FCAW NC II study materials
FCAW NC II study resources

FCAW NC II study plan

FCAW NC II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Execution of FCAW welds and welding procedure compliance & Occupational health and safety, and environmental protection in the welding workplace

  • Map every clause of a sample welding procedure specification (WPS) for FCAW to the variables you must control at the arc: current, voltage, wire feed speed, travel speed, stick-out, gas flow, and preheat.

  • Demonstrate correct donning, inspection, and doffing of a welding helmet, respirator, leathers, and hearing protection, and state the failure mode each item guards against.

  • Identify the ventilation and fume-extraction controls required for flux-cored arc welding indoors, and explain why self-shielded and gas-shielded wires demand different fume control.

  • Set up a hot-work permit scenario: locate the nearest fire extinguisher, clear combustibles within the required radius, and assign a fire watch for 30 minutes after completion.

  • Label the hazards of the FCAW arc circuit, including open-circuit voltage, secondary voltage, and the risk of electric shock when changing wire or nozzles.

Your checkpoint

A one-page WPS-to-arc-variables crosswalk plus a signed personal protective equipment and hot-work checklist you can reuse on the job.

Week 2

Execution of FCAW welds and welding procedure compliance & Set-up, adjustment, and troubleshooting of FCAW equipment and parameters

  • Set the FCAW machine from scratch: select polarity, connect the work lead and gun, thread the wire through the drive rolls, and set wire feed speed and voltage to a given WPS.

  • Diagnose and correct three common feed faults: birdnesting at the drive rolls, burnback into the contact tip, and wire slipping from incorrect tension.

  • Adjust stick-out and travel angle deliberately and describe how each change shifts penetration, bead width, and spatter.

  • Run stringer beads in the flat position on mild steel and record the parameters used for each bead.

  • Explain why gas-shielded FCAW uses direct current electrode positive and what changes when you switch to a self-shielded wire.

Your checkpoint

A parameter log of at least six flat-position beads with voltage, current, wire feed speed, gas flow, and a one-line comment on bead appearance.

Week 3

Execution of FCAW welds and welding procedure compliance & Preparation of materials, joint configuration, and fit-up

  • Prepare plate edges by grinding and cleaning to bright metal, then set a single-V butt joint with the correct root gap, land, and included angle.

  • Fit up a T-joint and a lap joint within tolerance and verify squareness and alignment before tacking.

  • Tack weld in the correct sequence to control distortion and explain the effect of tack size and placement.

  • Execute a root pass on a single-V butt joint in the flat position with consistent penetration and no burn-through.

  • Identify the causes of lack of fusion and incomplete penetration in the root and correct them on the next pass.

Your checkpoint

One fitted and tacked single-V butt joint plus one T-joint, photographed before welding with gap and angle measurements recorded.

Week 4

Execution of FCAW welds and welding procedure compliance & Set-up, adjustment, and troubleshooting of FCAW equipment and parameters

  • Complete multi-pass welds on a single-V butt joint in the flat and horizontal positions, maintaining interpass temperature and cleaning between passes.

  • Weld in the vertical-up position with a weave or step technique and control the puddle to avoid undercut and slag entrapment.

  • Weld in the overhead position and adjust current, travel speed, and electrode angle to keep the puddle manageable.

  • Troubleshoot porosity by isolating shielding gas loss, contaminated base metal, and excessive stick-out, and correct each cause.

  • Record and justify any parameter change you make away from the WPS, and state when a procedure qualification would be required.

Your checkpoint

Four welded test plates covering flat, horizontal, vertical-up, and overhead positions, each with a parameter sheet and a self-assessment of defects.

Week 5

Inspection, testing, and defect identification of completed welds & Execution of FCAW welds and welding procedure compliance

  • Perform a visual inspection of your own test plates against acceptance criteria and classify each discontinuity by type, size, and location.

  • Distinguish porosity, slag inclusion, undercut, overlap, spatter, arc strike, and crater cracks on sight and state the likely process cause of each.

  • Describe how penetrant testing, magnetic particle testing, ultrasonic testing, and radiographic testing each detect subsurface or surface flaws, and select an appropriate method for a given joint.

  • Prepare a weld for destructive testing by cutting and etching a cross-section, and interpret the macro etch for penetration and fusion.

  • Explain the difference between a procedure qualification record and welder performance qualification, and what each proves.

Your checkpoint

A completed visual inspection report on four test plates with defect classifications and acceptance or rejection decisions.

Week 6

Interpretation of welding drawings, symbols, and specifications & Preparation of materials, joint configuration, and fit-up

  • Read a fabrication drawing and extract dimensions, weld symbols, joint types, and any supplementary symbols such as all-around or field welds.

  • Decode the standard welding symbol: reference line, arrow, tail, groove and fillet symbols, size, length, pitch, and tail references.

  • Convert a written joint description into a correct welding symbol and vice versa for at least ten cases.

  • Apply dimensional tolerances and fit-up limits from a specification to decide whether a joint is acceptable before welding.

  • Identify the base metal specification and filler metal classification called out on a drawing and confirm they match the WPS.

Your checkpoint

A symbol interpretation worksheet of ten drawings translated into plain-language welding instructions, with two reverse translations.

Week 7

Use and maintenance of hand tools, power tools, and welding equipment & Post-weld operations, finishing, and documentation

  • Inspect and maintain the FCAW power source, wire feeder, gun, liner, and contact tip on a scheduled basis, and replace worn consumables.

  • Diagnose power tool faults such as a binding grinder, a damaged cord, and a worn disc, and remove the tool from service correctly.

  • Perform post-weld cleaning: remove slag and spatter, grind welds to profile, and finish surfaces without gouging the base metal.

  • Complete weld documentation including welder identification, WPS number, date, joint location, and inspection results.

  • Explain how weld records support traceability and what must be retained for a qualified procedure.

Your checkpoint

A completed equipment maintenance log and a finished weldment with a full documentation package attached.

Week 8

Quality management and continuous improvement in welding work & Occupational health and safety, and environmental protection in the welding workplace & Inspection, testing, and defect identification of completed welds

  • Apply a plan-do-check-act cycle to a recurring defect in your own work, identifying the root cause and verifying that the corrective action reduced the defect rate.

  • Audit your work area against housekeeping, fume control, and electrical safety requirements and close out every finding.

  • Explain how welding variables, consumable storage, and fit-up accuracy feed into a quality management system and continuous improvement.

  • Re-inspect all test plates from earlier weeks and confirm the defects you identified were correctly classified.

  • Assemble a personal study summary that maps each exam domain to the evidence you produced during the eight weeks.

Your checkpoint

A continuous improvement report documenting one defect, its root cause, the corrective action, and before-and-after results, plus a completed domain evidence map.

Milestones

Week 2: You can set up the FCAW machine unaided from a WPS and correct a wire feed fault without help.

Week 4: You have produced acceptable multi-pass welds in flat, horizontal, vertical-up, and overhead positions with recorded parameters.

Week 6: You can translate between welding symbols and written instructions in both directions with at least 80 percent accuracy.

Week 8: You hold a complete evidence package: inspection reports, maintenance log, documentation set, and continuous improvement report.