PCATP Town Planner flashcards
PCATP Town Planner · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Floor Area Ratio
- Total gross floor area of all buildings on a plot divided by the plot area. It caps overall building bulk regardless of how many storeys are used.
- Plot Coverage
- The proportion of a plot covered by building footprint at ground level. It controls open space, drainage, and daylight at street level, independent of building height.
- Nonconforming Use
- A land use that lawfully existed before a zoning regulation made it non-permitted. It may usually continue but cannot be enlarged or re-established after abandonment.
- Conditional Use
- A use permitted in a zone only after discretionary review and approval, because its impacts depend on site-specific design, location, and mitigation measures.
- Gross vs Net Density
- Gross density counts all land including roads and open space; net density counts only developable residential land. Net density is therefore always the higher figure.
- Transit-Oriented Development
- Higher-density, mixed-use development concentrated within roughly 400 to 800 metres of a transit station, designed for walking and reduced car dependence.
- Environmental Impact Assessment
- A structured process of predicting environmental effects before approval. Screening decides if it is needed; scoping sets its terms of reference.
- Development Control
- The regulatory process that tests a development proposal against zoning, plot ratio, setbacks, height, parking, and access standards before granting a permit.
- U-Value
- Thermal transmittance of a building element in watts per square metre per kelvin. A lower U-value indicates better insulation performance.
- Means of Escape
- The protected routes, stairways, and exit widths that let occupants reach a place of safety. Widths are sized from occupant load, not floor area alone.
- Fire Compartmentation
- Division of a building into fire-resisting zones by rated walls, floors, and doors, limiting the spread of fire and smoke for a specified period.
- Accessible Route
- A continuous path free of steps and obstructions, with compliant clear widths, gradients, and level landings, connecting entrances to all usable spaces.
- Window-to-Floor Ratio
- The area of glazing expressed as a percentage of the floor area it serves, used to regulate daylight and sometimes natural ventilation in habitable rooms.
- Universal Design
- Design usable by everyone regardless of age or ability, based on equitable use, flexibility, simplicity, perceptible information, error tolerance, low effort, and adequate space.
- Building Line
- The minimum required distance between a building facade and the street boundary. It shapes street enclosure, privacy, and daylight access.
- Economical Concrete Span
- Reinforced concrete floor slabs are generally economical up to about six to eight metres. Longer clear spans usually favour steel or post-tensioned systems.
- Protected Title
- A professional designation that only registered persons may lawfully use. Using it without registration is a statutory offence in most jurisdictions.
- Continuing Professional Development
- Ongoing learning required to maintain registration. A set number of hours or points per year must be logged, partly in core planning topics.
- Professional Indemnity Insurance
- Cover protecting a practitioner against claims of negligent advice. It is claims-made, so cover must be active when the claim arises.
- Conflict of Interest
- A personal or financial interest that could bias professional judgement. It must be declared, and the affected decision-maker must withdraw from the decision.
- Professional Negligence
- A claim requiring a duty of care, a breach of that duty, causation, and actual loss. Contemporaneous file notes are the primary defence.
- Disciplinary Tribunal
- The body that hears complaints against registered practitioners and may impose sanctions from caution and conditions through to suspension or deregistration.
- Lump Sum Fee
- A fixed price agreed for a defined scope of professional work. Scope, assumptions, and exclusions must be documented, since variations are charged separately.
- Validation of Application
- The check that a planning application is complete and correct before assessment begins. Invalid applications are returned rather than determined.
- Accreditation Cycle
- The fixed period, commonly three to five years, for which a planning programme is accredited, ending in a full re-accreditation review.
- Learning Outcome Mapping
- Matching each programme outcome to a professional competency and showing the assessment that evidences it, rather than merely claiming it is taught.
- Substantial Equivalence
- Recognition of an overseas qualification whose outcomes match the accredited standard, even though its structure or duration differs from the domestic programme.
- External Examiner
- An independent academic or practitioner who reviews standards and assessment integrity, providing external verification for accreditation panels.
- Accreditation Conditions
- Requirements imposed by a panel that must be met within a stated timeframe. Failure to satisfy them can result in lapse of accreditation.
- Graduate Attributes
- The transferable capabilities a programme guarantees, typically communication, research, ethical practice, sustainability awareness, and teamwork, evidenced through portfolios or capstone work.
- Studio Component
- A structured practical design or planning class where students apply theory to a real or simulated project, commonly required for programme accreditation.