Plumbing NC I flashcards
Plumbing NC I · Build recall with a focused review session.
35 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Hierarchy of hazard control
- The ranked order of risk reduction: eliminate the hazard, substitute it, apply engineering controls, then administrative controls, with personal protective equipment last because it protects only the wearer.
- Confined space entry
- Entry into a space with restricted access not meant for continuous occupancy. It requires a permit, atmospheric testing for oxygen and toxic or flammable gas, a standby person, and a rescue plan.
- Lockout and tagout
- Isolating energy sources before maintenance by closing valves, locking them, attaching a warning tag, then draining and verifying zero energy so the line cannot be re-energized unexpectedly.
- Hydrogen sulfide hazard
- A toxic gas found in sewers and pits. It is heavier than air, and at higher concentrations it deadens the sense of smell, so odour must never be used as a warning.
- Manual handling limit
- Keep loads close to the body and avoid twisting. Loads above roughly 25 kg generally require a two-person lift or a mechanical aid, depending on local regulation.
- Pipe wrench jaw direction
- Set the jaws so that pulling the handle drives the teeth into the pipe. Reversing the hook jaw suits the working direction, and cheater bars on the handle are prohibited.
- Hacksaw blade selection
- Choose teeth per inch by wall thickness: coarse blades for thick steel or copper, fine blades for thin-wall tube and plastic. At least three teeth should touch the work.
- RCD and GFCI protection
- A residual current or ground fault device that trips on leakage current to earth. It is required on portable electric tools used on site and should be tested before each use.
- Soldering versus brazing
- Soldering uses filler melting below 450 degrees Celsius; brazing uses filler melting above it, giving a stronger joint for higher temperatures and pressures.
- Tool pre-use inspection
- Checking guards, insulation, leads, plugs, and calibration before use. A damaged tool is tagged out of service and removed from the work area rather than used cautiously.
- Drawing scale
- The ratio of a drawn length to the real length, such as 1:50. Measure with the scale bar printed on the sheet rather than assuming a scale.
- Riser diagram purpose
- A schematic, not-to-scale drawing showing pipe sizes, fixture connections, vents, and floor levels in a vertical stack. It does not give horizontal distances.
- Revision table
- The block on a drawing listing revision letters, dates, and descriptions of changes. Always confirm the current revision before setting out or cutting material.
- Request for information
- A formal query raised when drawings and specifications conflict or details are missing. Work should not proceed on an assumption while the answer is pending.
- Hidden line convention
- A dashed line on a drawing showing construction that is concealed from the current view, such as pipe buried in a wall or passing under a floor slab.
- Nominal pipe size
- A size label that is neither the true outside nor inside diameter for all schedules. Outside diameter is fixed per nominal size, while inside diameter changes with wall thickness.
- 45-degree offset travel
- For a 45-degree offset, travel equals the offset multiplied by 1.414. Subtract the fitting take-out of each 45-degree elbow to obtain the cut length.
- Fitting take-out
- The distance from the centre of a fitting to its face. Cut length equals the centre-to-centre measurement minus the take-out at each end of the pipe run.
- Fall calculation
- Fall equals run length multiplied by the gradient. A 12 m run at 1:60 falls 12 divided by 60, which is 0.2 m or 200 mm.
- Waste allowance
- Extra material added to a take-off to cover cutting losses and offcuts. About 5 percent suits straight runs, and about 10 percent suits complex fabrication.
- 3-4-5 squaring method
- A layout check using a triangle with sides in the ratio 3:4:5, which has a right angle between the short sides. Used to square a setting-out line.
- Deburring copper tube
- Removing the internal and external burr left by a wheel cutter. An internal burr disturbs flow, causes noise, and can lead to erosion-corrosion at the joint.
- Capillary solder joint
- A joint where molten solder is drawn into the narrow gap between tube and fitting by capillary action. Clean surfaces, flux, even heat, and the right gap are essential.
- Standard pipe thread taper
- Tapered threads with a 1:16 taper, about 1.8 degrees. Hand-tight engagement is roughly three threads, and wrench-tight engagement is five to six threads.
- Solvent welding sequence
- Cut square, chamfer, clean with primer, apply cement to both surfaces, assemble with a quarter turn, and hold until set. Cure time increases with diameter and cold weather.
- Pipe bending gain
- The difference between the sum of the two leg lengths and the developed length of the bend. It must be allowed for when calculating the cut length.
- Backflow prevention hierarchy
- An air gap gives the highest protection, followed by a reduced-pressure zone assembly, then a double check valve. A single check valve is not adequate for high hazard.
- Trap seal depth
- The water depth in a fixture trap, typically 50 to 75 mm. It must be deep enough to resist pressure fluctuations and shallow enough to be cleared easily.
- Vent stack function
- A vertical pipe carrying air to the drainage system, protecting trap seals from siphonage and allowing sewer gases to discharge above the roof rather than into the building.
- Drainage test before concealment
- A water or air test of the drainage system carried out before pipes are covered. Results are recorded and defects corrected before the work is closed in.
- Pressure-reducing valve setting
- A valve that lowers supply pressure to a set downstream value, commonly around 300 to 500 kPa. A strainer is fitted upstream and expansion relief downstream on closed systems.
- Trap primer purpose
- A device that adds water to a floor drain trap to replace evaporation. Without it the seal is lost and sewer gas enters the building.
- Temperature and pressure relief valve
- A safety valve on a water heater that opens on excess temperature or pressure. It is piped to a safe discharge point and must never be plugged or capped.
- Flush valve supply requirement
- A flush valve needs a minimum supply pressure and flow stated by the manufacturer. Insufficient pressure causes weak flushing and repeated callbacks.
- Grab bar anchorage
- Grab bars must be fixed into structural framing or installed blocking, not into drywall alone, because they carry the full body weight of a person losing balance.