PTCB HD study plan
PTCB HD · Give each week a clear focus.
8 weeks · About 6 hours per week
Engineering Controls
Define each major engineering control type (primary engineering control, secondary engineering control, external ventilation) and state its function in sterile compounding
Differentiate ISO classifications for the buffer area, ante area, and primary engineering control, and state the particle and air-change requirements for each
Diagram the airflow path from the primary engineering control through the secondary engineering control to the external environment
Identify the location and purpose of each pressure gauge, magnehelic gauge, and monitoring device in a compounding suite
Your checkpoint
One-page labeled diagram of a compliant compounding suite with ISO class, pressure relationship, and air-change rate annotated at each zone
Engineering Controls & Facility Cleaning
Explain certification and recertification intervals for primary and secondary engineering controls and list what is verified during certification
Describe daily, weekly, and monthly engineering-control checks (pressure differentials, temperature, humidity) and the action taken when a reading is out of range
Sequence the cleaning and disinfection steps for a primary engineering control from start to finish, including agent contact times
Distinguish the cleaning agents, disinfectants, and sporicidal agents used in sterile compounding and state when each is required
Your checkpoint
Written cleaning-and-disinfection procedure for a primary engineering control with correct agent order, contact times, and frequency
Facility Cleaning
Map the facility zones (unclassified, ante, buffer, segregated compounding area) and state the cleaning frequency and agents for each
Build a cleaning schedule table covering surfaces, floors, walls, ceilings, and equipment with assigned frequency and responsible role
Explain how to handle a spill, a visible contamination event, and a failed environmental monitoring result
Describe environmental monitoring sampling methods and the corrective action triggered by an out-of-limit result
Your checkpoint
Completed facility cleaning schedule table for all zones with frequency, agent, and documentation method for each surface category
Personal Protective Equipment (PPE)
Identify the required PPE for each compounding activity and state the order in which PPE is donned and doffed
Demonstrate correct gowning and gloving technique for sterile compounding, including hand hygiene steps before donning
Explain the standards for gloves, gowns, and masks used in hazardous and non-hazardous compounding
Describe how to inspect, replace, and dispose of PPE, including what to do if a glove is torn or a gown is compromised
Your checkpoint
Step-by-step donning-and-doffing checklist for sterile compounding PPE that you can self-audit against a practice run
Transport & Receiving
Describe receiving procedures for incoming shipments, including inspection, temperature verification, and quarantine of suspect items
Explain proper transport conditions for temperature-sensitive and hazardous preparations, including container integrity and labeling
Identify the documentation required at receiving and at handoff, and describe the chain-of-custody record
List the steps for handling a damaged shipment or a temperature excursion during transport
Your checkpoint
Receiving-and-transport flow document covering inspection, temperature check, documentation, and excursion handling in sequence
Dispensing Final Dosage Forms
Compare final dosage forms (solutions, suspensions, emulsions, ointments, suppositories, capsules) and state the preparation and handling considerations for each
Explain the steps for verifying a compounded preparation against the prescription, including ingredient, strength, and beyond-use date
Describe labeling requirements for dispensed final dosage forms, including required auxiliary and storage statements
Outline the final check process before release, including visual inspection and documentation of the compounded preparation
Your checkpoint
Final-check and release checklist template for a compounded preparation with all verification points and labeling requirements listed
Administrative & Transport & Receiving
Outline the elements of a standard operating procedure and draft the structure of one for a facility process
Describe the documentation and recordkeeping requirements for compounding, cleaning, and training records, including retention expectations
Explain personnel training and competency assessment requirements and how competency is documented
Identify the steps of a root-cause investigation and how corrective and preventive actions are documented
Your checkpoint
Draft one complete SOP (choose cleaning, receiving, or release) in standard format with purpose, scope, procedure, and documentation sections
Engineering Controls & Facility Cleaning & Personal Protective Equipment (PPE) & Transport & Receiving & Dispensing Final Dosage Forms & Administrative
Review all six domains using a self-made summary sheet of key numbers, intervals, and agent requirements
Complete timed practice sets weighted toward the highest-percentage domains and record your score by domain
Re-teach any domain scoring below 80% by rewriting its key facts from memory
Simulate exam-day conditions with one full-length timed practice session
Your checkpoint
Domain-by-domain score report from the final practice session with a written remediation note for every domain under 80%
Milestones
Week 2: Score at least 80% on a self-made 20-question quiz on engineering controls and cleaning fundamentals, with no notes
Week 4: Correctly perform the donning-and-doffing sequence from memory in order, and pass a 25-question mixed quiz on domains 1-3 at 80% or higher
Week 6: Complete the final-check and release checklist without reference material and score at least 80% on a 30-question mixed quiz covering domains 1-5
Week 8: Achieve at least 80% overall on the full-length timed practice session, with no individual domain below 75%