriate log.
Ship Safety, Pollution Prevention and Emergency Procedures
Fire triangle: fuel, oxygen and heat; extinguishing by removing one side. Class A (solids), B (flammable liquids), C (gases), D (metals), F (cooking oils); water is forbidden on B, C, D, F and on live electrical equipment.
Fixed CO2 system: release only after all persons accounted for and space sealed and ventilation shut; CO2 displaces oxygen and is lethal in occupied spaces; the alarm sounds before release.
Fire main pressure and hydrants: at least two jets of water from different hydrants must reach any part of the ship; the emergency fire pump is located outside the machinery space.
Abandon ship: distress signal, muster at stations, lifeboat/liferaft launch, and the order to abandon is given only by the master; the EPIRB and SART are activated as directed.
Man overboard: immediate helm hard over to swing the stern away from the person, release lifebuoy with light/smoke, sound three long blasts, post lookout, commence Williamson turn and inform master.
Oil spill response: stop the source, contain with booms, use SOPEP/Emergency Plan, notify the master and authorities, and record actions; never use dispersants without approval.
Emergency generator: must start and supply emergency loads (steering, emergency lighting, radio, fire pump) automatically within 45 seconds of main power failure under SOLAS.
Drills and training: fire and abandon-ship drills monthly, enclosed space rescue drills as required, and records kept in the official logbook and training manual.
Watchkeeping, Engineering Practice and Resource Management
Engine room watch handover: report machinery condition, ongoing work, defects, alarms and unusual readings; never hand over during a critical manoeuvre without the chief engineer's approval.
Unattended machinery space (UMS): alarm and safety systems must be tested and proven; the duty engineer must be within call and respond to alarms within the specified time.
Bridge control: before switching to bridge control, test the engine telegraph, confirm starting air pressure and fuel rack operation, and ensure the engine room is manned for manoeuvring.
Standby engine: main engine on standby at least one hour before departure and during pilotage; the engine room must be manned and the telegraph tested both ways.
Resource management: use closed-loop communication (order, repeat back, confirm), challenge unclear instructions, and assign a person to monitor the engine controls during manoeuvres.
Alarm response: acknowledge, identify the alarm, take immediate safe action, then investigate; do not silence or inhibit alarms to clear a nuisance without recording and reporting.
Bunkering: pre-transfer checklist, agreed transfer rate and topping-off rate, scuppers plugged, continuous watch at the manifold and tanks, and emergency stop agreed before starting.
Machinery space flooding: bilge high-level alarms, emergency bilge suction, and the ability to isolate the sea-water system; know the location of the emergency suction valve.
Marine Engineering Knowledge (Main Propulsion and Auxiliary Machinery) - Steering and Auxiliaries
Steering gear: SOLAS requires two independent power units; the main and emergency steering gear must be tested within 12 hours before departure, with the test recorded.
Steering gear failure: change to the second pump/unit, switch to emergency steering from the steering flat, inform the bridge, and exhibit the appropriate signals.
Steering gear hydraulic oil: check level, temperature, leakage and pump pressure; a hydraulic lock or air in the system causes sluggish or noisy response.
Air compressor: intercooler and aftercooler drain traps must be checked; high discharge temperature trips protect against valve or cooler failure; safety valves tested periodically.
Fresh water generator: output depends on jacket water temperature and vacuum; scale on the evaporator reduces output and requires chemical cleaning.
Purifier: correct gravity disc selection for the fuel density and temperature; incorrect disc causes water carry-over or oil loss to the sludge side.
Sewage treatment plant: check aeration, chlorine/disinfectant dosing, and discharge limits; the plant must be approved and not discharge untreated sewage within restricted areas.
Marine Electrical, Electronic and Control Engineering - Automation and Instrumentation
Sensor ranges: a 4–20 mA transmitter with a 0–10 bar range gives 4 mA at 0 bar and 20 mA at 10 bar; a reading of 12 mA corresponds to 5 bar.
PID control: proportional band, integral (reset) time and derivative time; too much proportional gain causes oscillation, too much integral causes slow hunting, derivative is rarely used on noisy signals.
Alarm and trip philosophy: alarms warn, trips protect; safety-critical trips (overspeed, low lube oil pressure, high jacket water temperature) must not be bypassed without a documented risk assessment.
Two-wire vs three-wire resistance temperature detector (RTD): a three-wire Pt100 compensates for cable resistance; a two-wire installation introduces an error proportional to lead resistance.
Emergency stop and interlock circuits are fail-safe: they are wired so that loss of power or a broken wire produces the safe state (trip).
Insulation monitoring on an IT system: the monitor injects a small DC or low-frequency signal and alarms on the first earth fault; locate the fault by sectional isolation.
Blackout recovery: the emergency generator starts automatically, the main switchboard is re-energised in sequence, and large loads are reconnected in stages to avoid a second trip.