PMI-PBA · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Needs Assessment

  • Map every Needs Assessment task in the ECO to a one-line definition in your own words

  • Distinguish business problem/opportunity statements from solution requirements using 5 self-written examples

  • Identify stakeholder types and classify them by influence and impact for two sample scenarios

  • Draft a stakeholder engagement approach outline for a mock project

Your checkpoint

A one-page Needs Assessment task map plus a 10-row stakeholder classification table for a self-chosen mock project

Week 2

Needs Assessment & Analysis

  • Write 15 elicitation questions that separate business needs from user wants

  • Compare at least four elicitation techniques (interview, workshop, observation, document analysis) on cost, risk, and best-fit situations

  • Produce a business case skeleton with problem, options, benefits, and recommendation

  • Diagnose three poorly written requirement statements and rewrite each into a testable form

Your checkpoint

An elicitation toolkit sheet (technique comparison matrix + 15 questions) and a business case skeleton with rewritten requirements

Week 3

Analysis

  • Classify 20 mixed sample requirements as business, stakeholder, functional, nonfunctional, or transition

  • Model one process using a swimlane-style narrative and one set of decision rules in text form

  • Decompose a solution scope into at least 12 candidate requirements with acceptance criteria

  • Apply prioritization logic to rank 10 requirements and justify each rank

Your checkpoint

A requirements package for the mock project: 20 classified requirements, acceptance criteria, and a prioritized backlog with rationale

Week 4

Analysis & Traceability and Monitoring

  • Design a requirements traceability matrix linking business need to requirement to test case

  • Assign and document attributes (owner, status, priority, source) to every requirement in the package

  • Detect and correct three traceability gaps or orphan requirements in the matrix

  • Draft a change request workflow with impact analysis steps

Your checkpoint

A populated traceability matrix covering all requirements plus a written change control workflow

Week 5

Traceability and Monitoring & Planning

  • Define requirement baselines and state approval criteria for each baseline

  • Build a monitoring cadence that specifies review frequency, participants, and signals of drift

  • Draft a business analysis plan sections list and justify why each section earns its place

  • Write five testable verification criteria and match each to a requirement

Your checkpoint

A business analysis plan draft (sections plus approval gates) and a verification criteria checklist mapped to the matrix

Week 6

Planning & Evaluation

  • Sequence business analysis activities into a schedule with dependencies and estimated effort

  • Plan resource and stakeholder availability constraints for the mock project

  • Design a solution evaluation approach covering acceptance criteria, metrics, and defect triage

  • Create three acceptance test scenarios from requirement acceptance criteria

Your checkpoint

A BA activity schedule with dependencies plus a solution evaluation plan containing metrics and three test scenarios

Week 7

Evaluation & Needs Assessment

  • Assess solution performance against the original business need using a written gap analysis

  • List transition requirements and validate them against stakeholder readiness

  • Re-run needs assessment on the mock project to check whether the solution still serves the business problem

  • Summarize findings and recommend continue, adjust, or retire

Your checkpoint

A solution evaluation report with gap analysis, transition requirements, and a formal recommendation

Week 8

Needs Assessment & Planning & Analysis & Traceability and Monitoring & Evaluation

  • Complete two timed full-length practice sets and log every miss by domain and task

  • Rebuild a condensed one-page summary of all five domains from memory, then correct it against your notes

  • Re-drill the three weakest tasks until each is explained aloud without notes

  • Establish a final 48-hour review checklist for exam day logistics and concept refreshers

Your checkpoint

A scored practice-set log with a ranked weakness list and a finished one-page all-domain summary sheet

Milestones

Week 2: Can state the purpose of each Needs Assessment task and explain the business case to solution scope link without notes

Week 4: Traceability matrix is complete with zero orphan requirements, and all 20 mixed requirements are correctly classified

Week 6: Business analysis plan and evaluation plan are both drafted, and every acceptance test scenario maps to a requirement

Week 8: Practice-set scores show no domain below 70% and the three weakest tasks are explained aloud from memory