PMI-PBA study plan
PMI-PBA · Give each week a clear focus.
8 weeks · About 7 hours per week
Needs Assessment
Map every Needs Assessment task in the ECO to a one-line definition in your own words
Distinguish business problem/opportunity statements from solution requirements using 5 self-written examples
Identify stakeholder types and classify them by influence and impact for two sample scenarios
Draft a stakeholder engagement approach outline for a mock project
Your checkpoint
A one-page Needs Assessment task map plus a 10-row stakeholder classification table for a self-chosen mock project
Needs Assessment & Analysis
Write 15 elicitation questions that separate business needs from user wants
Compare at least four elicitation techniques (interview, workshop, observation, document analysis) on cost, risk, and best-fit situations
Produce a business case skeleton with problem, options, benefits, and recommendation
Diagnose three poorly written requirement statements and rewrite each into a testable form
Your checkpoint
An elicitation toolkit sheet (technique comparison matrix + 15 questions) and a business case skeleton with rewritten requirements
Analysis
Classify 20 mixed sample requirements as business, stakeholder, functional, nonfunctional, or transition
Model one process using a swimlane-style narrative and one set of decision rules in text form
Decompose a solution scope into at least 12 candidate requirements with acceptance criteria
Apply prioritization logic to rank 10 requirements and justify each rank
Your checkpoint
A requirements package for the mock project: 20 classified requirements, acceptance criteria, and a prioritized backlog with rationale
Analysis & Traceability and Monitoring
Design a requirements traceability matrix linking business need to requirement to test case
Assign and document attributes (owner, status, priority, source) to every requirement in the package
Detect and correct three traceability gaps or orphan requirements in the matrix
Draft a change request workflow with impact analysis steps
Your checkpoint
A populated traceability matrix covering all requirements plus a written change control workflow
Traceability and Monitoring & Planning
Define requirement baselines and state approval criteria for each baseline
Build a monitoring cadence that specifies review frequency, participants, and signals of drift
Draft a business analysis plan sections list and justify why each section earns its place
Write five testable verification criteria and match each to a requirement
Your checkpoint
A business analysis plan draft (sections plus approval gates) and a verification criteria checklist mapped to the matrix
Planning & Evaluation
Sequence business analysis activities into a schedule with dependencies and estimated effort
Plan resource and stakeholder availability constraints for the mock project
Design a solution evaluation approach covering acceptance criteria, metrics, and defect triage
Create three acceptance test scenarios from requirement acceptance criteria
Your checkpoint
A BA activity schedule with dependencies plus a solution evaluation plan containing metrics and three test scenarios
Evaluation & Needs Assessment
Assess solution performance against the original business need using a written gap analysis
List transition requirements and validate them against stakeholder readiness
Re-run needs assessment on the mock project to check whether the solution still serves the business problem
Summarize findings and recommend continue, adjust, or retire
Your checkpoint
A solution evaluation report with gap analysis, transition requirements, and a formal recommendation
Needs Assessment & Planning & Analysis & Traceability and Monitoring & Evaluation
Complete two timed full-length practice sets and log every miss by domain and task
Rebuild a condensed one-page summary of all five domains from memory, then correct it against your notes
Re-drill the three weakest tasks until each is explained aloud without notes
Establish a final 48-hour review checklist for exam day logistics and concept refreshers
Your checkpoint
A scored practice-set log with a ranked weakness list and a finished one-page all-domain summary sheet
Milestones
Week 2: Can state the purpose of each Needs Assessment task and explain the business case to solution scope link without notes
Week 4: Traceability matrix is complete with zero orphan requirements, and all 20 mixed requirements are correctly classified
Week 6: Business analysis plan and evaluation plan are both drafted, and every acceptance test scenario maps to a requirement
Week 8: Practice-set scores show no domain below 70% and the three weakest tasks are explained aloud from memory