Plumbing NC II study materials
Plumbing NC II study resources

Plumbing NC II study plan

Plumbing NC II · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Cutting, threading, bending, and joining of pipes and fittings & Installation of sanitary drainage, waste, and vent (DWV) piping systems

  • Identify and classify pipes by material (PVC, PPR, copper, galvanized iron) and schedule, and state the correct cutting and joining method for each.

  • Demonstrate the safe setup and use of a pipe cutter, hacksaw, and threading die on at least three pipe sizes.

  • Calculate and cut pipe lengths for a given DWV layout using a cutting list, allowing for fitting allowances.

  • Assemble a mock DWV branch with solvent-cemented PVC fittings, ensuring correct slope and alignment.

Your checkpoint

A labeled photo or sketch of a completed 1-meter DWV mock-up with a cutting list and a one-page method statement for cutting and joining.

Week 2

Cutting, threading, bending, and joining of pipes and fittings & Installation of water supply and distribution piping systems

  • Thread galvanized iron pipe (½" to 1") using a manual die and assemble a leak-free joint with fittings.

  • Bend copper tube (soft and hard) using a spring bender and a lever bender without kinking, and join with solder or press fittings.

  • Install a 3-meter water supply line with elbows, tees, and reducers, applying correct support spacing and protection.

  • Pressure-test the assembled water line at 1.5 times working pressure and document any leaks and repairs.

Your checkpoint

A pressure-test log with initial and final readings, a photo of the installed line, and a list of tools used with safety notes.

Week 3

Installation of water supply and distribution piping systems & Installation of sanitary drainage, waste, and vent (DWV) piping systems

  • Interpret a simple isometric plumbing plan and transfer pipe routes to a wall mock-up.

  • Install a water distribution system with a manifold or trunk-and-branch layout, including isolation valves and air chambers.

  • Install a DWV system with proper venting (individual and common vent) and check slope using a level.

  • Perform a smoke or water test on the DWV system and record results.

Your checkpoint

A marked-up isometric drawing showing actual installed routes, plus a test report for both water and DWV systems.

Week 4

Interpretation of technical drawings, plans, and specifications & Measurement, layout, and marking out of plumbing works

  • Read and extract dimensions, symbols, and notes from a residential plumbing plan and specification sheet.

  • Set out a bathroom group on a floor layout using a tape measure, chalk line, and laser level, marking fixture centerlines.

  • Calculate pipe lengths and fitting allowances from a plan and prepare a material take-off list.

  • Verify layout accuracy by checking squareness, parallelism, and elevation against the plan.

Your checkpoint

A dimensioned floor layout sketch with a material take-off list and a checklist of layout verification steps.

Week 5

Installation and testing of plumbing fixtures, appliances, and accessories & Maintenance, repair, and troubleshooting of plumbing systems

  • Install a water closet, lavatory, and floor drain according to manufacturer instructions and local code, ensuring proper sealing and clearance.

  • Test fixture operation (flush, flow, drainage) and adjust water levels and connections.

  • Diagnose and repair a leaking faucet, a running toilet, and a clogged drain using appropriate tools and methods.

  • Document a maintenance procedure for a sump pump or water heater.

Your checkpoint

A fixture installation checklist with photos and a troubleshooting log describing three common faults, causes, and corrective actions.

Week 6

Occupational Health and Safety (OHS) and housekeeping procedures & Selection, handling, and preparation of plumbing tools, materials, and fittings

  • Identify personal protective equipment (PPE) for plumbing tasks and demonstrate correct donning and doffing.

  • Conduct a hazard assessment of a simulated work area and propose control measures for at least five hazards.

  • Select and inspect hand and power tools for damage, and perform routine maintenance (e.g., oiling, blade replacement).

  • Demonstrate proper housekeeping and waste segregation after a task.

Your checkpoint

A completed hazard assessment form and a tool inspection checklist with photos of a clean work area.

Week 7

Cutting, threading, bending, and joining of pipes and fittings & Installation of water supply and distribution piping systems & Installation of sanitary drainage, waste, and vent (DWV) piping systems

  • Integrate water supply and DWV rough-in for a half-bath, coordinating pipe routes to avoid conflicts.

  • Perform a combined pressure and DWV test, and record results.

  • Resolve a pipe routing conflict by adjusting layout while maintaining code-required slopes and clearances.

  • Prepare a bill of materials for the half-bath rough-in.

Your checkpoint

A rough-in package including photos, test records, and a bill of materials with quantities and unit costs.

Week 8

Occupational Health and Safety (OHS) and housekeeping procedures & Interpretation of technical drawings, plans, and specifications & Measurement, layout, and marking out of plumbing works & Selection, handling, and preparation of plumbing tools, materials, and fittings & Cutting, threading, bending, and joining of pipes and fittings & Installation of water supply and distribution piping systems & Installation of sanitary drainage, waste, and vent (DWV) piping systems & Installation and testing of plumbing fixtures, appliances, and accessories & Maintenance, repair, and troubleshooting of plumbing systems

  • Complete a timed mock exam covering all domains, with emphasis on heavy domains 5, 6, and 7.

  • Review incorrect answers and create a personal summary sheet of key formulas, code clauses, and procedures.

  • Practice a practical assessment: install and test a small plumbing assembly within a set time.

  • Finalize a toolbox of reference notes and checklists for exam day.

Your checkpoint

A scored mock exam with a correction log and a one-page quick-reference sheet.

Milestones

Week 2: Successfully cut, thread, and assemble a leak-free galvanized pipe joint and a soldered copper joint, verified by pressure test.

Week 4: Accurately interpret a plumbing plan to produce a material take-off and set out a bathroom group within ±5 mm tolerance.

Week 6: Complete a hazard assessment and tool inspection with no critical omissions, and demonstrate proper PPE use.

Week 8: Score at least 80% on the mock exam and complete a practical assembly within the allotted time with no leaks.