Automotive Body Repair & Painting NC II study materials
Automotive Body Repair & Painting NC II study resources

Automotive Body Repair & Painting NC II study plan

Automotive Body Repair & Painting NC II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Panel preparation, damage assessment, and metal finishing & Use of hand tools, power tools, and measuring instruments

  • Identify and label the major sheet-metal panel sections of a vehicle body using a printed diagram you draw yourself

  • Demonstrate correct grip and stroke on a hammer-and-dolly set and a body file, describing the purpose of each tool aloud

  • Classify ten written damage scenarios as dent, crease, stretched metal, or tear, and state the first corrective step for each

  • Read a steel rule and a vernier caliper to the nearest 0.5 mm on five practice measurements

Your checkpoint

A one-page damage-assessment worksheet with your ten classified scenarios, chosen first steps, and the five measurement readings recorded

Week 2

Panel preparation, damage assessment, and metal finishing & Body panel replacement, alignment, and structural repair

  • Explain when to repair versus replace a panel, listing at least four decision criteria

  • Describe the sequence for removing a bolted-on panel and record the fastener order you would follow

  • Outline metal-finishing steps from rough shaping to final filing and identify the check for panel flatness

  • State the alignment checks performed before and after fitting a replacement panel

Your checkpoint

A written repair-or-replace decision guide with your four criteria and a numbered removal/refit sequence for one bolted panel

Week 3

Body panel replacement, alignment, and structural repair

  • Describe how to measure and correct panel gap and flushness using feeler gauges and a straightedge

  • List the safety precautions and setup steps for a structural pull, including anchoring and load direction

  • Explain the purpose of sectioning and the joint types used when a full panel cannot be replaced

  • Identify the inspection points that confirm a replacement panel is correctly aligned before refinishing

Your checkpoint

A gap-and-flush inspection checklist with target tolerances you define and a step list for a structural pull setup

Week 4

Surface preparation, masking, and paint mixing & Materials, consumables, and waste handling

  • Sequence the surface-preparation steps from bare metal through primer, filler, and final sanding

  • Demonstrate and describe correct masking of a window, a trim edge, and a body line without overspray paths

  • Calculate a paint-to-reducer mixing ratio for three given volumes and show your working

  • Match each consumable (abrasive grit, masking tape grade, mixing cup) to its correct use

  • Describe the segregation and labeling of solvent waste, used filters, and empty containers

Your checkpoint

A mixing-ratio calculation sheet with three worked examples plus a labeled consumables-to-use table

Week 5

Spray painting application, finishing, and defect correction

  • Describe gun setup: fluid tip choice, air pressure setting, and spray pattern test on cardboard

  • Explain correct gun distance, overlap, and travel speed, and the defects caused by getting each wrong

  • List the causes and corrections for runs, orange peel, dry spray, and solvent pop

  • Outline the flash-off and curing sequence between coats for a basecoat-clearcoat system

Your checkpoint

A defect-correction chart covering four defects, each with cause, prevention, and correction written in your own words

Week 6

Spray painting application, finishing, and defect correction & Vehicle reassembly, quality inspection, and housekeeping

  • Describe how to inspect a finished panel for color match, texture, and coverage under correct lighting

  • Sequence the reassembly of trim, lamps, and hardware after refinishing, noting torque and clip-replacement points

  • List the final quality-inspection checks performed before a vehicle is released

  • State the housekeeping and tool-return routine at the end of a job

Your checkpoint

A final-inspection and reassembly checklist of at least twelve checkpoints in the order you would perform them

Week 7

Workplace communication and occupational health and safety practices & Materials, consumables, and waste handling

  • Identify the PPE required for each task: sanding, mixing, spraying, and welding-adjacent work

  • Describe safe handling, storage, and ventilation requirements for paints, thinners, and fillers

  • Explain how to report a hazard and where to find safety data sheet information for a product

  • Describe correct communication with a customer or supervisor when a repair scope changes

Your checkpoint

A task-to-PPE matrix covering four tasks plus a short written script for reporting a scope change to a customer

Week 8

Workplace communication and occupational health and safety practices & Use of hand tools, power tools, and measuring instruments & Panel preparation, damage assessment, and metal finishing & Body panel replacement, alignment, and structural repair & Surface preparation, masking, and paint mixing & Spray painting application, finishing, and defect correction & Vehicle reassembly, quality inspection, and housekeeping & Materials, consumables, and waste handling

  • Complete a timed 60-question self-test across all eight domains and score your own answers

  • Re-study your three weakest topics based on the self-test results

  • Recite the tool names, their uses, and their care points from memory without notes

  • Write a one-page summary linking each domain to the stage of a full repair job it belongs to

Your checkpoint

A scored self-test with a written list of your three weakest topics and the review notes you made for each

Milestones

Week 2: You can explain repair-versus-replace criteria and outline a panel removal sequence without notes

Week 4: You can calculate a mixing ratio correctly for three volumes and describe masking and waste segregation

Week 6: You can name the cause and correction for four common paint defects and list twelve final-inspection checks

Week 8: You score at least 80% on the timed self-test and have review notes for your three weakest topics