A four-person crew is converting a basement pump room in an occupied six-storey office into a sump pit. The pit is 1.2 m deep and 0.8 m wide, left open overnight with about 150 mm of stagnant water at the bottom. A gasoline-powered transfer pump runs beside the pit; its exhaust discharges inside the room. The only outside opening is a stair door roughly 8 m away. A temporary 230 V extension cord crosses the wet floor to a clip-on light, and the cord's outer insulation is nicked about 300 mm from the plug. At 10:15 a.m. a helper reports headache and dizziness. The leadman wants the crew to finish pouring the 100 mm pit base before lunch. There is no gas monitor on site, and the permit-to-work book is in the site office. The basement has no mechanical ventilation, and other trades are working 15 m away.

1. List the immediate actions you would take in the first 10 minutes, in priority order, and explain the reasoning behind the order.

Read the worked answer

Priority is life safety, then ignition and exposure control, then property and schedule.

  1. Stop all work and tell everyone to leave the basement by the nearest exit. Do not send anyone back for tools.
  2. Move the affected helper to fresh air, keep him seated, and call emergency services; do not let him drive. Note the time and symptoms.
  3. From outside the space, shut off the gasoline pump if it can be done without entering; do not operate electrical switches or the extension cord in the basement.
  4. Barricade the stair door and post a standby person. No re-entry until the air is tested and the source is controlled.
  5. Notify the site safety officer and building manager; isolate the temporary power at the panel.

Reasoning: carbon monoxide from the pump is the likely cause of the headache and dizziness, and the damaged cord adds shock and ignition risk. Rescue must not create a second casualty. The schedule is irrelevant until the atmosphere is proven safe.

2. Identify four hazards in the setup and match each with a control, stating where the control sits in the hierarchy of controls.

Read the worked answer

Four hazards and controls, in hierarchy order:

  • Carbon monoxide from the gasoline pump (eliminate/substitute): remove the pump from the room and use an electric transfer pump supplied from a GFCI-protected circuit, or pipe the exhaust outdoors. This eliminates the source rather than masking it.
  • Damaged extension cord on wet floor (eliminate/engineering): remove the cord from service, inspect and tag it, use a GFCI and cable ramps, and keep connections out of water. Replacing the cord is an engineering control; wearing rubber gloves alone is not enough.
  • Open pit (engineering): fit rigid guardrails and toe boards or a load-rated cover, and mark the opening. A barricade is not a substitute for a cover when materials are being moved.
  • Stagnant water and biological growth (administrative/PPE): pump out, clean and disinfect, provide wash facilities, and issue gloves and boots. PPE is last because it does not remove the exposure.

Housekeeping and a pre-task briefing support all four, but they do not replace the higher-order controls.

3. What must be verified before work resumes, and what records would you require?

Read the worked answer

Before resumption I would require: a gas test for carbon monoxide, oxygen and flammable gas at the bottom and at breathing height, recorded by a competent person; mechanical ventilation running long enough to clear the space; the gasoline pump removed and the temporary power inspected; guardrails or a cover on the pit; a permit-to-work signed by the site safety officer; a rescue plan and a standby person; and a toolbox talk covering the incident. The helper should not return until medically cleared.

Records: incident report, gas test log, electrical inspection tag, permit, corrected housekeeping checklist, and the names of the persons who authorized re-entry. If the atmosphere cannot be maintained, the work should be re-planned, not rushed.