Rescue 1122 EMT study materials
Rescue 1122 EMT study resources

Rescue 1122 EMT cheat sheet

Rescue 1122 EMT · Keep the key ideas within reach.

Quick reference

Ambulance Service - Medical Emergencies and Pre-hospital Care

  • Primary survey sequence is catastrophic-haemorrhage control, Airway with cervical-spine protection, Breathing, Circulation, Disability (GCS/pupils/glucose), Exposure with temperature control; reassess after every intervention.

  • Adult compression standards: rate 100–120/min, depth 5–6 cm, full recoil, minimise pauses to under 10 seconds; compression-to-ventilation ratio 30:2 for one- or two-rescuer adult BLS.

  • Paediatric CPR: 15:2 for two rescuers (30:2 for a lone rescuer), rate 100–120/min, depth about one-third of chest anteroposterior diameter; start with 5 rescue breaths in asphyxial arrest.

  • Defibrillation is indicated for ventricular fibrillation and pulseless ventricular tachycardia only; give one shock then immediately resume compressions for 2 minutes before rhythm recheck.

  • Adrenaline (epinephrine) in adult cardiac arrest: 1 mg IV/IO of 1:10,000 every 3–5 minutes; amiodarone 300 mg IV/IO after the third shock for refractory VF/pVT.

  • Anaphylaxis: intramuscular adrenaline 0.5 mg (0.5 mL of 1:1000) adult into the anterolateral thigh, repeat every 5 minutes as needed; adjuncts are antihistamine and steroid after adrenaline.

  • Hypoglycaemia: if conscious and able to swallow, give 15–20 g oral glucose and recheck after 15 minutes; if unconscious, give IV glucose or IM glucagon and never give oral fluids.

  • Stroke screen (FAST: Face, Arm, Speech, Time) plus documented onset time; keep oxygen saturation 94–98% and avoid routine high-flow oxygen in non-hypoxic patients.

  • Burn estimate by Wallace rule of nines: each arm 9%, each leg 18%, anterior trunk 18%, posterior trunk 18%, head 9%, perineum 1%; use the patient's palm as about 1% for scattered burns.

Quick reference

Rescue Service - Specialised Rescue Operations

  • Scene safety precedes rescue: apply the hierarchy self-rescue, then reach/throw, then boat, then swim entry with flotation; an untethered rescuer entering water is a last resort.

  • Confined-space entry requires permit control, atmospheric testing for oxygen, flammable gas and toxic gas before entry, continuous ventilation, a harnessed entrant, attendant and retrieval line.

  • Rope rescue systems are rated by safety factor: two-rope (main and belay) systems for human loads; anchor strength target is at least 15 kN per anchor for life-safety systems.

  • Structural collapse marking uses a marking system on a prominent surface recording team identity, date and time of entry and exit, hazards found, and number of live and dead victims located.

  • Vehicle extrication order: stabilise the vehicle, disconnect the battery, then create space by door removal, roof flap or dash roll; glass management precedes patient contact with sharp edges.

  • Trench and excavation rescue: spoil pile must be set back at least the depth of the trench or 1 m minimum, and shoring or trench boxes are required before entry; never enter an unshored trench.

  • Swiftwater rescue priorities are self, team, then victim; use upstream spotters, throw bags with a floating rope, and defensive swimming with feet downstream and body angled toward the current.

  • Water rescue personal protective equipment includes a personal flotation device with a whistle and knife, helmet, and thermal protection; a throw bag line should be at least 15–25 m of floating rope.

  • High-angle lowering uses a friction device with a backup belay; the descent rate is controlled by the belayer, and the litter attendant maintains a separate attachment to the main line.

Quick reference

Fire Service - Firefighting and Hazardous Materials Incidents

  • Fire tetrahedron components are fuel, oxygen, heat and the uninhibited chemical chain reaction; removal of any one component extinguishes combustion.

  • Fire classes: A ordinary combustibles (water, foam), B flammable liquids (foam, dry chemical, CO2), C energised electrical (CO2, dry chemical, never water), D combustible metals (dry powder), F/K cooking oils (wet chemical).

  • Flashover indicators include high heat with rollover of flame in the smoke layer, smoke igniting at openings, and a rapid rise in temperature; evacuation and cooling from outside are indicated.

  • Backdraft indicators are smoke-stained windows, little visible flame, inward-pulling air and high heat; ventilate at the highest point only after charged lines are in place.

  • PASS for extinguisher use: Pull the pin, Aim at the base of the fire, Squeeze the handle, Sweep side to side; a 9 kg dry-powder unit discharges in roughly 10–20 seconds.

  • Hazardous materials recognition uses placards, UN numbers, container shape and shipping papers; the ERG guide number gives isolation distance and protective action for the material.

  • Initial isolation for an unknown hazardous material release is at least 50 m in all directions; for a visible vapour cloud or fire, isolate 100 m and evacuate downwind.

  • Structural firefighting PPE ensemble includes helmet, hood, turnout coat and trousers, gloves, and self-contained breathing apparatus; SCBA is required in any immediately dangerous to life or health atmosphere.

  • Fire ground water supply: a standard 45 mm attack line flows roughly 200–250 L/min at the nozzle; pump discharge pressure equals nozzle pressure plus friction loss plus elevation loss.

Quick reference

Community Safety - Prevention, Education and Public Preparedness

  • Community risk reduction cycle: identify hazards, assess risk, plan interventions, implement, then monitor and evaluate; the loop repeats with updated data.

  • Home safety visit checklist covers working smoke alarms on every level, carbon monoxide alarms near sleeping areas, escape routes, electrical overload, and safe storage of medicines and fuels.

  • Smoke alarm placement: on each level, inside each bedroom and outside sleeping areas, mounted on the ceiling at least 10 cm from the wall, tested monthly and replaced every 10 years.

  • Drowning prevention layers are supervision, barriers around water, swimming and rescue skills, and emergency response; children under five require arm's-reach supervision.

  • Road safety interventions with proven effect include speed-limit enforcement, seat-belt and helmet laws, child restraint use, and separation of pedestrians and cyclists from traffic.

  • Emergency preparedness for households: a grab bag with water, food, torch, radio, first-aid kit, medicines and documents, plus a family meeting point and out-of-area contact.

  • Risk communication should be timely, accurate, consistent and actionable; messages name the hazard, the affected area, the action required and the time window for that action.

  • Community first-aid training targets bystander action: recognising cardiac arrest, calling the emergency number, starting compressions, controlling bleeding and relieving choking.

Quick reference

Building Safety and Integrated Emergency Management

  • Means of egress comprises exit access, the exit and exit discharge; travel distance and exit width are calculated from occupant load and the building's occupancy classification.

  • Occupant load is floor area divided by the occupant-load factor for the occupancy; required exit width derives from occupant load multiplied by unit width per person (commonly 5 mm per person).

  • Fire-resistance ratings are expressed in minutes or hours and apply to structural elements, compartment walls, doors and shafts; openings are protected by fire-rated doors with self-closing devices.

  • Active fire protection includes detection, alarm, sprinklers and smoke control; passive protection includes compartmentation, fire doors, protected escape routes and structural fire resistance.

  • Emergency management cycle: mitigation, preparedness, response and recovery; mitigation reduces risk before an event, recovery restores function after it.

  • Incident Command System structure: incident commander, operations, planning, logistics, finance/administration; span of control is kept to roughly three to seven subordinates.

  • Fire safety audits check escape routes clear and unobstructed, exit signs illuminated, extinguishers serviced and tagged, alarms tested, and records of drills and maintenance kept.

  • Building evacuation strategy is either total simultaneous evacuation or phased evacuation by zone; defend-in-place is used where occupants cannot be moved safely, such as hospitals.

  • Post-incident review documents timeline, decisions, resource use and lessons learned, and feeds corrective actions back into the mitigation and preparedness phases.

Quick reference

Ambulance Service - Medical Emergencies and Pre-hospital Care

  • Primary survey sequence is catastrophic-haemorrhage control, Airway with cervical-spine protection, Breathing, Circulation, Disability (GCS/pupils/glucose), Exposure with temperature control; reassess after every intervention.

  • Adult compression standards: rate 100–120/min, depth 5–6 cm, full recoil, minimise pauses to under 10 seconds; compression-to-ventilation ratio 30:2 for one- or two-rescuer adult BLS.

  • Paediatric CPR: 15:2 for two rescuers (30:2 for a lone rescuer), rate 100–120/min, depth about one-third of chest anteroposterior diameter; start with 5 rescue breaths in asphyxial arrest.

  • Defibrillation is indicated for ventricular fibrillation and pulseless ventricular tachycardia only; give one shock then immediately resume compressions for 2 minutes before rhythm recheck.

  • Anaphylaxis: intramuscular adrenaline 0.5 mg (0.5 mL of 1:1000) adult into the anterolateral thigh, repeat every 5 minutes as needed; adjuncts are antihistamine and steroid after adrenaline.

  • Hypoglycaemia: if conscious and able to swallow, give 15–20 g oral glucose and recheck after 15 minutes; if unconscious, give IV glucose or IM glucagon and never give oral fluids.

  • Stroke screen (FAST: Face, Arm, Speech, Time) plus documented onset time; keep oxygen saturation 94–98% and avoid routine high-flow oxygen in non-hypoxic patients.

  • Burn estimate by Wallace rule of nines: each arm 9%, each leg 18%, anterior trunk 18%, posterior trunk 18%, head 9%, perineum 1%; use the patient's palm as about 1% for scattered burns.

Quick reference

Rescue Service - Specialised Rescue Operations

  • Scene safety precedes rescue: apply the hierarchy self-rescue, then reach/throw, then boat, then swim entry with flotation; an untethered rescuer entering water is a last resort.

  • Confined-space entry requires permit control, atmospheric testing for oxygen, flammable gas and toxic gas before entry, continuous ventilation, a harnessed entrant, attendant and retrieval line.

  • Rope rescue systems are rated by safety factor: two-rope (main and belay) systems for human loads; anchor strength target is at least 15 kN per anchor for life-safety systems.

  • Structural collapse marking uses a marking system on a prominent surface recording team identity, date and time of entry and exit, hazards found, and number of live and dead victims located.

  • Vehicle extrication order: stabilise the vehicle, disconnect the battery, then create space by door removal, roof flap or dash roll; glass management precedes patient contact with sharp edges.

  • Trench and excavation rescue: spoil pile must be set back at least the depth of the trench or 1 m minimum, and shoring or trench boxes are required before entry; never enter an unshored trench.

  • Swiftwater rescue priorities are self, team, then victim; use upstream spotters, throw bags with a floating rope, and defensive swimming with feet downstream and body angled toward the current.

  • Water rescue personal protective equipment includes a personal flotation device with a whistle and knife, helmet, and thermal protection; a throw bag line should be at least 15–25 m of floating rope.

  • High-angle lowering uses a friction device with a backup belay; the descent rate is controlled by the belayer, and the litter attendant maintains a separate attachment to the main line.

Quick reference

Fire Service - Firefighting and Hazardous Materials Incidents

  • Fire tetrahedron components are fuel, oxygen, heat and the uninhibited chemical chain reaction; removal of any one component extinguishes combustion.

  • Fire classes: A ordinary combustibles (water, foam), B flammable liquids (foam, dry chemical, CO2), C energised electrical (CO2, dry chemical, never water), D combustible metals (dry powder), F/K cooking oils (wet chemical).

  • Flashover indicators include high heat with rollover of flame in the smoke layer, smoke igniting at openings, and a rapid rise in temperature; evacuation and cooling from outside are indicated.

  • Backdraft indicators are smoke-stained windows, little visible flame, inward-pulling air and high heat; ventilate at the highest point only after charged lines are in place.

  • PASS for extinguisher use: Pull the pin, Aim at the base of the fire, Squeeze the handle, Sweep side to side; a 9 kg dry-powder unit discharges in roughly 10–20 seconds.

  • Hazardous materials recognition uses placards, UN numbers, container shape and shipping papers; the ERG guide number gives isolation distance and protective action for the material.

  • Initial isolation for an unknown hazardous material release is at least 50 m in all directions; for a visible vapour cloud or fire, isolate 100 m and evacuate downwind.

  • Structural firefighting PPE ensemble includes helmet, hood, turnout coat and trousers, gloves, and self-contained breathing apparatus; SCBA is required in any immediately dangerous to life or health atmosphere.

  • Fire ground water supply: a standard 45 mm attack line flows roughly 200–250 L/min at the nozzle; pump discharge pressure equals nozzle pressure plus friction loss plus elevation loss.

Quick reference

Community Safety - Prevention, Education and Public Preparedness

  • Community risk reduction cycle: identify hazards, assess risk, plan interventions, implement, then monitor and evaluate; the loop repeats with updated data.

  • Home safety visit checklist covers working smoke alarms on every level, carbon monoxide alarms near sleeping areas, escape routes, electrical overload, and safe storage of medicines and fuels.

  • Smoke alarm placement: on each level, inside each bedroom and outside sleeping areas, mounted on the ceiling at least 10 cm from the wall, tested monthly and replaced every 10 years.

  • Drowning prevention layers are supervision, barriers around water, swimming and rescue skills, and emergency response; children under five require arm's-reach supervision.

  • Road safety interventions with proven effect include speed-limit enforcement, seat-belt and helmet laws, child restraint use, and separation of pedestrians and cyclists from traffic.

  • Emergency preparedness for households: a grab bag with water, food, torch, radio, first-aid kit, medicines and documents, plus a family meeting point and out-of-area contact.

  • Risk communication should be timely, accurate, consistent and actionable; messages name the hazard, the affected area, the action required and the time window for that action.

  • Community first-aid training targets bystander action: recognising cardiac arrest, calling the emergency number, starting compressions, controlling bleeding and relieving choking.

Quick reference

Building Safety and Integrated Emergency Management

  • Means of egress comprises exit access, the exit and exit discharge; travel distance and exit width are calculated from occupant load and the building's occupancy classification.

  • Occupant load is floor area divided by the occupant-load factor for the occupancy; required exit width derives from occupant load multiplied by unit width per person (commonly 5 mm per person).

  • Fire-resistance ratings are expressed in minutes or hours and apply to structural elements, compartment walls, doors and shafts; openings are protected by fire-rated doors with self-closing devices.

  • Active fire protection includes detection, alarm, sprinklers and smoke control; passive protection includes compartmentation, fire doors, protected escape routes and structural fire resistance.

  • Emergency management cycle: mitigation, preparedness, response and recovery; mitigation reduces risk before an event, recovery restores function after it.

  • Incident Command System structure: incident commander, operations, planning, logistics, finance/administration; span of control is kept to roughly three to seven subordinates.

  • Fire safety audits check escape routes clear and unobstructed, exit signs illuminated, extinguishers serviced and tagged, alarms tested, and records of drills and maintenance kept.

  • Building evacuation strategy is either total simultaneous evacuation or phased evacuation by zone; defend-in-place is used where occupants cannot be moved safely, such as hospitals.

  • Post-incident review documents timeline, decisions, resource use and lessons learned, and feeds corrective actions back into the mitigation and preparedness phases.