PCATP Town Planner study materials
PCATP Town Planner study resources

PCATP Town Planner cheat sheet

PCATP Town Planner · Keep the key ideas within reach.

Quick reference

Town Planning

  • Land-use zoning separates permitted uses (as of right) from conditional uses requiring discretionary approval; nonconforming uses predate the regulation and are typically allowed to continue but not expand.

  • FAR (floor area ratio) = total gross floor area ÷ plot area; coverage = footprint area ÷ plot area. FAR governs building bulk, coverage governs ground-level open space.

  • Standard density measure is dwelling units per hectare (du/ha); gross density includes roads and open space, net density excludes them, so gross is always lower than net for the same scheme.

  • The planning hierarchy runs national/provincial policy → regional or district plan → local/master plan → zoning or scheme regulations → subdivision and building permits.

  • EIA screening decides whether a project needs full assessment; scoping defines the terms of reference; the environmental management plan is the binding mitigation instrument.

  • Public participation requirements typically include notice, comment periods, and a public hearing; failure to follow statutory consultation can invalidate an approval on appeal.

  • Hierarchy of settlements follows central place logic: higher-order centres offer rarer services and draw from larger catchments; lower-order centres provide convenience goods.

  • Transit-oriented development concentrates higher density and mixed use within roughly 400-800 m walking distance of a station, the accepted comfortable walking catchment.

  • Development control tests a proposal against zoning, plot ratio, setbacks, height limits, parking minimums, and access standards before permit issue.

Quick reference

Architecture

  • Building envelope performance is governed by U-value (thermal transmittance, W/m²K); lower U-value means better insulation. Glazing U-values and solar heat gain coefficient are assessed separately.

  • Means of escape: travel distance limits, protected stairways, and exit widths are set by occupant load; exit width is sized per person served, not per floor area alone.

  • Fire compartmentation limits spread by area and by use; fire resistance ratings (e.g. 60/90/120 minutes) apply to walls, floors, and doors on compartment boundaries.

  • Accessibility standards require an accessible route, minimum clear door widths, turning circles, and gradient limits on ramps, with level landings at intervals.

  • Structural span rules of thumb: reinforced concrete slabs are economical up to about 6-8 m; steel or post-tensioned systems extend clear spans further.

  • Daylight and ventilation are regulated by window-to-floor-area ratios and openable area percentages; internal rooms without openings require mechanical alternatives.

  • Universal design principles: equitable use, flexibility, simple and intuitive use, perceptible information, tolerance for error, low physical effort, size and space for approach.

  • Site planning sets building line (setback from street), side and rear setbacks, and plot coverage; these control privacy, daylight, and street enclosure.

Quick reference

Registration and Professional Practice

  • Registration is a statutory function: only a registered planner may use the protected title and sign statutory planning instruments; practising without registration is an offence.

  • Continuing professional development (CPD) is a condition of annual renewal; a typical requirement is a set number of hours or points per year, with a portion in core planning topics.

  • Professional indemnity insurance covers negligent advice; it is claims-made, so cover must be in force when the claim is made, not when the work was done.

  • A code of conduct typically binds members to competence, honesty, disclosure of conflicts of interest, confidentiality, and reporting of unethical conduct.

  • Fees are commonly charged by time (hourly rate × hours), by lump sum, or as a percentage of project value; scope and exclusions must be documented in the engagement.

  • Disciplinary process generally runs complaint → investigation → hearing by a disciplinary tribunal → sanction ranging from caution to deregistration.

  • Conflict of interest rule: declare the interest, withdraw from the decision, and record the declaration; undisclosed interest can void the decision.

  • Professional negligence requires a duty of care, breach of that duty, causation, and actual loss; documented advice and file notes are the primary defence.

Quick reference

Validation and Accreditation

  • Validation is the process of confirming that a planning application is complete and correct before it enters assessment; invalid applications are returned, not determined.

  • Accreditation of a planning programme requires evidence of curriculum coverage, qualified staff, adequate resources, and a structured practical or studio component.

  • Programmes are typically accredited for a fixed cycle (often 3-5 years), with a progress report and a full re-accreditation review at the end of the cycle.

  • Learning outcomes are mapped to a competency framework; each outcome must be evidenced by assessment, not merely taught.

  • External examiners or accreditation panel members provide independent verification of standards and assessment integrity.

  • Substantial equivalence is used for overseas qualifications: a qualification is recognised if its outcomes match the accredited standard, even if the structure differs.

  • Graduate attributes usually include communication, research, ethical practice, sustainability awareness, and teamwork, assessed through portfolio or capstone work.

  • An accreditation panel report identifies commendations, conditions, and recommendations; conditions must be met within a stated timeframe or accreditation lapses.